Abutment

Bridges

A structure at the end of a bridge that supports the bridge span and may also retain the approach embankment.

On site
Constructed at bridge ends to transfer deck loads into the foundations and support the transition between the road and bridge.
Don't confuse with
Unlike a bridge pier, an abutment is located at the end of a bridge.

Accelerator

Materials

An admixture that speeds up setting and early strength gain.

On site
Used in cold conditions or when early striking is needed.

Accessible route

Architecture

A continuous path designed to allow people with disabilities or reduced mobility to move safely between designated building areas.

On site
Includes appropriately designed entrances, corridors, ramps, lifts and doorways connecting important facilities.
Don't confuse with
Unlike an ordinary pedestrian route, an accessible route must satisfy applicable accessibility requirements.

Accessible toilet

Architecture

A toilet facility designed to accommodate users with disabilities or reduced mobility through suitable space, fixtures and support features.

On site
Includes compliant access, manoeuvring space, appropriately positioned sanitary fittings and grab rails as required by the relevant standards.
Don't confuse with
Unlike a conventional toilet cubicle, an accessible toilet provides specific space and facilities for users with mobility limitations.

Acoustic ceiling tile

Finishes

A ceiling panel manufactured to absorb sound and help control reverberation within an interior space.

On site
Installed in offices, classrooms, conference rooms and commercial buildings, often within suspended ceiling systems.
Don't confuse with
Unlike ordinary decorative ceiling panels, acoustic tiles are selected for measured sound absorption performance.

Acoustic wall panel

Finishes

A wall-mounted finishing panel designed to absorb sound and reduce unwanted reflections within a room.

On site
Installed in studios, classrooms, conference rooms and auditoriums to improve interior acoustic conditions.
Don't confuse with
Unlike sound insulation within a wall, an acoustic panel mainly controls sound reflections inside a space.

Active earth pressure

Geotechnical

The lateral pressure exerted by soil when a retaining structure moves sufficiently away from the retained ground to mobilise active conditions.

On site
Considered in the design of retaining walls that can move enough to develop active earth pressure.
Don't confuse with
Unlike passive earth pressure, active pressure develops when the wall moves away from the soil.

Adjudication

Contracts

A dispute resolution process in which an appointed adjudicator or board considers a dispute and issues a decision.

On site
Used in construction contracts to address disagreements over payments, variations, delays or other contractual matters.
Don't confuse with
Unlike negotiation, adjudication involves a third party issuing a decision under the applicable procedure.

Admixture

Materials

A chemical added to concrete in small amounts to change its properties, such as a plasticiser or retarder.

On site
Dosed as specified by the manufacturer.

Advance payment

Contracts

Money paid to a contractor before the corresponding construction work is completed, subject to the contract conditions.

On site
May help finance initial equipment, materials and site establishment, with recovery through subsequent payments as specified.
Don't confuse with
Unlike a progress payment, an advance payment is made before the corresponding work has been completed.

Advance payment guarantee

Contracts

A financial guarantee protecting the employer against specified risks associated with advance payments made to a contractor.

On site
May be required before an employer releases an agreed mobilisation advance for construction works.
Don't confuse with
Unlike performance security, an advance payment guarantee specifically secures the advance payment obligation.

Aggregate

Materials

The granular material mixed with cement and water to make concrete or mortar. Fine aggregate is sand; coarse aggregate is crushed stone (ballast).

On site
You check aggregate for size, cleanliness and grading before it goes into the mixer. Dirty aggregate weakens concrete.
Site name
Kokoto (coarse aggregate), mchanga (sand)
Don't confuse with
Ballast is one type of aggregate (coarse). Sand is fine aggregate.

Aggregate crushing value (ACV)

Lab testing

A test measuring how much aggregate breaks down under a slowly applied load.

On site
Lower values mean stronger aggregate.

Aggregate impact value (AIV)

Lab testing

A test measuring how aggregate resists sudden impact.

On site
Used to check aggregate for road surfaces and concrete.

Aggregate soundness test

Lab testing

A test that evaluates aggregate resistance to deterioration from repeated environmental action, commonly simulated using salt crystallisation cycles.

On site
Used when assessing aggregate durability for exposed concrete and road construction. Results may be expressed as percentage mass loss.
Don't confuse with
Unlike abrasion testing, soundness testing evaluates resistance to simulated weathering rather than mechanical wear.

Aggregate water absorption test

Lab testing

A test that measures the amount of water absorbed into aggregate pores under specified soaking and drying conditions.

On site
Performed during concrete mix design and aggregate quality checks. Results help engineers adjust mixing water and assess aggregate porosity.
Don't confuse with
Unlike moisture content, absorption concerns water held within accessible aggregate pores under specified conditions.

Air compressor

Plant

A machine that compresses air and supplies it at increased pressure for operating pneumatic tools and equipment.

On site
Used to power pneumatic breakers, drilling equipment, cleaning tools and other compressed-air machinery on construction sites.
Don't confuse with
Unlike a hydraulic power unit, an air compressor supplies pressurised air rather than hydraulic fluid.

Air gap (plumbing)

Plumbing

An unobstructed vertical separation between a water supply outlet and the flood level of a receiving vessel or fixture.

On site
Provided at suitable tank filling points and plumbing fixtures to protect drinking water supplies against backflow contamination.
Don't confuse with
Unlike a mechanical backflow preventer, an air gap provides physical separation between the supply and potentially contaminated water.

Air valve

Plumbing

A valve at high points of a water main that releases trapped air.

On site
Trapped air reduces flow and can cause pipe damage.

Air-entrained concrete

Concrete

Concrete containing deliberately introduced microscopic air bubbles that improve resistance to freezing and thawing under suitable conditions.

On site
Specified mainly for concrete exposed to freeze-thaw conditions, with air content controlled through mix design and testing.
Don't confuse with
Unlike accidentally trapped air, entrained air consists of intentionally created, distributed microscopic bubbles.

Alkali-silica reaction (ASR)

Concrete

A harmful chemical reaction between alkalis in concrete pore solution and certain reactive silica minerals in aggregates, potentially producing expansive gel.

On site
May cause progressive cracking and expansion in affected structures when reactive aggregates, sufficient alkalis and moisture are present.
Don't confuse with
Unlike ordinary drying shrinkage, ASR can cause concrete expansion.

Alligator cracking

Roads

A network of interconnected pavement cracks resembling crocodile skin, commonly associated with repeated traffic loading and structural fatigue.

On site
Often appears in heavily trafficked wheel paths where asphalt pavement layers or their underlying support have deteriorated.
Don't confuse with
Unlike isolated surface cracks, alligator cracking forms an interconnected pattern associated with pavement fatigue.

Anchorage length

Structural

The length a reinforcing bar must extend into concrete so it can develop its full strength without pulling out.

On site
Steel fixers extend beam bars into columns by this length. It is shown on drawings or worked out from the code.
Don't confuse with
Lap length, which is the overlap between two bars joined end to end.

Anchored retaining wall

Geotechnical

A retaining wall supported by ground anchors that transfer part of the lateral soil load into stable ground behind the wall.

On site
Used for deep excavations and basement construction where space is limited and cantilever wall movement must be controlled.
Don't confuse with
Unlike an unanchored retaining wall, an anchored wall receives additional lateral restraint from ground anchors.

Angle of internal friction

Geotechnical

A soil strength parameter representing the frictional component of resistance to shearing.

On site
Determined from suitable shear tests and used when designing foundations, retaining walls and slopes.
Don't confuse with
Unlike cohesion intercept, friction angle describes the stress-dependent frictional contribution to shear strength.

Angle valve

Plumbing

A small shut-off valve with its inlet and outlet arranged at approximately 90 degrees.

On site
Installed beneath washbasins and beside toilet cisterns to isolate individual appliances without shutting off the entire building supply.
Don't confuse with
Unlike a straight valve, an angle valve changes the direction of flow through its body.

Angular misclosure

Surveying

The difference between the measured sum of survey angles and the theoretical sum required by the survey geometry.

On site
Calculated during closed traverse surveys to check whether observed horizontal angles satisfy the expected geometric relationship.
Don't confuse with
Unlike linear misclosure, angular misclosure concerns disagreement in measured angles.

Annual average daily traffic (AADT)

Roads

The average number of vehicles passing a specified road location each day over an entire year.

On site
Used in road planning, highway design and traffic studies to estimate typical daily traffic demand.
Don't confuse with
Unlike a one-day traffic count, AADT represents the daily average over a full year.

Anti-termite treatment

Earthworks

Chemical treatment of the soil under and around a building to keep termites out.

On site
Applied before blinding and DPM, and around the foundation walls.

Approach slab

Bridges

A reinforced concrete slab connecting a road approach to a bridge, designed to provide a smoother transition between their supporting conditions.

On site
Constructed behind bridge abutments to reduce the effects of differential settlement between the approach embankment and bridge.
Don't confuse with
Unlike the bridge deck, an approach slab forms the transition between the bridge and adjoining roadway.

Arbitration

Contracts

A private dispute resolution process where one or more arbitrators determine a dispute and issue an award.

On site
Used in Kenyan construction disputes where the parties have a valid arbitration agreement or applicable contractual provision.
Don't confuse with
Unlike adjudication, arbitration generally produces an arbitral award under the governing arbitration framework.

Arch bridge

Bridges

A bridge that transfers a significant portion of its loads through compression along one or more curved structural arches.

On site
Constructed using concrete, steel or masonry, with foundations or supporting elements designed to resist the resulting arch forces.
Don't confuse with
Unlike a conventional girder bridge, an arch bridge relies significantly on compression through its curved structural form.

Architrave

Architecture

The decorative timber or plaster moulding fixed around a door or window opening.

On site
Fixed by the carpenter after plastering to cover the joint between the frame and the wall.

Articulated boom lift

Plant

A mobile elevating work platform with a jointed boom that positions workers at height and around obstacles.

On site
Used for facade installation, exterior painting, electrical works and maintenance where workers need elevated horizontal reach.
Don't confuse with
Unlike a scissor lift, an articulated boom lift can extend outward and around obstacles.

As-built drawings

Drawings

Drawings updated at the end of a project to show exactly what was built, including any changes made on site.

On site
The contractor marks every change during construction so the as-builts can be prepared at handover.
Don't confuse with
Construction drawings, which show what was planned before building.

Ashlar masonry

Masonry

Stone masonry constructed using carefully dressed stones with regular shapes and relatively uniform joints.

On site
Used in architectural stone facades, retaining structures and high-quality stonework where accurate stone cutting and neat joints are required.
Don't confuse with
Unlike rubble masonry, ashlar masonry uses carefully shaped stones with regular faces and joints.

Asphalt

Roads

A mix of bitumen and graded aggregate laid hot to form the top layer of a road.

On site
Laid with a paver and compacted with rollers while still hot.
Don't confuse with
Bitumen, which is only the black binder inside the asphalt.

Asphalt binder extraction test

Lab testing

A test that separates bituminous binder from an asphalt mixture to determine binder content using a specified extraction procedure.

On site
Performed on asphalt samples collected during road construction to verify binder content against the approved mix design.
Don't confuse with
Unlike aggregate grading tests, binder extraction primarily determines the amount of bituminous binder in the mixture.

Asphalt concrete

Roads

A pavement material consisting of graded mineral aggregates mixed with bituminous binder and compacted to form a strong road layer.

On site
Produced at an asphalt mixing plant, transported to site and laid using an asphalt paver before roller compaction.
Don't confuse with
Unlike cement concrete, asphalt concrete uses bitumen as its main binder.

Asphalt milling machine

Plant

A road maintenance machine fitted with a rotating cutting drum that removes asphalt pavement to a controlled depth.

On site
Used when rehabilitating worn roads, removing damaged asphalt layers and preparing existing pavements for resurfacing.
Don't confuse with
Unlike an asphalt paver, a milling machine removes existing pavement rather than placing new material.

Asphalt overlay

Roads

A new asphalt layer placed over an existing pavement to improve surface condition or increase structural capacity.

On site
Used during road rehabilitation after assessing pavement defects, preparing the surface and applying suitable bonding treatment.
Don't confuse with
Unlike complete pavement reconstruction, an overlay retains much of the existing pavement structure.

Asphalt paver

Plant

A road construction machine that receives hot asphalt mixture, spreads it and provides initial shaping and compaction through a screed.

On site
Used when laying asphalt surfacing on highways, urban roads, parking areas and other paved surfaces.
Don't confuse with
Unlike a road roller, an asphalt paver primarily places and levels asphalt before final compaction.

At-rest earth pressure

Geotechnical

The lateral soil pressure acting when the retained ground undergoes essentially no lateral deformation.

On site
Used when designing stiff basement walls and other retaining structures that cannot move sufficiently to mobilise active conditions.
Don't confuse with
Unlike active earth pressure, at-rest pressure does not require outward wall movement.

Atrium

Architecture

A large open internal space extending through two or more floors of a building, often receiving natural light from above.

On site
Common in shopping malls, hotels and office buildings, where it creates a central gathering space and connects different floors.
Don't confuse with
Unlike a courtyard, an atrium is generally enclosed within the building.

Atterberg limits

Lab testing

The liquid limit, plastic limit and shrinkage limit of a clay soil, which describe how it behaves with water.

On site
Used to classify soils and spot expansive clays.

Autoclaved aerated concrete (AAC) block

Materials

A lightweight masonry unit manufactured from a cementitious mixture containing intentionally formed air pores and hardened under pressurised steam.

On site
Used for internal partitions and suitable external walls, offering relatively low weight and good thermal insulation.
Don't confuse with
Unlike conventional dense concrete blocks, AAC blocks contain numerous small air pores and have lower density.

Autogenous shrinkage

Concrete

Volume reduction caused by internal moisture consumption during cement hydration, even without moisture escaping to the environment.

On site
Particularly important in low water-cement ratio concrete, where internal moisture reduction may contribute to early-age cracking.
Don't confuse with
Unlike drying shrinkage, autogenous shrinkage can occur without external moisture loss.

Automatic transfer switch (ATS)

Electrical

A device that automatically transfers an electrical load between two power sources according to specified operating conditions.

On site
Installed in buildings with standby generators to transfer selected loads when the main electricity supply fails.
Don't confuse with
Unlike a manual changeover switch, an ATS transfers supplies automatically.

Axial load

Structural

A force acting along the longitudinal axis of a structural member, producing either compression or tension.

On site
Columns commonly carry compressive axial loads from upper floors, while some truss members carry axial tension.
Don't confuse with
Unlike a transverse load, an axial load acts along the member's longitudinal axis.

Axle load

Roads

The total load transmitted to the road surface through the wheels connected to a vehicle axle.

On site
Measured during vehicle weighing and considered in pavement design because heavy axle loads significantly affect road deterioration.
Don't confuse with
Unlike gross vehicle weight, axle load represents the load carried by an individual axle or specified axle group.

Azimuth (bearing)

Surveying

The horizontal direction of a line, measured clockwise from north.

On site
Used in traversing and setting out from coordinates.

B

Backfilling

Earthworks

Putting soil back into a trench or around a foundation after the foundation has been built.

On site
Done in layers of about 150 to 200 mm, each one compacted, so the ground does not settle later.

Backflow preventer

Plumbing

A protective device or assembly designed to prevent potentially contaminated water from flowing backward into a clean water supply.

On site
Installed at specified connections where backpressure or backsiphonage could contaminate the potable water system.
Don't confuse with
Unlike a simple check valve, a backflow preventer is selected to provide the required protection against contamination.

Backhoe loader (JCB)

Plant

A machine with a loader bucket at the front and a digging arm at the back.

On site
Very common on Kenyan sites. Often called by the brand name JCB.

Backsight

Surveying

The first staff reading taken after setting up the level, on a point of known height.

On site
It establishes the height of the instrument.
Don't confuse with
Foresight, the last reading before the level is moved.

Backwall

Bridges

A wall forming part of an abutment arrangement that retains approach fill behind the bridge deck end.

On site
Constructed behind the ends of bridge girders to contain approach material and accommodate the specified deck-end arrangement.
Don't confuse with
Unlike a wing wall, a backwall is generally positioned across the bridge approach behind the superstructure.

Backwater effect

Drainage

A rise in upstream water level caused by downstream conditions that restrict or influence normal flow.

On site
May occur when a culvert outlet is submerged by a swollen river, causing water to accumulate upstream.
Don't confuse with
Unlike normal downstream flow, backwater effects cause upstream water levels to increase because of downstream conditions.

Balanced cantilever construction

Bridges

A bridge construction method that extends structural segments outward from a pier in approximately balanced directions.

On site
Used over deep valleys, rivers and busy roads where extensive temporary supports beneath the bridge would be impractical.
Don't confuse with
Unlike conventional span-by-span construction, balanced cantilever construction advances outward from supporting piers.

Ball valve (float valve)

Plumbing

A valve with a float that shuts off water when a tank or cistern is full.

On site
Used in water tanks and toilet cisterns.

Ballast

Materials

Crushed stone used as coarse aggregate in concrete. Common sizes are 20 mm and 6 mm (chippings).

On site
Ordered by the tonne or by the lorry. The structural drawing or specification tells you the size.
Site name
Kokoto
Don't confuse with
Hardcore, which is larger broken stone used as a bed under slabs.

Balustrade

Architecture

A railing with supports along the edge of a stair, balcony or landing.

On site
Height and gap sizes are set for safety.

Banksman (traffic marshal)

Health and safety

A trained person who directs vehicle or equipment movements using agreed signals or communication methods.

On site
Guides reversing tipper trucks and other site vehicles where visibility or pedestrian movement creates additional risks.
Don't confuse with
Unlike a crane operator, a banksman guides movements without operating the equipment.

Bar bending schedule (BBS)

Structural

A table listing every reinforcing bar in a member: bar mark, size, shape, dimensions, number and cutting length.

On site
The steel fixer cuts and bends bars from the BBS, and the quantity surveyor uses it to order steel.

Bar buckling

Structural

Sideways instability of a reinforcing bar subjected to compression, particularly when lateral restraint is insufficient.

On site
May develop in heavily compressed or earthquake-damaged columns when transverse reinforcement does not adequately restrain longitudinal bars.
Don't confuse with
Unlike tensile yielding, bar buckling is an instability associated with compression.

Bar mark

Drawings

The reference number given to a group of identical bars on a structural drawing, such as 01 or 12.

On site
Every bar mark on the drawing appears once in the BBS, so you can trace it from paper to site.

Barge board

Roofing

A board fixed along the sloping edge of a gable roof.

On site
Covers the ends of the roof timbers at the gable.

Base course

Roads

The main load-spreading layer of a road, laid on the sub-base and below the surfacing.

On site
Often graded crushed stone, compacted to a specified density and tested before surfacing.
Don't confuse with
Sub-base, the layer below it.

Base plate

Structural

A steel plate welded to the bottom of a steel column and bolted to the foundation.

On site
Set on grout to the right level with holding-down bolts.

Batching

Concrete

Measuring out the cement, sand, aggregate and water for a concrete mix, either by volume or by weight.

On site
On small sites a gauge box is used for volume batching. Ready-mix plants batch by weight, which is more accurate.

Batter

Earthworks

The inclined face of an excavation, embankment or earth structure formed at a specified slope.

On site
Earthworks drawings may specify batter slopes such as 1 vertical to 2 horizontal, depending on ground conditions and design requirements.
Don't confuse with
Unlike a vertical excavation face, a batter is intentionally inclined.

Bay window

Architecture

A window arrangement that projects outward from the main external wall of a building.

On site
Used in residential and commercial buildings to increase daylight, improve views and create additional interior space.
Don't confuse with
Unlike a flush window, a bay window extends beyond the main wall face.

Beacon

Surveying

A survey mark, usually a concrete post, that shows a plot boundary corner.

On site
Confirm beacons with a licensed surveyor before setting out a building near a boundary.

Beam

Structural

A horizontal structural member that carries loads from slabs or walls and transfers them to columns or walls.

On site
On a drawing, beams are labelled B1, B2 and so on, with their size and reinforcement shown in a section.
Don't confuse with
Lintel, which is a short beam only over an opening.

Beam-column joint

Structural

The structural region where one or more beams connect to a column and transfer forces between the members.

On site
Requires careful reinforcement arrangement, anchorage and concrete compaction because substantial forces may concentrate within the connection.
Don't confuse with
A beam-column joint is the connecting region, while a column or beam is an individual structural member.

Bearing capacity

Geotechnical

The maximum pressure the soil can safely carry without failing or settling too much, usually given in kN/m².

On site
Engineers use it to size foundations. It comes from a soil investigation report.

Bed joint

Masonry

The horizontal mortar joint between courses.

On site
Usually about 10 mm thick.

Belt truss

Structural

A horizontal truss system extending around part or all of a building's perimeter to connect multiple columns structurally.

On site
Often combined with outriggers in tall buildings to distribute forces among perimeter columns and improve lateral stiffness.
Don't confuse with
An outrigger links the core to perimeter elements, while a belt truss connects perimeter columns.

Benching

Drainage

Shaped concrete at the bottom of a manhole that guides flow into the outgoing channel.

On site
Sloped towards the channel so solids do not settle.

Benchmark

Surveying

A permanent point of known level used as a reference for levelling.

On site
Site levels are carried from a benchmark to a temporary benchmark (TBM) near the works.

Bending moment

Structural

The internal turning effect in a beam caused by loads, which makes it bend.

On site
Tells you where the main steel goes: bottom at mid-span, top over supports.

Bending moment diagram (BMD)

Structural

A graph showing how bending moment varies along a beam.

On site
Used to place and curtail reinforcement.

Bentonite waterstop

Materials

A swelling sealing strip containing bentonite clay, designed to expand when exposed to water and restrict water passage through a concrete joint.

On site
Installed at specified construction joints in basements, retaining structures and water-retaining concrete before the adjoining concrete is placed.
Don't confuse with
Unlike conventional PVC waterstops, bentonite waterstops rely on controlled swelling to develop their seal.

Berm

Earthworks

A relatively level strip or platform formed along a slope, excavation or embankment.

On site
Provided on high cut slopes to improve stability, assist maintenance access or intercept falling material, depending on the design.
Don't confuse with
Unlike a batter, which is inclined, a berm is a relatively level feature.

Biaxial bending

Structural

Bending of a structural member about two perpendicular axes at the same time.

On site
Corner columns and columns in irregular frames may require biaxial bending checks when moments act in both principal directions.
Don't confuse with
Unlike uniaxial bending, biaxial bending involves moments about two axes.

Bib tap

Plumbing

A wall-mounted or pipe-mounted tap with a downward-facing outlet, often used for drawing water or connecting a hose.

On site
Common at external washing points, construction site water connections and residential compounds.
Don't confuse with
Unlike a mixer tap, a bib tap generally controls water from one supply line.

Bid security

Contracts

A financial guarantee provided with a tender to protect the procuring entity against specified bidder defaults.

On site
May be required in construction tenders, with its amount, form and validity period stated in the tender documents.
Don't confuse with
Unlike performance security, bid security applies to specified obligations during the tendering and award process.

Bill of Quantities (BOQ)

Contracts

A document listing every item of work in a project, with its quantity and unit, so contractors can price it.

On site
Contractors fill in rates to make their tender, and the BOQ is used later to value work done.
Don't confuse with
Bar bending schedule, which only covers reinforcement.

BIM clash detection

Drawings

A digital coordination process that identifies conflicts between building elements represented in combined building information models.

On site
Used to detect problems such as pipes passing through beams or ventilation ducts occupying the same space as structural members.
Don't confuse with
Unlike ordinary visual drawing review, clash detection uses model geometry to identify potential spatial conflicts.

Binder course

Roads

An intermediate asphalt layer placed beneath the wearing course to provide structural support and distribute traffic loads.

On site
Laid and compacted before the final asphalt surfacing on roads requiring a multi-layer asphalt pavement.
Don't confuse with
Unlike the wearing course, the binder course is not normally the finished road surface.

Binding wire

Materials

Soft annealed wire used to tie reinforcement bars together.

On site
Twisted with a pincer. Ends are bent inward so they do not touch the cover.

Bitumen

Roads

A black, sticky binder made from crude oil, used to bind aggregate in road surfaces.

On site
Used in prime coats, tack coats, surface dressing and asphalt.

Bitumen distributor

Plant

A specialised vehicle or spraying unit that applies controlled quantities of liquid bituminous binder over a prepared road surface.

On site
Used during prime coating, tack coating and surface dressing, with application rates checked against the project specification.
Don't confuse with
Unlike a chip spreader, a bitumen distributor sprays binder rather than distributing stone chippings.

Bitumen ductility test

Lab testing

A test measuring how far a prepared bitumen specimen can stretch under specified conditions before breaking.

On site
Used in selected bitumen specifications to assess the material's ability to elongate under controlled testing conditions.
Don't confuse with
Unlike penetration testing, ductility testing measures elongation before rupture rather than resistance to needle penetration.

Bitumen emulsion

Roads

A mixture of fine bitumen droplets dispersed in water using an emulsifying agent.

On site
Used in selected tack coats, surface treatments, cold asphalt mixes and pavement maintenance operations.
Don't confuse with
Unlike cutback bitumen, bitumen emulsion uses water as the continuous phase rather than a petroleum solvent.

Bitumen flash point test

Lab testing

A test determining the lowest specified temperature at which vapours from heated bituminous material briefly ignite when exposed to an ignition source.

On site
Used to assess safe heating and handling temperatures during bitumen storage, transport and road construction.
Don't confuse with
Unlike fire point, flash point indicates brief ignition rather than sustained burning.

Bitumen penetration test

Lab testing

A test measuring the depth a standard needle penetrates bitumen under specified load, temperature and time conditions.

On site
Used to classify penetration-grade paving bitumen. Results are commonly reported in tenths of a millimetre.
Don't confuse with
Unlike the bitumen softening point test, penetration testing measures consistency under specified conditions.

Bituminous roof shingle

Roofing

A small overlapping roofing element made from a bitumen-based material, commonly reinforced and surfaced with mineral granules.

On site
Installed over a suitable continuous roof deck and underlay on pitched roofs, following specified fastening and overlap arrangements.
Don't confuse with
Unlike metal roofing sheets, bituminous shingles are installed as smaller overlapping flexible roofing units.

Black cotton soil

Geotechnical

A dark, highly expansive clay found in parts of Kenya that swells when wet and cracks when dry.

On site
Usually removed or treated before building. Foundations go below the active zone.

Bleeding

Concrete

Water rising to the surface of freshly placed concrete as the heavier particles settle.

On site
A little bleeding is normal. Too much shows a wet or poorly graded mix and gives a weak, dusty surface.

Blinding

Concrete

A thin layer of weak concrete (about 50 to 75 mm) laid at the bottom of an excavation.

On site
Gives a clean, level surface to set out and place reinforcement on, and keeps steel off the soil.
Don't confuse with
Hardcore, which is broken stone fill, not concrete.

Bolt hole clearance

Steel and timber

The difference between a bolt's nominal diameter and the diameter of the hole provided for it.

On site
Checked during steel fabrication to ensure bolts fit correctly while complying with connection design and fabrication tolerances.
Don't confuse with
Unlike bolt spacing, hole clearance concerns the fit between an individual bolt and its hole.

Bond

Masonry

The pattern in which blocks or bricks are laid so that vertical joints do not line up, making the wall strong.

On site
Stretcher bond (half-block overlap) is the most common pattern for block walls.

Bond failure

Structural

Loss of adequate force transfer between reinforcement and surrounding concrete due to insufficient bond resistance.

On site
May occur where anchorage is inadequate, concrete splits around bars or reinforcement detailing does not provide sufficient development capacity.
Don't confuse with
Unlike steel tensile failure, bond failure involves inadequate force transfer between reinforcement and concrete.

Booster pump

Plumbing

A pump used to increase water pressure where the available supply pressure is insufficient.

On site
Installed in multi-storey buildings and compounds where incoming water pressure cannot adequately serve elevated or distant fixtures.
Don't confuse with
Unlike a gravity-fed supply, a booster pump uses mechanical energy to increase water pressure.

Borehole (geotechnical)

Geotechnical

A drilled hole used to sample soil and rock at depth.

On site
Used for larger buildings and bridges.

Borrow pit

Earthworks

An excavation from which suitable soil or granular material is obtained for use elsewhere on a construction project.

On site
Road contractors may obtain approved embankment or fill material from authorised borrow pits after carrying out required material tests.
Don't confuse with
Unlike a spoil disposal area, a borrow pit supplies construction material.

Bottle trap

Plumbing

A compact plumbing trap with a bottle-shaped chamber that retains water to prevent sewer gases from entering a room.

On site
Commonly fitted beneath washbasins, especially where the waste connection remains visible below the basin.
Don't confuse with
Unlike a P-trap, a bottle trap uses a compact chamber rather than a curved pipe arrangement.

Boundary reinstatement

Surveying

The process of re-establishing a previously surveyed property boundary using authoritative survey records and available field evidence.

On site
A licensed surveyor may reinstate missing boundary marks using registered survey information and suitable control measurements.
Don't confuse with
Unlike establishing a new boundary, reinstatement recovers the position of an existing legally defined boundary.

Box girder

Bridges

A structural girder with a closed or partly closed box-shaped cross-section, providing high torsional stiffness.

On site
Used in curved bridges, long-span structures and elevated highways where bending and twisting resistance are important.
Don't confuse with
Unlike an open I-shaped girder, a box girder has an enclosed or cellular cross-section.

Box gutter

Roofing

A rectangular gutter set within the roof, often behind a parapet.

On site
Needs generous size and good waterproofing because leaks are hidden.

Braced frame

Structural

A structural frame containing diagonal or other bracing members that resist lateral loads through axial forces.

On site
Common in steel buildings, warehouses and industrial structures where diagonal steel members improve stability against wind loads.
Don't confuse with
Unlike a moment-resisting frame, a braced frame relies mainly on axial forces in its bracing members.

BRC mesh

Structural

Welded steel fabric made of bars in a square grid, named after the original manufacturer. Sizes are given by a reference such as A142.

On site
Laid in ground slabs and toppings instead of loose bars to control cracking.
Site name
BRC

Break line

Drawings

A drawing line symbol indicating that part of an object or view has been omitted to shorten its representation.

On site
Used when illustrating long beams, pipes or structural members without drawing their full physical length.
Don't confuse with
Unlike a match line, a break line indicates omitted material within a drawing view.

Brick bat

Masonry

A portion of a brick cut across its length to provide a shorter masonry unit.

On site
Used to complete brick courses around corners, openings and wall ends where full-length bricks cannot fit.
Don't confuse with
Unlike a queen closer, a brick bat is shortened by cutting across the brick length.

Brick frog

Masonry

A recessed depression formed on one face of certain clay bricks to help accommodate mortar and identify the brick.

On site
Bricklayers position frogged bricks according to the specified bonding and laying requirements to achieve proper mortar contact.
Don't confuse with
Unlike a perforation, a brick frog is a recess that does not normally pass completely through the brick.

Bridge bearing

Bridges

A structural device placed between a bridge superstructure and its support to transfer loads while allowing specified movement or rotation.

On site
Installed between girders and pier caps or abutments, following approved bearing layouts and installation levels.
Don't confuse with
Unlike a fixed structural connection, a bridge bearing may permit controlled translation or rotation.

Bridge clearance

Bridges

The available unobstructed distance beneath or beside a bridge, measured according to specified vertical or horizontal clearance requirements.

On site
Checked where bridges cross highways, railways or navigation routes to ensure adequate space for permitted traffic.
Don't confuse with
Unlike bridge freeboard, clearance may refer to the space required for vehicles, trains or vessels.

Bridge deck

Bridges

The structural platform of a bridge that supports vehicles, pedestrians or other traffic and transfers their loads to supporting members.

On site
Often constructed using reinforced concrete, prestressed concrete or composite steel-concrete systems, with suitable surfacing and drainage.
Don't confuse with
Unlike a bridge girder, the deck forms the main traffic-supporting platform.

Bridge freeboard

Bridges

The vertical distance between a specified design flood water level and the designated underside level of a bridge superstructure.

On site
Checked during bridge hydraulic design to provide allowance above expected flood levels, considering relevant design requirements.
Don't confuse with
Unlike general bridge clearance, freeboard specifically concerns the vertical separation above the design water level.

Bridge girder

Bridges

A primary structural beam that supports a bridge deck and transfers loads to piers or abutments.

On site
Steel or prestressed concrete girders are lifted into position and connected to form the main supporting system beneath bridge decks.
Don't confuse with
Unlike the bridge deck, a girder primarily supports and transfers the deck loads.

Bridge inspection

Bridges

A systematic examination of a bridge to identify defects, deterioration, damage and changes affecting its condition or performance.

On site
Engineers inspect decks, bearings, joints, piers, abutments and foundations, recording defects and recommending maintenance or further investigation.
Don't confuse with
Unlike bridge load rating, inspection primarily records physical condition rather than calculating load-carrying capacity.

Bridge load rating

Bridges

An engineering assessment of the safe load-carrying capacity of an existing bridge under specified loading and condition assumptions.

On site
Performed when evaluating older bridges, abnormal vehicle loads or structures showing deterioration, using inspection findings and structural calculations.
Don't confuse with
Unlike original bridge design, load rating evaluates the capacity of an existing structure.

Bridge pier

Bridges

An intermediate structural support that carries loads from a bridge superstructure to its foundations.

On site
Found beneath multi-span bridges crossing rivers, valleys and highways, commonly constructed from reinforced concrete or steel.
Don't confuse with
Unlike an abutment, a pier supports the bridge between its ends.

Bridge scour

Bridges

The removal of riverbed or surrounding soil by flowing water near bridge foundations, piers or abutments.

On site
Investigated when designing river crossings because excessive scour can expose foundations and reduce structural stability.
Don't confuse with
Unlike general riverbank erosion, bridge scour specifically concerns erosion affecting the ground around bridge supports.

Brise-soleil

Architecture

An architectural shading system designed to reduce direct sunlight entering a building through windows or glazed facades.

On site
Installed on sun-exposed facades using horizontal or vertical fins to improve thermal comfort and reduce solar heat gain.
Don't confuse with
Unlike decorative facade fins, a brise-soleil is specifically designed to control solar exposure.

Brittle failure

Structural

A failure that occurs with little significant plastic deformation or warning before a structural member loses resistance.

On site
Engineers seek to avoid brittle failure mechanisms, particularly in critical reinforced concrete members and structural connections.
Don't confuse with
Unlike ductile failure, brittle failure develops with limited deformation and warning.

Buckling

Structural

Sudden sideways bending of a slender member under compression.

On site
Prevented by limiting slenderness and providing restraint.

Building envelope

Architecture

The physical elements separating a building's conditioned or occupied interior from the external environment.

On site
Includes external walls, roofs, windows, doors and associated interfaces that influence weather protection and thermal performance.
Don't confuse with
Unlike the structural frame, the building envelope primarily separates and protects interior spaces from external conditions.

Building line

Surveying

The line set by the planning authority beyond which no part of a building may be built, usually measured from the road reserve.

On site
Checked during setting out so the building is not too close to the road.

Building line encroachment

Architecture

Construction that extends beyond a prescribed building line into an area where development is restricted.

On site
Identified when proposed walls, extensions or other structures cross approved building lines on planning or setting-out drawings.
Don't confuse with
Unlike an approved building setback, encroachment involves construction extending into a restricted area.

Building orientation

Architecture

The positioning of a building relative to compass directions, sunlight, prevailing winds and surrounding site features.

On site
Architects consider orientation when locating windows, rooms and shading elements to improve daylight and thermal comfort.
Don't confuse with
Unlike building alignment, orientation specifically considers directional relationships affecting the building's environmental performance.

Building permit

Architecture

Official authorisation allowing specified building works to proceed after the relevant plans and requirements have been reviewed.

On site
Developers obtain required county construction approvals and other statutory clearances before commencing regulated building works.
Don't confuse with
Unlike development permission, a building permit specifically authorises the approved construction works.

Bulk excavation

Earthworks

Large-scale removal of soil or rock to create the required ground levels for construction.

On site
Common when preparing basement excavations, building platforms and road corridors using excavators, bulldozers and tipper trucks.
Don't confuse with
Unlike trench excavation, bulk excavation generally involves removing material across a relatively large area.

Bulking

Earthworks

The increase in volume of soil after it is dug, or of damp sand compared with dry sand.

On site
You plan lorry trips on the loose (bulked) volume, not the volume in the ground.

Bull float

Concrete

A wide, flat finishing tool with a long handle used to level and smooth freshly placed concrete surfaces.

On site
Used shortly after screeding concrete slabs to flatten ridges and embed coarse aggregate before subsequent finishing operations.
Don't confuse with
Unlike a power float, a bull float is manually guided across fresh concrete during early finishing.

Bulldozer

Plant

A powerful tracked or wheeled machine fitted with a large front blade for pushing soil, rock and other loose materials.

On site
Used in road construction, site clearing, spreading fill and preparing large construction areas before excavation or compaction.
Don't confuse with
Unlike a wheel loader, a bulldozer primarily pushes material rather than lifting and loading it.

Busbar

Electrical

A metallic conductor, commonly made from copper or aluminium, used to distribute electrical power between multiple circuits or devices.

On site
Found inside distribution boards and switchboards, where it connects incoming power to circuit breakers and other equipment.
Don't confuse with
Unlike an ordinary insulated cable, a busbar is usually a rigid conductor designed for power distribution.

Butt hinge

Finishes

A door or window hinge consisting of two leaves joined by a central pin, allowing the connected element to rotate.

On site
Fixed between door leaves and frames, with hinge size and quantity selected according to the door's weight and use.
Don't confuse with
Unlike a concealed hinge, a conventional butt hinge has visible leaves or a visible knuckle when installed.

Butt weld

Steel and timber

A weld joining two components positioned approximately in the same plane or aligned end to end.

On site
Used when joining steel plates and structural sections where a continuous connection across the joint is required.
Don't confuse with
Unlike a fillet weld, a butt weld joins edges or ends of aligned components.

Butterfly roof

Roofing

A roof formed by two surfaces sloping downward towards a central valley, creating a shape resembling butterfly wings.

On site
Used in some modern architectural designs. The central drainage system requires careful waterproofing and adequate discharge capacity.
Don't confuse with
Unlike a gable roof, a butterfly roof directs water inward towards a central valley.

C

Cable derating

Electrical

Reduction of a cable's allowable current-carrying capacity to account for installation or environmental conditions.

On site
Applied when sizing cables installed in hot locations, thermal insulation or groups of closely spaced circuits.
Don't confuse with
Unlike ordinary cable rating, derating accounts for conditions that reduce safe current-carrying capacity.

Cable gland

Electrical

A fitting that secures a cable where it enters electrical equipment and may provide sealing, strain relief and earthing continuity.

On site
Installed at electrical panels, motor terminal boxes and junction enclosures, especially where armoured cables are used.
Don't confuse with
Unlike a cable lug, a cable gland secures the cable entry rather than terminating its conductor.

Cable ladder

Electrical

A cable support system consisting of two side rails joined by regularly spaced cross members.

On site
Used in industrial plants, electrical rooms and larger buildings to support heavy or numerous power cables.
Don't confuse with
Unlike a cable tray, a cable ladder has an open structure with spaced supporting rungs.

Cable lug

Electrical

A metallic terminal fitting attached to the end of an electrical conductor to provide a secure connection.

On site
Crimped onto suitable cable ends before connecting them to switchgear, equipment terminals or earthing bars.
Don't confuse with
Unlike a cable gland, a cable lug provides the electrical conductor termination.

Cable tray

Electrical

A supporting system consisting of a continuous tray that carries and organises electrical cables.

On site
Installed above suspended ceilings and in service corridors to support power, lighting and communication cables.
Don't confuse with
Unlike electrical conduit, a cable tray supports cables without fully enclosing them.

Cable-stayed bridge

Bridges

A bridge whose deck is supported by inclined tension cables connected directly to one or more towers.

On site
Used for long-span crossings where cables transfer deck loads into towers and their supporting foundations.
Don't confuse with
Unlike a suspension bridge, its stay cables connect directly between the deck and towers.

CAD block

Drawings

A collection of drawing objects combined into one reusable named object within a CAD drawing.

On site
Used for repeated symbols such as doors, furniture, electrical sockets and standard structural details.
Don't confuse with
Unlike a CAD layer, a CAD block groups objects into a reusable drawing component.

CAD layer

Drawings

A digital organisational level used in computer-aided drafting to group drawing objects and control their display properties.

On site
AutoCAD users organise walls, doors, reinforcement, dimensions and electrical elements into separate layers for easier editing and printing.
Don't confuse with
Unlike a CAD block, a layer organises drawing objects without necessarily combining them into one reusable object.

Cadastral survey

Surveying

A land survey undertaken to establish, define or document property parcel boundaries for legal land administration purposes.

On site
Performed by appropriately licensed survey professionals in Kenya for land subdivision, boundary determination and registration-related processes.
Don't confuse with
Unlike a topographic survey, a cadastral survey focuses on legally defined land parcel boundaries.

Calibration certificate

Site practice

A document recording the calibration results of measuring equipment against recognised reference standards.

On site
Checked for total stations, pressure gauges, weighing equipment and testing machines before measurements requiring verified accuracy.
Don't confuse with
Unlike a routine inspection record, a calibration certificate documents measurement performance against reference values.

Camber

Roads

The slope across a road from the centre to the edges so rainwater runs off.

On site
Typically about 2.5 to 3% on paved roads. Checked with a camber board and level.
Don't confuse with
Superelevation, the one-way tilt on a bend.

Canopy

Architecture

A projecting roof over a door, window or walkway.

On site
Often a cantilever slab with top steel.

Cantilever

Structural

A beam or slab fixed at one end and free at the other, like a balcony.

On site
Its main steel is at the TOP, because the top is in tension. Putting it at the bottom is a common and dangerous mistake.

Capacity design

Structural

A structural design approach that intentionally controls where yielding occurs while protecting other elements against undesirable failure.

On site
Used in seismic design to ensure selected ductile regions can yield while critical connections and supporting elements retain adequate resistance.
Don't confuse with
Unlike ordinary strength design alone, capacity design considers the intended sequence and location of yielding.

Capping layer

Roads

A layer of selected material placed over weak subgrade to provide a suitable foundation for subsequent pavement construction.

On site
Used when natural ground does not provide adequate support for construction traffic or the designed pavement layers.
Don't confuse with
Unlike the sub-base, a capping layer primarily improves support over weak underlying ground.

Carbonation

Concrete

A chemical process in which atmospheric carbon dioxide reacts with compounds in hardened cement paste, reducing concrete alkalinity.

On site
Engineers assess carbonation depth when investigating older reinforced concrete structures because reduced alkalinity can increase reinforcement corrosion risk.
Don't confuse with
Unlike chloride ingress, carbonation reduces concrete alkalinity through reaction with carbon dioxide.

Carpet tile

Finishes

A modular carpet flooring unit manufactured in standard sizes for installation individually across a floor.

On site
Common in offices, hotels and meeting rooms, where damaged or stained units can be replaced without removing an entire carpet.
Don't confuse with
Unlike broadloom carpet, carpet tiles are installed as individual modular pieces.

Carriageway

Roads

The part of a road used by vehicles, made up of one or more traffic lanes.

On site
Width is shown on the road cross-section, excluding shoulders and walkways.

Castellated beam

Steel and timber

A steel beam manufactured by cutting and rejoining a rolled section to create a deeper web with repeated openings, commonly hexagonal.

On site
Used for long-span floor and roof structures where reduced weight and openings for building services are beneficial.
Don't confuse with
Unlike a cellular beam, a castellated beam commonly has angular rather than circular web openings.

Casual labourer

Site practice

A worker hired on a daily basis for general site work.

On site
Track attendance and payments carefully in the site records.
Site name
Kibarua

Catch basin

Drainage

A drainage structure that collects surface runoff and provides a sump where some sediment and debris can settle before water enters a drainage pipe.

On site
Installed in roads, parking areas and paved compounds to collect rainwater and reduce the amount of sediment entering underground storm drains.
Don't confuse with
Unlike a simple grated inlet, a catch basin includes a sump for collecting sediment.

Catch drain

Earthworks

A drainage channel constructed to intercept surface runoff before it reaches an excavation, slope or construction area.

On site
Often constructed above road cuttings or excavation boundaries to divert uphill runoff away from exposed slopes.
Don't confuse with
Unlike a toe drain, a catch drain commonly intercepts runoff before it flows down a slope.

Cavity closer

Masonry

A manufactured or constructed component used to close the exposed cavity around openings in cavity masonry walls.

On site
Installed around windows and doors to improve detailing, limit thermal bridging and provide a suitable edge for finishing.
Don't confuse with
Unlike a cavity tray, a cavity closer seals the cavity edge rather than directing collected water outward.

Cavity tray

Masonry

A waterproof barrier installed within a cavity wall to collect penetrating moisture and direct it towards drainage openings.

On site
Installed above window openings, lintels and other vulnerable locations to prevent water from reaching the internal masonry leaf.
Don't confuse with
Unlike a damp proof course, a cavity tray is specifically arranged to collect and discharge water within a cavity.

Cavity wall

Masonry

A wall constructed with two separate masonry leaves connected by suitable ties and separated by a continuous cavity.

On site
Used in buildings where improved resistance to rain penetration or additional thermal insulation is required.
Don't confuse with
Unlike a solid masonry wall, a cavity wall contains two separate leaves with a space between them.

CBR (California Bearing Ratio)

Lab testing

A test that measures the strength of soil or gravel for road layers, compared with a standard crushed stone.

On site
Used to decide pavement thickness and to accept materials for subgrade, sub-base and base.

Ceiling access panel

Finishes

A removable or hinged opening installed in a ceiling to provide access to concealed building services.

On site
Positioned beneath valves, electrical junctions and mechanical equipment requiring periodic inspection or maintenance.
Don't confuse with
Unlike an ordinary ceiling tile, an access panel is specifically designed for repeated opening.

Ceiling joist

Roofing

A horizontal member that supports the ceiling, often the bottom chord of a truss.

On site
Ceiling boards are fixed to it.

Cellular beam

Steel and timber

A fabricated steel beam containing regularly spaced circular openings through its web.

On site
Used in commercial buildings where ventilation ducts, electrical services and other installations must pass through structural floor beams.
Don't confuse with
Unlike a castellated beam with angular openings, a cellular beam has circular web openings.

Cement

Materials

A fine grey powder that reacts with water and binds sand and aggregate together. In Kenya it comes in 50 kg bags.

On site
Stored off the ground in a dry, covered place and used within its shelf life. Lumpy cement should be rejected.
Site name
Saruji

Cement particle board

Materials

A manufactured board made by binding wood particles with cement to form rigid construction panels.

On site
Used in suitable wall panels, flooring substrates, partitions and prefabricated building systems.
Don't confuse with
Unlike fibre cement board, cement particle board incorporates wood particles as a major reinforcing constituent.

Centreline

Drawings

A line representing the central axis or geometric centre of an object, opening or structural feature.

On site
Used to indicate the axes of columns, circular openings, pipes and other elements requiring accurate positioning.
Don't confuse with
Unlike an ordinary visible edge line, a centreline represents an axis rather than a physical boundary.

Ceramic tile

Finishes

A hard finishing unit manufactured from shaped clay-based materials and fired in a kiln, sometimes with a glazed surface.

On site
Installed on bathroom walls, kitchen walls and suitable floors using compatible adhesives and grout.
Don't confuse with
Unlike porcelain tiles, ordinary ceramic tiles generally have higher water absorption and lower material density.

Chainage

Surveying

Distance measured along the centre line of a road, pipeline or canal from a starting point.

On site
Written like 1+250, meaning 1,250 m from the start.

Chair (bar chair)

Structural

A bent bar that holds top reinforcement at the right height above the bottom layer.

On site
Placed regularly so top steel is not flattened when people walk on it.

Chamber

Drainage

A small underground structure that gives access to a drain for inspection and cleaning. A larger one is a manhole.

On site
Placed at junctions and changes of direction in a drainage line.

Change of use

Architecture

The conversion of a building or property from one legally recognised use to another.

On site
May require approval when converting residential premises into offices, commercial facilities or another regulated use.
Don't confuse with
Unlike ordinary renovation, change of use concerns the property's authorised function.

Change point (turning point)

Surveying

A stable point used to transfer elevation between successive instrument setups during levelling.

On site
A surveyor takes a foresight on the point before moving the level and a backsight after setting up the instrument again.
Don't confuse with
Unlike a permanent benchmark, a change point may serve only as a temporary elevation transfer point.

Characteristic strength

Materials

The strength below which only a small percentage (usually 5%) of test results are expected to fall.

On site
Design and concrete classes are based on characteristic strength, not the average.

Charpy impact test

Lab testing

A test measuring the energy absorbed when a swinging pendulum fractures a standard notched metal specimen.

On site
Used to assess the notch toughness of structural steel at specified temperatures, particularly where brittle fracture resistance is important.
Don't confuse with
Unlike tensile testing, the Charpy test measures energy absorbed during a rapid impact fracture.

Chase

Electrical

A groove cut into a wall or slab to hide electrical conduits or pipes.

On site
Cut before plastering and filled after the conduit is fixed. Never chase deep into structural members without approval.

Check dam

Earthworks

A small barrier constructed across a drainage channel to slow water flow and reduce erosion.

On site
Installed in temporary site drains using stones, sandbags or approved materials where runoff velocities need controlling.
Don't confuse with
Unlike a major water storage dam, a check dam mainly slows channel flow and limits erosion.

Check levelling

Surveying

A levelling operation performed to verify elevations or identify errors in previous levelling measurements.

On site
Surveyors close a levelling run onto a known benchmark or repeat observations to confirm construction control levels.
Don't confuse with
Unlike initial levelling, check levelling verifies the reliability of previously established elevations.

Check valve (non-return valve)

Plumbing

A valve designed to allow water to flow in one direction while preventing reverse flow.

On site
Installed on pump discharge lines and other suitable water supply connections to prevent water flowing backward.
Don't confuse with
Unlike a gate valve, a check valve normally operates automatically without manual opening or closing.

Chevron alignment sign

Roads

A traffic guidance sign displaying directional chevrons to indicate a significant change in road alignment.

On site
Installed along sharp bends to help drivers recognise the direction and severity of a horizontal curve.
Don't confuse with
Unlike a general warning sign, a chevron alignment sign directly indicates the direction of the bend.

Chip spreader

Plant

A road construction machine that distributes stone chippings uniformly over freshly applied bituminous binder.

On site
Used during surface dressing operations to achieve the specified aggregate coverage before rolling.
Don't confuse with
Unlike an asphalt paver, a chip spreader distributes loose chippings rather than premixed asphalt.

Chloride ingress

Concrete

Movement of chloride ions into hardened concrete through exposure, transport mechanisms or contaminated materials.

On site
Important in coastal structures and concrete exposed to chloride-containing water, where sufficient chloride levels can initiate reinforcement corrosion.
Don't confuse with
Unlike carbonation, chloride ingress introduces chloride ions that can disrupt reinforcement passivation.

Circular hollow section (CHS)

Steel and timber

A steel structural section with a hollow circular cross-section and a continuous wall around its perimeter.

On site
Used in steel columns, trusses, towers, handrails and tubular structures where circular geometry is suitable.
Don't confuse with
Unlike a rectangular hollow section, CHS has a circular rather than rectangular cross-section.

Cistern

Plumbing

A small water tank, such as the one that flushes a toilet.

On site
Fixed and connected with a ball valve and overflow.

Clay roof tile

Roofing

A roofing unit manufactured from shaped clay that is fired to produce a hard, weather-resistant covering.

On site
Installed in overlapping rows on pitched roofs, with tile battens, fixings and roof pitch selected for the particular tile.
Don't confuse with
Unlike concrete roof tiles, clay tiles are manufactured from fired clay rather than cement-based materials.

Cleaning eye (rodding eye)

Drainage

An access cap on a pipe for clearing blockages with rods.

On site
Placed at bends and ends of runs where a manhole is not needed.

Cleat connection

Steel and timber

A steel connection using angle sections or similar fittings to connect structural members through bolts or welds.

On site
Used in suitable beam connections, roof framing and secondary steelwork where practical bolted assembly is required.
Don't confuse with
Unlike a fin plate connection, a cleat connection commonly uses angle-shaped fittings.

Clerestory window

Architecture

A window positioned high on a wall, usually above normal eye level, to admit natural light or ventilation.

On site
Common in churches, classrooms, halls and industrial buildings where high-level daylight is needed.
Don't confuse with
Unlike a conventional wall window, a clerestory window is positioned near the upper part of a wall.

Clerk of works

Site practice

The client's inspector on site who checks quality and records progress.

On site
Works closely with the consultants and contractor.

Closing error

Surveying

The difference between a calculated closing value and its known or expected value after completing a survey measurement sequence.

On site
Checked when levelling returns to a benchmark or reaches another known elevation, helping surveyors assess measurement accuracy.
Don't confuse with
Unlike an individual reading error, closing error represents the accumulated discrepancy across a survey sequence.

Coefficient of consolidation

Geotechnical

A soil parameter describing the rate at which excess pore water pressure dissipates during one-dimensional consolidation.

On site
Used to estimate how quickly clay beneath foundations or embankments will undergo primary consolidation settlement.
Don't confuse with
Unlike the compression index, the coefficient of consolidation concerns settlement rate rather than the amount of compression.

Cofferdam

Bridges

A temporary enclosure constructed within or near water to create a controlled working area for foundation construction.

On site
Used around bridge pier foundations in rivers, allowing water to be pumped out where a suitable dry excavation is required.
Don't confuse with
Unlike ordinary excavation shoring, a cofferdam is specifically arranged to control water entry into an enclosed work area.

Cohesion intercept

Geotechnical

The intercept of a specified soil shear strength envelope on the shear stress axis.

On site
Obtained from appropriate shear strength testing and used with friction angle in geotechnical design calculations.
Don't confuse with
Unlike friction angle, cohesion intercept represents the shear strength component at zero normal stress in the selected model.

Cold joint

Concrete

An unplanned joint where fresh concrete is placed against concrete that has already started to set.

On site
Avoided by planning pours so there are no long stops.
Don't confuse with
Construction joint, which is planned.

Cold roof

Roofing

A roof arrangement where thermal insulation is positioned below the roof deck, leaving the deck on the colder side of the insulation.

On site
Requires appropriate moisture control and, depending on the system, ventilation to reduce condensation risks.
Don't confuse with
Unlike a warm roof, a cold roof places insulation beneath the structural roof deck.

Cold-formed steel

Materials

Steel shaped into structural profiles by bending or rolling relatively thin steel sheets at temperatures below those used for hot rolling.

On site
Common in lightweight roof framing, wall studs, purlins and modular building systems.
Don't confuse with
Unlike hot-rolled steel sections, cold-formed sections are shaped from relatively thin sheet material without hot rolling the final profile.

Collar tie

Roofing

A horizontal member connecting opposing rafters in the upper portion of a pitched roof to help resist separation from uplift.

On site
Installed between suitable rafters according to the roof structural design, particularly where additional restraint against wind uplift is required.
Don't confuse with
Unlike a rafter tie near the lower ends, a collar tie is positioned higher in the roof.

Collector element (drag strut)

Structural

A structural element that gathers horizontal forces from a floor or roof diaphragm and transfers them to lateral load-resisting elements.

On site
Provided where diaphragm forces must reach shear walls or braced frames, particularly around openings and discontinuities.
Don't confuse with
A collector transfers diaphragm shear to resisting elements, while a diaphragm chord resists diaphragm bending forces.

Collimation error

Surveying

An instrumental error caused when the telescope's line of sight does not have the required relationship with the instrument's reference axes.

On site
Checked through instrument calibration procedures because it can affect levelling results and total station observations.
Don't confuse with
Unlike parallax, collimation error concerns instrument alignment rather than apparent movement of the image relative to crosshairs.

Column

Structural

A vertical member that carries loads from beams and slabs down to the foundation.

On site
Labelled C1, C2 on drawings. Check the starter bars from the foundation are in the right place before casting.
Don't confuse with
Pillar, which is usually a non-structural or decorative post.

Column capital

Structural

An enlarged upper portion of a column that provides a wider supporting region beneath a slab or beam.

On site
Found in some flat slab systems where enlargement near the column improves load transfer and can increase punching resistance.
Don't confuse with
Unlike a drop panel, a column capital is an enlargement of the column itself.

Column stump (neck column)

Structural

The short part of a column between the footing and the ground beam or ground slab.

On site
Cast after the footing, with starter bars lapped to column bars above.

Combined sewer

Drainage

A sewer system designed to convey both wastewater and stormwater runoff through the same pipe network.

On site
May be encountered when assessing older urban drainage networks, where heavy rainfall can significantly increase sewer flows.
Don't confuse with
Unlike a separate sewer system, a combined sewer carries wastewater and stormwater together.

Commencement date

Contracts

The date identified under a construction contract from which specified commencement obligations and time requirements take effect.

On site
Used when establishing the contractual construction programme and calculating completion deadlines under applicable contract provisions.
Don't confuse with
Unlike the contract signing date, the commencement date determines when specified construction timing obligations begin.

Compacting factor test

Lab testing

A concrete workability test comparing the mass of partially compacted concrete with the mass of the same volume when fully compacted.

On site
Used in laboratory concrete assessments, particularly for relatively stiff mixtures where slump measurements provide limited sensitivity.
Don't confuse with
Unlike the slump test, compacting factor testing estimates workability using a ratio of concrete masses.

Compaction

Earthworks

Pressing soil or hardcore to remove air and make it denser and stronger.

On site
Done with a plate compactor or roller in layers. Poor compaction leads to settlement and cracked slabs.
Don't confuse with
Consolidation, which is slow settlement of clay over time as water is squeezed out.

Compaction test (Proctor)

Lab testing

A lab test that finds the maximum dry density of a soil and the moisture content at which it is reached.

On site
Site compaction is checked against this result.

Composite beam

Structural

A beam made from different materials that are connected to act together in resisting structural loads.

On site
A steel beam may be connected to a concrete floor slab using shear connectors, allowing the two materials to share bending resistance.
Don't confuse with
Unlike a non-composite beam, a composite beam relies on connected materials acting together.

Composite pavement

Roads

A pavement structure combining concrete and asphalt layers to benefit from the different structural and surface properties of both materials.

On site
May consist of asphalt surfacing over a concrete pavement, including projects where existing concrete roads receive asphalt overlays.
Don't confuse with
Unlike purely flexible or rigid pavement, composite pavement combines asphalt and concrete structural layers.

Composite slab

Structural

A floor slab combining concrete with profiled steel decking that acts compositely when sufficient mechanical connection is provided.

On site
Common in steel-framed buildings. Profiled decking supports wet concrete during construction and may contribute to structural resistance after hardening.
Don't confuse with
Unlike ordinary permanent formwork, composite decking contributes to the finished slab's structural resistance.

Compression fitting

Plumbing

A mechanical pipe fitting that creates a sealed connection by tightening a nut around a compression ring or similar sealing element.

On site
Used to connect compatible copper, plastic or other plumbing pipes without welding or solvent cement.
Don't confuse with
Unlike a solvent-weld joint, a compression fitting creates its seal mechanically.

Compression index

Geotechnical

A parameter describing how the void ratio of normally consolidated soil decreases as effective stress increases on a logarithmic scale.

On site
Obtained from consolidation test results and used to calculate settlement in compressible clay deposits.
Don't confuse with
Unlike the recompression index, the compression index describes compression along the virgin compression line.

Compression reinforcement

Structural

Steel reinforcement placed in a concrete member's compression zone to contribute to resistance or improve structural behaviour.

On site
Found in doubly reinforced beams and columns, where it can help resist compression forces and improve deformation capacity.
Don't confuse with
Tension reinforcement primarily resists tensile forces, while compression reinforcement contributes to resistance in compression.

Compressive strength

Materials

The maximum load per unit area a material can carry in compression before it fails, in N/mm² (MPa).

On site
For concrete it is tested by crushing cubes at 7 and 28 days.

Concrete block

Materials

A precast block of concrete, solid or hollow, used for walling.

On site
Common face size is 400 x 200 mm with different thicknesses.

Concrete boom pump

Plant

A concrete pumping machine equipped with a hydraulically operated articulated boom that supports and positions a concrete delivery pipeline.

On site
Used to place concrete in elevated slabs, columns and hard-to-reach areas on multi-storey construction sites.
Don't confuse with
Unlike a stationary line pump, a boom pump uses an articulated boom to position its delivery hose.

Concrete chute

Concrete

An inclined channel used to guide fresh concrete from a mixer or discharge point into its intended placement area.

On site
Used when placing concrete into accessible foundations, slabs and ground-level formwork, with discharge controlled to reduce segregation.
Don't confuse with
Unlike a concrete pump, a chute primarily relies on gravity to move concrete.

Concrete class (C20, C25...)

Concrete

A label for concrete strength. C25 means a characteristic cube strength of about 25 N/mm² (more precisely C25/30 in Eurocode).

On site
The class on the drawing sets the mix. C20 is roughly a 1:2:4 nominal mix on small sites.

Concrete maturity

Concrete

An index combining concrete temperature and elapsed time to estimate strength development using a verified relationship for the mixture.

On site
Site teams may use embedded temperature sensors and calibrated maturity curves to estimate when concrete reaches specified strength milestones.
Don't confuse with
Unlike concrete age alone, maturity accounts for temperature effects on strength development.

Concrete mixer

Plant

A machine with a rotating drum that mixes concrete.

On site
Load order matters: some water, aggregate, cement, sand, then the rest of the water.

Concrete pop-out

Concrete

A small, localised piece of concrete surface that breaks away, often because a near-surface aggregate particle expands or deteriorates.

On site
Appears as a small shallow crater on slabs or other exposed concrete surfaces, sometimes revealing an aggregate particle.
Don't confuse with
Unlike widespread scaling, a pop-out is usually a small, isolated surface defect.

Concrete pour card

Site practice

A site record or authorisation document used to confirm that specified preparations and approvals are complete before concreting.

On site
May record reinforcement inspection, formwork checks, embedded services, concrete grade, pour location and responsible approvals.
Don't confuse with
Unlike an ordinary delivery note, a pour card records readiness and authorisation for concrete placement.

Concrete pumping

Concrete

The process of transporting fresh concrete through pipes or hoses using a mechanical pump.

On site
Common on multi-storey building sites and locations where mixer trucks cannot discharge concrete directly into formwork.
Don't confuse with
Unlike crane-and-skip placement, pumping moves fresh concrete through a pressurised pipeline.

Concrete roof tile

Roofing

A manufactured roofing unit made from cement, sand and water, shaped and cured to form a durable roof covering.

On site
Installed on suitable pitched roof structures, with supporting members designed for the weight of the tiles.
Don't confuse with
Unlike clay roof tiles, concrete tiles are made from a cement-based mixture.

Concrete skip

Concrete

A lifting container with a controlled discharge opening used to transport and place fresh concrete.

On site
Lifted using a crane to deliver concrete into columns, beams or other areas where direct truck discharge is impractical.
Don't confuse with
Unlike a concrete pump, a concrete skip transports concrete in a lifting container.

Concrete transit mixer

Plant

A truck fitted with a rotating drum that transports fresh concrete while maintaining its mixture consistency during delivery.

On site
Commonly delivers ready-mixed concrete from batching plants to building sites, where discharge may be directed into pumps, skips or formwork.
Don't confuse with
Unlike a stationary concrete mixer, a transit mixer transports concrete between locations.

Concrete water penetration test

Lab testing

A laboratory test that measures the depth water penetrates into hardened concrete under specified hydraulic pressure and exposure conditions.

On site
Used to assess concrete resistance to pressurised water penetration, particularly for basements, tanks and other water-exposed structures.
Don't confuse with
Unlike a water absorption test, this test applies hydraulic pressure to drive water into concrete.

Concurrent delay

Contracts

A situation where separate delaying events overlap in time and affect project completion, with contractual treatment depending on their causes and effects.

On site
Considered when employer-related and contractor-related delays overlap and affect activities controlling the completion date.
Don't confuse with
Unlike sequential delays, concurrent delays overlap during the relevant period.

Conditions of contract

Contracts

Contract provisions setting out the rights, responsibilities, procedures and obligations of the parties involved in a project.

On site
Used to administer payments, instructions, delays, claims, defects and disputes under the selected construction contract.
Don't confuse with
Unlike technical specifications, conditions of contract primarily govern contractual responsibilities and procedures.

Conduit

Electrical

A plastic or metal pipe that carries and protects electrical cables.

On site
Laid in slabs and walls before casting or plastering, so wiring can be pulled through later.

Cone penetration test (CPT)

Lab testing

An in-situ ground investigation test that pushes an instrumented cone into soil at a controlled rate to measure penetration resistance.

On site
Used to develop continuous soil profiles and estimate geotechnical properties from cone resistance, sleeve friction and sometimes pore pressure.
Don't confuse with
Unlike SPT, CPT generally provides continuous penetration measurements without routinely recovering soil samples.

Confined space

Health and safety

An enclosed or partly enclosed space where restricted access, hazardous atmospheres or other specified conditions create serious safety risks.

On site
May include tanks, manholes and certain chambers requiring controlled entry, atmospheric testing and emergency rescue arrangements.
Don't confuse with
Unlike an ordinary small room, a confined space presents specific entry and environmental hazards.

Confinement reinforcement

Structural

Closely arranged transverse reinforcement that restrains concrete expansion and helps improve its strength and deformation capacity under compression.

On site
Used around column cores and critical beam-column regions, particularly in structures requiring earthquake-resistant detailing.
Don't confuse with
Unlike ordinary transverse reinforcement, confinement reinforcement is specifically detailed to restrain concrete and longitudinal bars.

Consolidation

Geotechnical

Slow settlement of clay over time as water is squeezed out under load.

On site
Can continue for years on soft clays.
Don't confuse with
Compaction, which is quick densification by rolling or ramming.

Construction joint

Concrete

A planned joint where one concrete pour stops and the next starts.

On site
Placed where shear is low, as directed by the engineer. The old face is cleaned and roughened before the next pour.
Don't confuse with
Expansion joint, which is a gap designed to let the structure move.

Consumer unit (distribution board)

Electrical

The box that divides incoming power into circuits, each protected by a breaker.

On site
Placed where it is easy to reach. Every circuit is labelled.

Contemporary records

Contracts

Documents and other information created at or near the time construction events and activities occur.

On site
Include site photographs, labour records, delivery notes, correspondence and equipment logs supporting payment or delay claims.
Don't confuse with
Unlike a report reconstructed months later, contemporary records are produced close to the actual events.

Continuous beam

Structural

A beam that runs over more than two supports.

On site
Has hogging moments over internal supports, so it needs top steel there.

Contour

Surveying

A line on a map joining points of equal ground level.

On site
Close contours mean steep ground. Used to plan cut and fill and drainage.

Contract agreement

Contracts

A formal document recording the agreement between contracting parties, including their obligations and references to applicable contract documents.

On site
Signed by the employer and contractor to formalise the agreed construction works, price and contractual arrangements.
Don't confuse with
Unlike tender documents alone, a contract agreement records the parties' agreed contractual relationship.

Contract sum

Contracts

The monetary amount agreed or stated in the contract for executing the specified construction works, subject to applicable adjustments.

On site
Recorded in contract documents and used as a financial reference during payment certification and contract administration.
Don't confuse with
Unlike the final account, the contract sum does not necessarily represent the final amount payable.

Coordinate transformation

Surveying

The mathematical conversion of coordinates from one reference system into another using defined transformation parameters.

On site
Used when combining GNSS observations, engineering drawings and survey information recorded in different coordinate systems.
Don't confuse with
Unlike coordinate conversion within the same datum, some coordinate transformations also change the underlying reference datum.

Coordinates

Surveying

Numbers (Easting and Northing) that give the exact position of a point on a grid.

On site
Total stations and GPS set out points directly from coordinates.

Coordination drawing

Drawings

A drawing combining information from different disciplines to identify spatial conflicts and coordinate installations.

On site
Used to check whether structural beams, ventilation ducts, plumbing pipes and electrical cable routes can fit within the available space.
Don't confuse with
Unlike a single-discipline drawing, a coordination drawing brings together information from multiple disciplines.

Corbel

Structural

A short structural projection from a column or wall that supports a concentrated load, often through compression strut action.

On site
Used to support precast beams, crane girders and other structural members. Its reinforcement must be carefully anchored.
Don't confuse with
Unlike a conventional long cantilever, a corbel has a short projection with significant deep-member behaviour.

Core test

Lab testing

Drilling a cylinder out of hardened concrete and crushing it to find strength.

On site
Used when cube results are in doubt.

Cornice

Finishes

A decorative moulding where the wall meets the ceiling.

On site
Fixed after ceilings are installed.

Corrective action request (CAR)

Site practice

A formal request requiring action to address an identified problem and prevent its recurrence.

On site
Used when repeated workmanship defects or quality failures require investigation, corrective measures and verification.
Don't confuse with
Unlike an NCR, a CAR focuses on actions needed to correct the problem and its causes.

Counter batten

Roofing

A batten installed along the roof slope, commonly beneath transverse roof battens, to create a drainage or ventilation space.

On site
Used in selected tiled roof systems to raise roof battens above the underlay and provide a continuous cavity.
Don't confuse with
Unlike a roof batten, a counter batten commonly runs parallel to the roof slope.

Coupling beam

Structural

A short structural beam connecting two adjacent shear wall sections, allowing them to work together under lateral loading.

On site
Common above doorways or openings in reinforced concrete shear wall cores, especially in multi-storey buildings.
Don't confuse with
Unlike an ordinary floor beam, a coupling beam primarily transfers forces between connected wall sections.

Course

Masonry

One horizontal layer of blocks or bricks in a wall.

On site
Courses are kept level using a line and spirit level.

Courtyard

Architecture

An open-air space surrounded partly or completely by buildings or walls.

On site
Used in residential compounds, schools and institutional buildings to provide outdoor circulation, recreation, daylight and ventilation.
Don't confuse with
Unlike an atrium, a courtyard is generally open to the sky.

Cover (concrete cover)

Structural

The thickness of concrete between the outer surface and the nearest reinforcement.

On site
Kept with spacers (cover blocks). Too little cover lets steel rust; too much reduces strength.

Crack width

Structural

The measured or calculated opening of a crack in concrete, commonly assessed at the surface of a structural member.

On site
Engineers check crack widths in reinforced concrete slabs, beams and water-retaining structures against limits specified for their service conditions.
Don't confuse with
Crack width measures the opening of a crack, while crack spacing measures the distance between cracks.

Crane

Plant

A machine for lifting heavy loads.

On site
Lifts need a plan, a trained operator and a banksman.

Crank (bent-up bar)

Structural

A bar bent so it moves from the bottom to the top of a slab or beam.

On site
Used in older slab designs to provide top steel over supports.

Crash barrier

Roads

A roadside safety barrier designed to contain or redirect vehicles that leave their intended path.

On site
Installed beside dangerous drops, bridge approaches, medians and other locations identified through road safety assessment.
Don't confuse with
Unlike an ordinary pedestrian fence, a crash barrier is designed to resist specified vehicle impacts.

Crazing

Concrete

A network of very fine, shallow cracks that develops on the surface of hardened concrete.

On site
Often visible on finished concrete floors and surfaces, particularly where rapid surface drying or unsuitable finishing practices occurred.
Don't confuse with
Unlike deeper structural cracking, crazing generally affects only a shallow surface layer.

Critical path

Contracts

The sequence of programme activities that determines the earliest possible completion date under the current scheduling assumptions.

On site
Used to identify activities whose delay may affect project completion and to assess the timing impact of project changes.
Don't confuse with
Unlike non-critical activities with available float, critical path activities normally have no remaining scheduling flexibility.

Critical state soil mechanics

Geotechnical

A framework describing soil behaviour at a condition where continued shearing occurs without further changes in volume or effective stress.

On site
Used in advanced geotechnical analysis to model the strength and deformation of sands and clays.
Don't confuse with
Unlike peak strength, critical state strength describes resistance during continued shearing at a steady condition.

Cross ventilation

Architecture

Natural airflow through an indoor space using openings positioned on different sides to encourage air movement.

On site
Achieved by placing suitable windows or ventilation openings on opposing or adjacent walls in residential and commercial buildings.
Don't confuse with
Unlike single-sided ventilation, cross ventilation uses openings on different sides of a space.

Cross-laminated timber (CLT)

Materials

An engineered timber panel made from layers of timber boards bonded together with adjacent layers generally arranged perpendicular to each other.

On site
Used for prefabricated structural walls, floors and roofs in suitable timber building systems.
Don't confuse with
Unlike glulam beams, CLT is primarily manufactured as large structural panels.

Cross-section survey

Surveying

A survey that measures ground elevations and distances along lines crossing a selected route or alignment.

On site
Conducted at specified intervals along roads and drainage projects to support earthwork calculations and formation design.
Don't confuse with
Unlike a longitudinal profile survey, a cross-section survey records terrain across the route.

Cube test

Lab testing

A test where concrete cubes (usually 150 mm) are cured and crushed to find compressive strength.

On site
Cubes are taken during each pour, labelled, and crushed at 7 and 28 days.
Don't confuse with
Slump test, which checks workability of fresh concrete, not strength.

Culvert

Roads

A pipe or box that carries a stream or drain under a road.

On site
Laid to the correct invert levels with headwalls at each end to protect the embankment.

Culvert apron

Drainage

A protective concrete, stone or other engineered surface provided at a culvert entrance or exit to reduce erosion.

On site
Constructed especially at culvert outlets where concentrated water flow could wash away soil beneath or beyond the structure.
Don't confuse with
Unlike a headwall, a culvert apron primarily protects the ground surface against erosion.

Culvert headwall

Drainage

A structural wall constructed at a culvert entrance or exit to support surrounding fill and protect the pipe or opening.

On site
Constructed at road culverts to retain embankment material and provide a stable, protected inlet or outlet.
Don't confuse with
Unlike a culvert wing wall, a headwall is generally positioned across the culvert opening.

Curing

Concrete

Keeping concrete moist and at a suitable temperature after placing so it gains strength.

On site
Usually by wetting, covering with gunny bags or polythene for at least 7 days.
Don't confuse with
Setting, which is the early stiffening of concrete in the first hours.

Curtailment

Structural

Stopping some reinforcement bars before the end of a member where they are no longer needed.

On site
Follows the rules on the drawing or in the code. Never cut bars short on site without approval.

Curtain wall

Architecture

A non-load-bearing external wall system attached to a building's structural frame, commonly constructed using aluminium framing and glazing.

On site
Used on office towers, hotels and commercial buildings to create lightweight external facades.
Don't confuse with
Unlike a load-bearing wall, a curtain wall does not support the building's floor and roof loads.

Cut and fill

Earthworks

Removing soil from high areas (cut) and placing it in low areas (fill) to reach the design level.

On site
Balancing cut and fill saves the cost of importing or carting away soil.

D

Daily progress report

Site practice

A structured report summarising construction activities, completed quantities, resources, delays and important events for a particular day.

On site
Site engineers prepare daily reports to communicate progress to project managers and support programme monitoring.
Don't confuse with
Unlike a site diary, a daily progress report usually presents a structured summary of work performance.

Damp proof course (DPC)

Masonry

A waterproof layer built into a wall, usually at plinth level, to stop moisture rising from the ground.

On site
Laid on top of the foundation wall before the superstructure walling starts.
Don't confuse with
DPM, which goes under the floor slab.

Damp proof membrane (DPM)

Concrete

A polythene sheet laid under a ground floor slab to stop moisture coming up through the floor.

On site
Laid on blinded hardcore with overlaps, and lapped with the DPC at the walls.
Don't confuse with
DPC, which goes in the wall.

Datum

Surveying

A reference point or level from which all other levels on site are measured.

On site
Usually a fixed peg or benchmark set at the start of the job and protected until the end.

Daylight factor

Architecture

The ratio of indoor illuminance at a specified point to simultaneous outdoor horizontal illuminance under a standard overcast sky, expressed as a percentage.

On site
Used during daylighting assessments to evaluate how effectively windows and openings illuminate internal rooms.
Don't confuse with
Unlike artificial lighting illuminance, daylight factor compares indoor daylight with available outdoor daylight.

Daywork

Contracts

Work paid on the actual time and materials used, instead of measured rates.

On site
Used for small unforeseen work. Signed daywork sheets are needed.

Dead load

Structural

The permanent weight of the structure itself and fixed items: slabs, beams, walls, finishes.

On site
Worked out from material densities. Concrete is about 24 kN/m³.
Don't confuse with
Imposed (live) load, which comes from people, furniture and use.

Deep beam

Structural

A beam with a relatively small span compared with its overall depth, causing loads to transfer mainly through compression struts and tension ties.

On site
Used in transfer structures, pile caps and walls with large openings. Engineers often analyse these members using strut-and-tie models.
Don't confuse with
Unlike an ordinary slender beam, a deep beam has significant non-linear strain distribution through its depth.

Deep soil mixing

Geotechnical

A ground improvement technique that mechanically blends soil with cementitious or other suitable binders to create stronger, stiffer treated ground.

On site
Used beneath foundations, embankments and excavation support systems where weak soils require improved strength or reduced compressibility.
Don't confuse with
Unlike jet grouting, deep soil mixing normally uses mechanical mixing tools rather than high-pressure cutting jets.

Defects liability period

Contracts

A set period after completion during which the contractor must fix defects.

On site
Often 6 to 12 months.

Deflection

Structural

How much a beam or slab bends downward under load.

On site
Limited (often span/250) to avoid cracking finishes and sagging that people can see.

Degree of saturation

Geotechnical

The percentage of soil void space occupied by water.

On site
Used when evaluating compacted fills, unsaturated soils and changes in soil behaviour caused by wetting or drying.
Don't confuse with
Unlike moisture content, degree of saturation compares water volume with the total void volume.

Delamination

Concrete

Separation of a relatively thin surface layer from the underlying concrete, often leaving a hollow-sounding or detached area.

On site
May occur when a slab surface is finished before trapped bleed water or air has escaped from beneath it.
Don't confuse with
Unlike surface scaling, delamination involves separation beneath a surface layer that may initially appear intact.

Delineator post

Roads

A roadside marker, often fitted with reflectors, used to show the road edge and guide drivers along the alignment.

On site
Installed on rural roads, curves and other sections where improved night-time guidance is needed.
Don't confuse with
Unlike a road stud, a delineator post stands beside the roadway rather than on its surface.

Demolition drawing

Drawings

A drawing identifying existing building elements scheduled for removal, alteration or retention during demolition works.

On site
Used during renovations to show which walls, doors, slabs or other elements may be removed after appropriate structural and safety checks.
Don't confuse with
Unlike a proposed construction drawing, a demolition drawing identifies existing elements affected by removal works.

Design speed

Roads

A selected speed used to determine important geometric features of a road, including curve radius and sight distance.

On site
Highway engineers select design speeds based on road function, terrain, applicable standards and expected operating conditions.
Don't confuse with
Unlike a posted speed limit, design speed is a parameter used in geometric road design.

Design storm

Drainage

A rainfall event defined by selected duration, intensity, frequency and sometimes temporal distribution for drainage design.

On site
Used to size stormwater pipes, culverts and detention systems according to the required level of flood protection.
Don't confuse with
Unlike an observed storm, a design storm represents selected rainfall conditions used for engineering calculations.

Design traffic

Roads

The estimated traffic loading a pavement is expected to carry during its specified design period.

On site
Engineers forecast vehicle numbers, heavy vehicle proportions and axle loading to determine suitable pavement layer thicknesses.
Don't confuse with
Unlike a current traffic count, design traffic represents forecast loading over the pavement design period.

Detail callout

Drawings

A drawing annotation identifying an area that is shown separately at a larger scale or with additional information.

On site
Appears around slab edges, wall junctions and structural connections, directing readers to the relevant enlarged detail.
Don't confuse with
Unlike a section marker, a detail callout identifies an enlarged detail without necessarily indicating a cutting plane.

Detail drawing

Drawings

A large-scale drawing showing exactly how a part is built, such as a stair or roof edge.

On site
Called up from plans and sections with a reference bubble.

Detention basin

Drainage

A stormwater storage area that temporarily holds runoff and releases it gradually through a controlled outlet.

On site
Constructed in housing developments, commercial sites and road projects to reduce peak discharge into downstream drainage systems.
Don't confuse with
Unlike a retention pond, a conventional detention basin is generally designed to drain after a storm.

Development length

Structural

Another name for the anchorage length a bar needs to transfer its force into the concrete.

On site
Same idea as anchorage length. Check the drawing notes for the value used.

Development permission

Architecture

Formal planning approval allowing specified development or land use subject to applicable laws, conditions and authority requirements.

On site
Obtained from the relevant county planning authority in Kenya where required before undertaking proposed development.
Don't confuse with
Unlike building permit approval, development permission primarily concerns planning and land-use compliance.

Dewatering

Earthworks

Pumping water out of an excavation to keep it dry.

On site
Done with sump pumps or well points.

Diaphragm action

Structural

The ability of a floor or roof system to transfer horizontal forces to structural elements such as shear walls and braced frames.

On site
During wind or earthquake loading, a properly connected reinforced concrete floor helps distribute lateral forces to the building's resisting elements.
Don't confuse with
A floor diaphragm transfers horizontal forces, while ordinary slab bending primarily resists transverse floor loads.

Diaphragm chord

Structural

A structural member or reinforced region that resists tensile or compressive forces arising from bending within a floor or roof diaphragm.

On site
Engineers detail chord reinforcement along diaphragm edges and around certain openings to support the transfer of lateral forces.
Don't confuse with
Unlike a collector element, a diaphragm chord primarily resists tension and compression associated with diaphragm bending.

Diesel generator set

Plant

A combination of a diesel engine and electrical generator used to produce electricity independently of the main power supply.

On site
Provides temporary power for construction lighting, welding, pumps, offices and equipment where grid electricity is unavailable or unreliable.
Don't confuse with
Unlike an electrical transformer, a generator produces electrical power from mechanical energy.

Differential levelling

Surveying

A surveying method used to determine the difference in elevation between points through a series of level instrument readings.

On site
Used to transfer known elevations across construction sites when establishing foundation levels, road levels and drainage gradients.
Don't confuse with
Unlike simple levelling, differential levelling can use multiple instrument setups to connect distant points.

Differential settlement

Geotechnical

When parts of a building settle by different amounts.

On site
A common cause of diagonal cracks in walls.

Digital terrain model (DTM)

Surveying

A digital representation of the bare-earth ground surface, excluding features such as buildings and vegetation.

On site
Created from survey points or processed drone data to prepare contours, road profiles and earthwork volume calculations.
Don't confuse with
Unlike a digital surface model, a DTM represents bare ground rather than the tops of buildings and vegetation.

Direct shear test

Lab testing

A test that determines soil shear resistance by forcing one part of a soil specimen to slide relative to another along a predetermined plane.

On site
Used to estimate shear strength parameters for suitable soils and interfaces, including friction angle and cohesion intercept.
Don't confuse with
Unlike triaxial testing, direct shear testing forces failure along a predetermined shear plane.

Dispute avoidance/adjudication board (DAAB)

Contracts

An independent board established under applicable FIDIC provisions to help avoid disputes and adjudicate disputes referred to it.

On site
May assist parties during project execution and issue decisions under the dispute procedures specified in their contract.
Don't confuse with
Unlike an arbitral tribunal, a DAAB operates under the contract's dispute avoidance and adjudication procedures.

Disruption claim

Contracts

A contractual claim seeking relief for reduced productivity or inefficient working caused by an event for which compensation may be available.

On site
May arise when repeated access restrictions, design changes or interrupted work sequences reduce construction productivity.
Don't confuse with
Unlike a delay claim, a disruption claim focuses on productivity losses rather than necessarily extending project completion.

Distribution bars

Structural

Secondary bars laid at right angles to the main bars in a slab, to spread load and control cracking.

On site
In a one-way slab they sit on top of the main bars.
Don't confuse with
Main bars, which carry the bending.

Distribution manifold

Plumbing

A plumbing assembly that distributes water from one main supply into several separate branch pipes.

On site
Installed in buildings where individual water supply lines serve bathrooms, kitchens or other fixtures from a central location.
Don't confuse with
Unlike a simple tee fitting, a manifold provides multiple organised branch connections.

Diversity factor

Electrical

The ratio of the sum of individual maximum demands to the maximum combined demand of an electrical system.

On site
Used when evaluating electrical installations where connected equipment does not necessarily operate at maximum demand simultaneously.
Don't confuse with
Unlike demand factor, diversity factor compares individual maximum demands with their combined maximum demand.

Domestic subcontractor

Contracts

A subcontractor selected and engaged by the main contractor to perform part of the contracted works.

On site
Often engaged for painting, tiling, plumbing, roofing or other specialised activities under the main contractor's responsibility.
Don't confuse with
Unlike a nominated subcontractor, a domestic subcontractor is generally chosen by the main contractor.

Door closer

Finishes

A mechanical or controlled device that automatically returns an opened door to its closed position.

On site
Installed on office doors, entrance doors and specified fire doors to support controlled closing and safe operation.
Don't confuse with
Unlike a door hinge, a door closer actively controls the door's return movement.

Door kick plate

Finishes

A protective plate installed near the bottom of a door to reduce damage from shoes, equipment or repeated contact.

On site
Fixed to doors in hospitals, offices, schools and service areas where frequent traffic may damage the door surface.
Don't confuse with
Unlike a door threshold, a kick plate protects the face of the door rather than the floor opening.

Door schedule

Drawings

A table listing doors in a building with their identifying marks, dimensions, types, materials and specified hardware.

On site
Contractors use door schedules to order door sets, verify opening sizes and install the correct doors in designated rooms.
Don't confuse with
Unlike a window schedule, a door schedule provides specifications for doors and their associated fittings.

Dormer window

Architecture

A window projecting vertically from a sloping roof, usually enclosed by its own small roof structure.

On site
Used in attic rooms and loft conversions to provide daylight, ventilation and additional usable headroom.
Don't confuse with
Unlike a rooflight, a dormer projects outward from the roof and includes its own surrounding structure.

Double-skin facade

Architecture

A building facade consisting of two separate external layers with an intermediate cavity that may be ventilated.

On site
Used in selected energy-efficient buildings to help manage solar heat, ventilation and external noise.
Don't confuse with
Unlike conventional single-layer glazing, a double-skin facade has two separated facade layers.

Doubly reinforced beam

Structural

A reinforced concrete beam containing longitudinal reinforcement in both tension and compression zones, with both contributing to bending resistance.

On site
Used where beam depth is restricted or additional moment resistance is required. Proper detailing also helps support ductile behaviour.
Don't confuse with
Unlike a singly reinforced beam, a doubly reinforced beam includes compression steel in its flexural design.

Dovetail joint

Steel and timber

An interlocking timber joint using tapered projections and matching recesses to resist separation between connected pieces.

On site
Common in drawers, cabinets and quality timber joinery where strong corner connections and neat workmanship are needed.
Don't confuse with
Unlike a straight finger joint, a dovetail joint uses tapered interlocking shapes.

Dowel bar

Roads

A plain steel bar across a joint in a concrete pavement that transfers load while allowing movement.

On site
Half is greased or sleeved so the slab can expand and contract.

Downpipe

Roofing

A vertical pipe that carries rainwater from the gutter to the ground or a drain.

On site
Often connected to a water tank for harvesting.

Drainage outfall

Drainage

The point where water from a drainage system is discharged into a receiving watercourse, channel or other approved destination.

On site
Shown on drainage drawings where stormwater pipes or channels discharge into rivers, streams or approved downstream systems.
Don't confuse with
Unlike a drainage inlet, an outfall is where water leaves the drainage system.

Drained shear strength

Geotechnical

The shear resistance of soil under conditions where pore water pressure changes can dissipate during loading.

On site
Used in long-term foundation, retaining wall and slope stability assessments, with strength commonly expressed using effective stress parameters.
Don't confuse with
Unlike undrained shear strength, drained strength reflects loading conditions that permit drainage.

Drawer runner

Finishes

A sliding hardware mechanism that supports a drawer and allows it to move smoothly into and out of a cabinet.

On site
Installed during kitchen, wardrobe and office furniture joinery, with suitable runners selected for drawer size and load.
Don't confuse with
Unlike a cabinet hinge, a drawer runner allows linear sliding rather than rotational opening.

Drawing index

Drawings

A structured list identifying drawings within a project document set, commonly including drawing numbers, titles and revisions.

On site
Used to confirm that contractors and consultants have the required architectural, structural and services drawings.
Don't confuse with
Unlike a title block, a drawing index identifies multiple drawings rather than providing information about one sheet.

Drawing origin

Drawings

The reference point from which coordinates and positions are measured within a CAD drawing or digital model.

On site
Used when aligning architectural, structural and services drawings so their elements appear in the correct relative positions.
Don't confuse with
Unlike a survey control point, a drawing origin may be an arbitrary digital reference location.

Drawing scale

Drawings

The ratio between the size on the drawing and the real size, such as 1:100.

On site
At 1:100, 10 mm on paper is 1 m on site. Always use written dimensions instead of scaling with a ruler.

Drop manhole

Drainage

A manhole with a special arrangement that allows incoming wastewater to descend safely from a higher pipe level to a lower channel.

On site
Used in sewer networks where connecting pipes have significantly different invert levels and controlled flow transfer is required.
Don't confuse with
Unlike an ordinary manhole, a drop manhole accommodates a substantial difference between incoming and outgoing pipe levels.

Drop panel

Structural

A locally thickened portion of a reinforced concrete slab around a supporting column.

On site
Used in certain flat slab designs to increase bending resistance and improve punching shear capacity near columns.
Don't confuse with
A drop panel thickens the slab, while a column capital enlarges the top of the column.

Dry stone masonry

Masonry

Stone masonry constructed by carefully arranging and interlocking stones without using mortar between them.

On site
Used in traditional boundary walls, landscaping and certain engineered stone retaining structures where suitable stone placement provides stability.
Don't confuse with
Unlike mortared stonework, dry stone masonry relies on stone contact and interlocking rather than mortar bonding.

Drying shrinkage

Concrete

Reduction in hardened concrete volume caused mainly by moisture loss to the surrounding environment.

On site
Can produce cracking in restrained slabs and walls, making suitable curing, reinforcement and movement-joint detailing important.
Don't confuse with
Unlike plastic shrinkage, drying shrinkage generally develops after concrete has hardened.

Ductility

Structural

The ability of a material or structural member to undergo significant deformation without sudden loss of load-carrying resistance.

On site
Important in reinforcement detailing, steel design and earthquake-resistant construction because ductile behaviour provides warning and allows energy dissipation.
Don't confuse with
Strength describes resistance to force, while ductility describes deformation capacity before failure.

Dynamic compaction

Geotechnical

A ground improvement technique that densifies suitable soil by repeatedly dropping a heavy weight from a substantial height.

On site
Used on suitable granular fills and reclaimed ground before construction to reduce voids and improve ground stiffness.
Don't confuse with
Unlike vibrocompaction, dynamic compaction applies impact energy from a falling weight at the ground surface.

Dynamic cone penetrometer (DCP) test

Lab testing

A field test that measures ground penetration per hammer blow using a standard cone driven into soil or pavement layers.

On site
Frequently used on road projects to assess subgrade and granular layer uniformity and estimate relative strength using suitable correlations.
Don't confuse with
Unlike the standard penetration test, DCP is commonly used for relatively shallow pavement and subgrade investigations.

E

Earth electrode resistance test

Electrical

A test that measures the resistance between an installed earth electrode system and the surrounding ground.

On site
Carried out using suitable earthing test equipment to assess the installed electrode system against design requirements.
Don't confuse with
Unlike earth fault loop impedance testing, this test focuses on the electrode's resistance to earth.

Earth fault loop impedance

Electrical

The total impedance of the path taken by fault current during an earth fault in an electrical installation.

On site
Measured or calculated to verify that protective devices can disconnect the supply within the required time.
Don't confuse with
Unlike earth electrode resistance, earth fault loop impedance includes the complete relevant fault-current path.

Earth pressure coefficient

Geotechnical

A dimensionless ratio relating horizontal soil stress to vertical stress under specified ground and loading conditions.

On site
Engineers use active, passive and at-rest coefficients when calculating lateral pressures on retaining walls and underground structures.
Don't confuse with
Unlike earth pressure itself, the coefficient is a dimensionless ratio rather than a stress value.

Earth rod

Electrical

A copper or copper-coated rod driven into the ground as part of the earthing system.

On site
Its resistance is measured with an earth tester.

Earthing

Electrical

Connecting metal parts of an installation to the ground so fault current flows safely away.

On site
Uses an earth rod and earth conductor. Tested before the installation is energised.

Earthworks balance

Earthworks

The comparison of usable excavated material with the quantity of material required for filling on a project.

On site
Engineers calculate earthworks balance to determine whether additional fill must be imported or surplus material removed.
Don't confuse with
Unlike a mass haul diagram, earthworks balance describes the quantity relationship rather than its cumulative graphical representation.

Easement

Architecture

A legally recognised right allowing specified use of another person's land for a particular purpose.

On site
May provide access or permit utility services across neighbouring land, subject to the registered rights and applicable law.
Don't confuse with
Unlike land ownership, an easement grants limited rights over land belonging to another owner.

Eccentric loading

Structural

Loading applied away from the centre of resistance of a structural section, producing both direct force and bending.

On site
Occurs when a column receives an off-centre load or when a foundation supports a column positioned away from its centre.
Don't confuse with
Unlike concentric loading, eccentric loading introduces an additional bending moment.

Edge banding

Finishes

A narrow finishing strip applied along the exposed edges of manufactured wood boards to protect and conceal their cores.

On site
Used on kitchen cabinets, wardrobes, shelves and office furniture made from plywood, MDF or particleboard.
Don't confuse with
Unlike surface laminate, edge banding specifically covers the narrow edges of boards.

Edge break

Roads

Deterioration or breaking away of pavement material along the edge of a road.

On site
Often occurs where shoulder support is inadequate, vehicles repeatedly travel near the edge or water weakens underlying materials.
Don't confuse with
Unlike general surface cracking, edge break is concentrated along the pavement boundary.

Effective depth

Structural

The distance from the top (compression face) of a beam or slab to the centre of the tension steel.

On site
Used in design calculations. It is less than the overall depth by the cover plus half the bar size.

Effective length

Structural

An equivalent length used when assessing the buckling resistance of a compression member, considering its restraint and support conditions.

On site
Engineers determine effective lengths when checking slender steel columns and other compression members against instability.
Don't confuse with
Unlike actual member length, effective length reflects the member's buckling restraint conditions.

Effective stress

Geotechnical

The portion of total stress carried through the soil skeleton rather than by pore water pressure.

On site
Engineers use effective stress to assess soil strength, settlement and foundation behaviour, particularly where groundwater is present.
Don't confuse with
Unlike total stress, effective stress excludes the pressure carried by pore water.

Efflorescence

Concrete

A whitish deposit of soluble salts left on a concrete or masonry surface after moisture transports dissolved substances and evaporates.

On site
Common on damp concrete walls, blocks and paving where water movement brings salts to the exposed surface.
Don't confuse with
Unlike surface dusting, efflorescence is a salt deposit rather than loose concrete material.

Elastomeric bearing

Bridges

A bridge bearing made from rubber-like elastomer, sometimes reinforced with steel plates, that accommodates movement through controlled deformation.

On site
Common beneath bridge girders, where it transfers compression loads while accommodating specified rotations and horizontal movements.
Don't confuse with
Unlike a pot bearing, an elastomeric bearing accommodates movement mainly through deformation of its rubber material.

Electrical continuity test

Electrical

A test that checks whether an intended electrical path is complete and has sufficiently low resistance.

On site
Used to verify protective conductors, bonding connections and specified circuit wiring before an installation is energised.
Don't confuse with
Unlike insulation resistance testing, continuity testing verifies intended electrical connections.

Electrical load schedule

Electrical

A document listing electrical loads, their ratings and associated circuit or distribution information.

On site
Prepared during building electrical design to calculate demand, select equipment and organise power distribution.
Don't confuse with
Unlike a lighting layout, a load schedule records electrical loading information rather than fixture positions.

Electrofusion joint

Plumbing

A pipe connection formed by electrically heating embedded resistance wires in a compatible plastic fitting to fuse the fitting and pipe together.

On site
Used for joining polyethylene water supply pipes with approved electrofusion equipment and fittings.
Don't confuse with
Unlike solvent welding, electrofusion joins compatible pipes through controlled heating rather than chemical solvent action.

Elevation

Drawings

A drawing showing one face of a building as seen straight on, such as the front elevation.

On site
Used for heights, window positions and finishes.
Don't confuse with
Section, which shows the building cut through.

Elevation marker

Drawings

A drawing symbol identifying the direction and reference of an elevation view.

On site
Used on architectural plans to show which internal or external wall face is illustrated on another drawing.
Don't confuse with
Unlike a section marker, an elevation marker identifies a viewing direction without requiring a cut through the building.

Ellipsoidal height

Surveying

The height of a point above a specified mathematical reference ellipsoid, measured along the ellipsoid normal.

On site
Obtained through GNSS surveying and converted where necessary into heights suitable for engineering level control.
Don't confuse with
Unlike orthometric height, ellipsoidal height is referenced to a mathematical ellipsoid rather than the geoid.

Elongation index test

Lab testing

A test that determines the percentage by mass of aggregate particles whose greatest dimension exceeds a specified proportion of their nominal size.

On site
Used in aggregate quality control for road works and concrete production. Excessively elongated particles may affect handling, compaction and performance.
Don't confuse with
Unlike flakiness index, elongation index measures particles that are excessively long.

Embankment

Roads

A raised bank of compacted fill built to carry a road or railway above the natural ground.

On site
Built in compacted layers with side slopes protected against erosion.

Emergency assembly point

Health and safety

A designated safe location where people gather after evacuating a workplace during an emergency.

On site
Clearly marked outside hazardous site areas so supervisors can account for workers and visitors during evacuations.
Don't confuse with
Unlike an emergency exit, an assembly point is the designated gathering location after evacuation.

Emergency evacuation drill

Health and safety

A planned exercise used to practise how workers respond to an emergency and leave a workplace safely.

On site
Conducted on construction sites to test alarms, evacuation routes, communication procedures and worker accountability.
Don't confuse with
Unlike an actual emergency evacuation, a drill is a controlled practice exercise.

Emergency lighting

Electrical

Lighting designed to operate when the normal electrical supply to essential lighting fails.

On site
Installed along escape routes, staircases and designated safety areas, using suitable batteries or alternative emergency power supplies.
Don't confuse with
Unlike ordinary lighting, emergency lighting must remain available under specified normal-power failure conditions.

Emulsion paint

Finishes

A water-based paint containing dispersed polymer binders and pigments, commonly used for decorating building surfaces.

On site
Frequently applied to plastered walls and ceilings in Kenyan residential, commercial and institutional buildings.
Don't confuse with
Unlike traditional solvent-based enamel paint, emulsion paint generally uses water as its main carrier.

Enamel paint

Finishes

A paint formulated to produce a relatively hard, durable finish, commonly with a smooth gloss or semi-gloss appearance.

On site
Applied to suitable metal doors, timber frames, railings and other surfaces requiring a washable, durable coating.
Don't confuse with
Unlike ordinary wall emulsion, enamel paint is commonly selected for its harder and more durable surface finish.

End grain

Steel and timber

The exposed surface of timber formed when wood fibres are cut approximately across their length.

On site
Visible at the cut ends of timber boards and beams, where moisture absorption and connection detailing require attention.
Don't confuse with
Unlike face grain, end grain exposes the ends of wood fibres.

End plate connection

Steel and timber

A steel connection formed by attaching a plate to the end of a member and bolting it to another structural element.

On site
Common in steel beam-to-column and beam-to-beam connections, with plate thickness, bolts and welds specified by the designer.
Don't confuse with
Unlike a fin plate connection, an end plate is attached to the end of the supported member.

Energy-absorbing lanyard

Health and safety

A connecting component containing a mechanism designed to reduce forces transmitted to a worker during fall arrest.

On site
Connected between a suitable harness and anchorage, with fall clearance and equipment compatibility checked before use.
Don't confuse with
Unlike a positioning lanyard, an energy-absorbing lanyard is designed to reduce arrest forces during a fall.

Engineered wood flooring

Finishes

A layered flooring product with a real timber surface bonded to a dimensionally stable supporting core.

On site
Used in residential and commercial interiors where a natural timber appearance is desired with improved dimensional stability.
Don't confuse with
Unlike laminate flooring, engineered wood flooring has a genuine timber surface layer.

English bond

Masonry

A brickwork bonding pattern consisting of alternating courses of headers and stretchers.

On site
Used in traditional brick wall construction where good interlocking between masonry units is required.
Don't confuse with
Unlike Flemish bond, English bond places headers and stretchers in separate alternating courses.

Epoxy floor coating

Finishes

A protective floor finish made from an epoxy resin system that cures to form a hard, bonded surface.

On site
Applied to prepared concrete floors in warehouses, garages, laboratories and industrial spaces requiring specified abrasion or chemical resistance.
Don't confuse with
Unlike ordinary floor paint, epoxy coatings form a chemically cured resin-based finish.

Epoxy resin

Materials

A reactive polymer system that cures into a hard, adhesive and chemically resistant material when mixed with its specified curing agent.

On site
Used in approved concrete crack injection, protective floor coatings, structural adhesives and chemical anchoring systems.
Don't confuse with
Unlike ordinary cementitious grout, epoxy resin hardens through polymer curing rather than cement hydration.

Equipotential bonding

Electrical

The connection of conductive parts to reduce dangerous voltage differences between them during electrical faults.

On site
Used to connect specified metallic service installations and structural metalwork to the building's protective bonding system.
Don't confuse with
Earthing connects parts to the earthing system, while bonding reduces potential differences between conductive parts.

Equivalent standard axle (ESA)

Roads

A standardised measure that expresses the pavement damaging effect of different axle loads as equivalent repetitions of a reference axle.

On site
Used in flexible pavement design to convert mixed heavy vehicle traffic into cumulative equivalent standard axle loading.
Don't confuse with
Unlike actual axle load, ESA expresses the equivalent pavement damage contribution of an axle passage.

Erection drawing

Drawings

A drawing showing how prefabricated structural components are positioned and connected during site assembly.

On site
Used by steel erection teams to identify member locations, connection positions and the intended assembled arrangement.
Don't confuse with
Unlike a fabrication drawing, an erection drawing focuses on assembling components at their final site positions.

Erosion control blanket

Earthworks

A protective mat made from natural or synthetic fibres placed over exposed soil to reduce erosion.

On site
Installed on newly formed embankments and slopes, often alongside grass seeding to protect soil while vegetation establishes.
Don't confuse with
Unlike geotextile used for filtration or separation, an erosion control blanket primarily protects exposed soil surfaces.

Euro-profile cylinder

Finishes

A removable key-operated locking cylinder with a standardised European profile, designed for use with compatible locks.

On site
Installed in compatible door locking systems, allowing the key cylinder to be replaced without changing the entire lock body.
Don't confuse with
Unlike the mortise lock body, the cylinder contains the key-operated mechanism.

Excavator

Plant

A tracked or wheeled machine with a boom and bucket for digging.

On site
Used for trenches, foundations and loading lorries.

Exclusion zone

Health and safety

A designated area where access is restricted to protect people from a particular construction hazard.

On site
Established around crane operations, demolition activities, excavations and moving equipment using barriers, signs or controlled access.
Don't confuse with
Unlike a general working area, an exclusion zone restricts entry because of identified hazards.

Expanded clay aggregate

Materials

Lightweight ceramic aggregate produced by heating suitable clay until it expands and forms porous particles.

On site
Used in lightweight concrete, drainage applications and certain roof or landscaping systems.
Don't confuse with
Unlike ordinary gravel, expanded clay aggregate is manufactured by heating and expanding clay.

Expanding polyurethane foam

Finishes

A foam product that expands after application and cures to fill suitable gaps, cavities and joints.

On site
Applied around compatible door frames, window frames and service penetrations where gap filling or insulation is required.
Don't confuse with
Unlike ordinary joint sealant, expanding foam increases substantially in volume after application.

Expansion joint

Concrete

A full gap through a structure that allows it to expand and contract with temperature without cracking.

On site
Filled with a compressible filler and sealed. Common in long slabs and roads.
Don't confuse with
Construction joint, which is just where one pour stopped.

Expansion vessel

Plumbing

A pressure-rated container, commonly containing a flexible diaphragm, that accommodates water volume changes caused by heating.

On site
Installed in closed hot water systems to absorb thermal expansion and help prevent excessive pressure increases.
Don't confuse with
Unlike a pressure tank used for pump cycling, an expansion vessel primarily accommodates thermal expansion.

Expansive soil

Geotechnical

Clay that swells when wet and shrinks when dry.

On site
Black cotton soil is the classic Kenyan example.

Exploded view

Drawings

A drawing showing the separate components of an assembly spaced apart while maintaining their intended relationship.

On site
Used in equipment manuals, connection details and prefabricated assemblies to explain how individual components fit together.
Don't confuse with
Unlike an assembled view, an exploded view separates components to make their arrangement easier to understand.

Exposed aggregate finish

Concrete

A decorative or functional concrete surface finish created by removing a thin layer of surface paste to reveal the aggregates beneath.

On site
Common on pedestrian walkways, driveways and landscaped areas where a textured, slip-resistant appearance is desired.
Don't confuse with
Unlike a smooth floated finish, exposed aggregate reveals the stones within the concrete surface.

Extension of time

Contracts

Extra time granted to the contractor for delays they are not responsible for.

On site
Must be claimed with records and notices.

External reference (Xref)

Drawings

An externally stored drawing or file linked into another CAD drawing without permanently copying all its contents into the host file.

On site
Used to coordinate architectural backgrounds with structural, electrical and plumbing drawings while allowing updates to linked files.
Don't confuse with
Unlike an ordinary inserted CAD block, an Xref maintains a link to an external source file.

F

Fabrication drawing

Drawings

A technical drawing containing the dimensions, materials, connections and manufacturing instructions needed to produce a component.

On site
Used in steel fabrication workshops to cut, drill, weld and assemble structural members before delivery to site.
Don't confuse with
Unlike an erection drawing, a fabrication drawing focuses on manufacturing individual components.

Factor of safety

Structural

A margin built into design so structures are stronger than the loads they are expected to carry.

On site
In limit state design, partial safety factors are applied to loads and materials.

Fair-faced

Finishes

A wall or concrete surface left exposed without plaster, so it must be neat.

On site
Needs careful workmanship and clean, consistent joints.

Fall arrest system

Health and safety

A personal fall protection system designed to stop a worker safely after a fall begins.

On site
Used during approved work-at-height activities where collective fall prevention is insufficient and suitable anchorage and rescue arrangements exist.
Don't confuse with
Unlike fall restraint, fall arrest allows a fall to begin before stopping it.

Fall protection anchor point

Health and safety

A designated structural attachment point designed and verified to support specified personal fall protection equipment.

On site
Provided on roofs, steel structures and other elevated workplaces where workers must connect compatible fall protection systems.
Don't confuse with
Unlike an ordinary fixing point, a fall protection anchor must meet applicable anchorage performance requirements.

Fall restraint system

Health and safety

A personal fall protection arrangement that prevents a worker from reaching a location where a fall could occur.

On site
Used on suitable roofs and elevated work platforms where a correctly adjusted restraint system keeps workers away from exposed edges.
Don't confuse with
Unlike fall arrest, fall restraint prevents access to the fall hazard.

Falling head permeability test

Lab testing

A laboratory test that determines soil hydraulic conductivity by measuring how quickly water level falls through a connected standpipe.

On site
Used for relatively low-permeability soils when assessing seepage, drainage and groundwater movement.
Don't confuse with
Unlike constant head permeability testing, falling head testing uses a water head that decreases during measurement.

Falls

Drainage

The slope given to a surface or pipe so water drains away, written as a ratio or a percentage.

On site
Floors in showers and flat roofs need falls towards the outlet.

Falsework

Bridges

A temporary supporting structure that carries loads from permanent structural works until those works can safely support themselves.

On site
Installed beneath cast-in-place bridge decks and girders during construction, then removed after specified strength and stability requirements are achieved.
Don't confuse with
Unlike formwork, which shapes fresh concrete, falsework primarily supports construction loads.

Fascia board

Roofing

The board fixed along the ends of the rafters at the eaves.

On site
Gutters are fixed to it, and it gives the roof edge a neat finish.

Fatigue failure

Structural

Failure caused by repeated stress cycles that gradually initiate and grow cracks, potentially below the material's static strength.

On site
Important in bridges, crane-supporting structures and members subjected to repeated traffic, vibration or machinery loading.
Don't confuse with
Unlike failure from a single excessive load, fatigue failure develops through repeated loading cycles.

Fenestration

Architecture

The arrangement of windows and doors on a building.

On site
Affects lighting, ventilation and appearance.

Fibre cement board

Materials

A building board manufactured from cement, reinforcing fibres and other ingredients to produce a durable sheet material.

On site
Used for suitable ceilings, partitions, cladding and wet-area backing boards, depending on product certification and installation requirements.
Don't confuse with
Unlike gypsum board, fibre cement board uses a cement-based binder.

Fibre-reinforced concrete (FRC)

Concrete

Concrete containing distributed fibres, such as steel, glass or synthetic fibres, to improve selected properties including crack control and toughness.

On site
Used in industrial floors, pavements, sprayed concrete and some precast products where improved crack resistance is needed.
Don't confuse with
Unlike conventional bar reinforcement, fibres are distributed throughout the concrete mixture.

Field density test

Lab testing

A test on site that measures how dense a compacted layer is.

On site
Methods include sand replacement and nuclear gauge. Results are compared with the Proctor value.

Field vane shear test

Lab testing

An in-situ test that measures the undrained shear strength of suitable soft cohesive soils by rotating a vane inserted into the ground.

On site
Used when investigating soft clay deposits for embankments, foundations and stability assessments.
Don't confuse with
Unlike direct shear testing, field vane testing measures resistance by rotating blades within the soil.

Fillet weld

Steel and timber

A weld with an approximately triangular cross-section used to join surfaces meeting at an angle.

On site
Common in steel brackets, stiffener plates, truss connections and beam-to-plate fabrication.
Don't confuse with
Unlike a butt weld, a fillet weld commonly joins overlapping or perpendicular surfaces.

Fin plate connection

Steel and timber

A steel connection using a projecting plate welded to a supporting member and bolted to the web of another member.

On site
Commonly used for simple shear connections between steel beams and supporting columns or beams.
Don't confuse with
Unlike an end plate connection, the connecting plate typically projects from the supporting member.

Final account

Contracts

The financial statement establishing the final valuation of construction works after accounting for applicable adjustments and contractual entitlements.

On site
Prepared following completion using measured works, approved changes, claims and previous payments, according to the contract procedures.
Don't confuse with
Unlike the original contract sum, the final account reflects the final assessed project value.

Final payment certificate

Contracts

A contractual certificate stating the final amount payable after the required final account and payment procedures.

On site
Issued when the contract's final certification requirements have been satisfied, accounting for previous payments and applicable adjustments.
Don't confuse with
Unlike an interim payment certificate, it addresses the final certified payment position.

Fineness modulus

Lab testing

A number that describes how coarse or fine a sand is, from a sieve analysis.

On site
Used to check that sand is suitable for concrete or plaster.

Finger joint

Steel and timber

A timber joint formed by machining matching finger-shaped projections into two pieces and bonding them together.

On site
Used to manufacture longer timber sections, joinery components and engineered timber products from shorter pieces.
Don't confuse with
Unlike a scarf joint, a finger joint uses multiple narrow interlocking projections.

Finishes schedule

Drawings

A table specifying the materials and surface finishes required for different rooms or building elements.

On site
Used to identify floor tiles, wall paint, ceiling finishes and other materials required in each room.
Don't confuse with
Unlike a room layout drawing, a finishes schedule primarily records surface material specifications.

Fire blanket

Health and safety

A specially manufactured fire-resistant sheet used to smother suitable small fires by restricting their oxygen supply.

On site
Provided in selected workshops, kitchens and other areas where appropriate small-fire response equipment is required.
Don't confuse with
Unlike a fire extinguisher, a fire blanket suppresses suitable flames by covering the burning material.

Fire brick

Materials

A refractory masonry unit manufactured to withstand high temperatures without unacceptable deterioration.

On site
Used in kilns, furnaces, fireplaces and other installations exposed to sustained high temperatures.
Don't confuse with
Unlike ordinary clay bricks, fire bricks are specifically manufactured for high-temperature exposure.

Fire compartment

Architecture

A part of a building separated from other areas by fire-resisting construction intended to restrict the spread of fire and smoke.

On site
Created using appropriately rated walls, floors, doors and sealed service penetrations according to the approved fire safety design.
Don't confuse with
Unlike an ordinary room division, a fire compartment uses construction with specified fire-resistance performance.

Fire extinguisher

Health and safety

A portable firefighting device containing an extinguishing agent suitable for particular classes of fire.

On site
Positioned near site offices, electrical installations, fuel storage and designated work areas, with the correct type selected for anticipated hazards.
Don't confuse with
Unlike a fire blanket, an extinguisher discharges an agent to control a suitable fire.

Fire watch

Health and safety

A designated person assigned to monitor an activity or area for fire hazards and respond according to established procedures.

On site
Provided during specified welding or cutting operations and for the required monitoring period after work finishes.
Don't confuse with
Unlike the welder performing the activity, the fire watch focuses on detecting and responding to ignition hazards.

First aid kit

Health and safety

A container holding basic medical supplies for providing immediate assistance to injured or unwell persons.

On site
Kept in accessible site locations, with contents maintained and trained first aid personnel available according to workplace requirements.
Don't confuse with
Unlike a complete medical treatment facility, a first aid kit provides supplies for initial assistance.

Fixed support

Structural

A support that stops movement and rotation.

On site
A beam cast fully into a stiff wall or column behaves close to fixed.
Don't confuse with
Pinned support, which allows rotation.

Fixed-ended beam

Structural

A beam restrained against rotation at both ends, allowing bending moments to develop at its supports.

On site
In a reinforced concrete frame, beams cast monolithically with columns may behave approximately as fixed-ended beams, depending on the stiffness of their connections.
Don't confuse with
Unlike a simply supported beam, a fixed-ended beam resists rotation at its supports.

Flakiness index test

Lab testing

A test that determines the percentage by mass of aggregate particles whose smallest dimension is below a specified proportion of their nominal size.

On site
Used when checking crushed stone for concrete and road construction. Excessively flaky particles can affect compaction, workability and aggregate performance.
Don't confuse with
Flakiness concerns particle thickness, while elongation concerns particle length.

Flashing

Roofing

A strip of metal or membrane that seals the joint between a roof and a wall or chimney.

On site
Stops water getting in at junctions.

Flat slab

Structural

A slab supported directly on columns without beams.

On site
Needs checks for punching shear around columns.

Flemish bond

Masonry

A brickwork bonding pattern where headers and stretchers alternate within the same course.

On site
Used in exposed brick walls where both wall bonding and a decorative brick pattern are desired.
Don't confuse with
Unlike English bond, Flemish bond alternates headers and stretchers within individual courses.

Flexible pavement

Roads

A road pavement system that distributes traffic loads through several layers, with the surface commonly made from bituminous materials.

On site
Common on Kenyan highways and urban roads, where asphalt surfacing is supported by engineered base, sub-base and subgrade layers.
Don't confuse with
Unlike rigid pavement, flexible pavement does not rely primarily on a stiff concrete slab for load distribution.

Flexural failure

Structural

Structural failure caused when bending demand exceeds the flexural resistance of a member.

On site
Can occur in beams and slabs under excessive loading, with behaviour depending on reinforcement arrangement and material properties.
Don't confuse with
Flexural failure results from bending, while shear failure results from inadequate shear resistance.

Float switch

Plumbing

A water-level sensing device that uses a floating mechanism to activate or deactivate an electrical circuit.

On site
Installed in underground and rooftop water tanks to control pumps automatically or provide high-level and low-level alarms.
Don't confuse with
Unlike a float-operated ball valve, a float switch controls an electrical circuit rather than directly opening or closing a water valve.

Floor drain

Plumbing

A drainage fitting installed at floor level to collect wastewater or washdown water and direct it into a drainage pipe.

On site
Common in bathrooms, kitchens, laundry areas and commercial washrooms where floor surfaces require drainage.
Don't confuse with
Unlike a washbasin waste outlet, a floor drain collects water directly from the surrounding floor surface.

Floor-to-floor height

Architecture

The vertical distance from one floor level to the next.

On site
Used in stair design and building height calculations.
Don't confuse with
Floor-to-ceiling height, the clear room height.

Flow control chamber

Drainage

A drainage chamber containing a device or arrangement that limits the rate at which water leaves a drainage system.

On site
Installed downstream of stormwater storage systems to restrict discharge into public drains or nearby watercourses.
Don't confuse with
Unlike an ordinary inspection chamber, a flow control chamber includes a feature that regulates discharge.

Flush bolt

Finishes

A sliding bolt fitted into the edge or face of a door leaf to secure it against the frame or floor.

On site
Used on double-leaf doors to hold the normally inactive leaf closed while the main leaf operates.
Don't confuse with
Unlike a mortise lock, a flush bolt usually secures a door leaf without a keyed locking mechanism.

Flush mortar joint

Masonry

A masonry joint finished level with the surrounding face of the bricks, blocks or stones.

On site
Used where a relatively flat masonry surface is required, including some exposed walls and surfaces prepared for further finishing.
Don't confuse with
Unlike a recessed joint, a flush joint does not sit behind the masonry face.

Flush valve

Plumbing

A valve that releases a controlled volume or flow of water to flush a toilet or urinal.

On site
Installed in suitable toilet and urinal systems, including direct-flush arrangements where supply pressure and flow are adequate.
Don't confuse with
Unlike a cistern, a flush valve controls water release rather than serving as a storage container.

Fly ash

Materials

Fine mineral particles collected from combustion gases, commonly from coal-fired power generation, with suitable grades used as supplementary cementitious material.

On site
May partially replace Portland cement in approved concrete mixes to improve workability and selected long-term performance properties.
Don't confuse with
Unlike ordinary cement, fly ash generally relies on pozzolanic reactions for much of its cementitious contribution.

Fly levelling

Surveying

A rapid levelling procedure used mainly to transfer an elevation between established points without taking detailed intermediate ground levels.

On site
Used to extend vertical control from a known benchmark to another part of a construction site.
Don't confuse with
Unlike profile levelling, fly levelling primarily transfers elevation rather than recording detailed ground profiles.

Foamed concrete

Concrete

A lightweight cement-based material containing numerous small air bubbles introduced using a prepared foam.

On site
Used for filling underground voids, levelling uneven surfaces, trench reinstatement and lightweight roof filling.
Don't confuse with
Unlike conventional lightweight aggregate concrete, foamed concrete obtains much of its low density from introduced air bubbles.

Folded plate structure

Structural

A structural system formed from connected flat plates arranged at angles to create a stiff folded shape.

On site
Used in some long-span roofs and architectural structures where the folded geometry improves stiffness and load distribution.
Don't confuse with
Unlike a flat plate, a folded plate gains additional stiffness from its angled geometry.

Foot valve

Plumbing

A non-return valve installed near the inlet of a pump suction pipe, often incorporating a strainer.

On site
Used in suitable suction-lift pumping systems to retain water in the suction line and help maintain pump priming.
Don't confuse with
Unlike an ordinary check valve, a foot valve is specifically installed at the suction pipe inlet.

Footing

Structural

The widened base of a column or wall that spreads load onto the soil.

On site
Pad footings under columns, strip footings under walls. Sizes come from the foundation drawing.
Site name
Msingi
Don't confuse with
Foundation is the general word. A footing is one type.

Foresight

Surveying

The last staff reading taken from a level setup before moving the instrument.

On site
Used with the backsight to work out the reduced level of the next point.

Forklift

Plant

A powered industrial vehicle with front lifting forks designed to raise, lower and transport palletised or appropriately secured loads.

On site
Used in construction warehouses, steel yards and material storage areas to move pallets, cement bags and packaged building products.
Don't confuse with
Unlike a telehandler, a conventional forklift mainly lifts loads using a vertical mast.

Formation level

Earthworks

The final level of the ground after excavation or filling, ready for the first layer of construction.

On site
Checked with a level before blinding or sub-base.

Formwork

Concrete

The temporary mould that holds wet concrete in shape until it can support itself.

On site
Made of timber or steel. It must be strong, tight and clean, and is struck after the right time.
Site name
Shuttering
Don't confuse with
Falsework (props and supports) holds the formwork up.

Foul drain

Drainage

A drain that carries sewage and waste water from toilets, kitchens and bathrooms.

On site
Leads to a sewer or septic tank, never to a storm drain.

Foundation

Structural

The part of a structure that transfers all loads safely into the ground.

On site
Types include strip, pad, raft and pile. The choice depends on soil and loads.
Site name
Msingi

Foyer

Architecture

An entrance hall or reception space where people arrive before entering the main areas of a building.

On site
Found in hotels, theatres, offices and institutional buildings, often providing seating, circulation space and access to other rooms.
Don't confuse with
Unlike a vestibule, a foyer usually provides a larger reception or gathering area.

Free swell index test

Lab testing

A laboratory test that estimates the swelling tendency of soil when exposed to water under specified conditions without external confinement.

On site
Useful when assessing potentially expansive clay soils before foundation or pavement construction.
Don't confuse with
Unlike consolidation testing, free swell testing examines expansion rather than compression under applied loading.

French drain

Drainage

A trench filled with gravel, often with a perforated pipe, that collects and carries away ground water.

On site
Used behind retaining walls and around foundations on wet sites.

Full-body safety harness

Health and safety

A wearable assembly of straps designed to distribute fall arrest forces across suitable parts of the body.

On site
Worn with compatible connectors and approved anchorage during work-at-height operations requiring personal fall protection.
Don't confuse with
Unlike an ordinary safety belt, a full-body harness supports the body at multiple locations during fall arrest.

Fundi

Site practice

A skilled craftsman on site, such as a mason, carpenter, steel fixer or plumber.

On site
Knowing how to communicate clearly with fundis is one of the most valuable site skills you can have.
Site name
Fundi

G

Gable

Roofing

The triangular top part of an end wall under a pitched roof.

On site
A gable roof has two slopes meeting at the ridge, with gables at the ends.
Don't confuse with
Hip roof, which slopes on all four sides.

Galvanising

Materials

Coating steel with zinc to protect it from rust.

On site
Used on roofing sheets, pipes and fixings.

Gambrel roof

Roofing

A roof with two slopes on each of its two main sides, usually with a steeper lower slope.

On site
Used in some residential and agricultural buildings to provide more usable space beneath the roof.
Don't confuse with
Unlike a mansard roof, a gambrel roof usually has two main sloping sides and gable ends.

Gate valve

Plumbing

A valve that opens or closes flow fully with a sliding gate.

On site
Used to isolate sections of a water supply.

Gauge (sheet thickness)

Roofing

A number for the thickness of metal sheets. A higher gauge number means a thinner sheet.

On site
Gauge 28 is thinner than gauge 26, for example.

Gauge box

Concrete

A bottomless wooden box used to measure equal volumes of sand and aggregate for a mix.

On site
Sized so one box matches one bag of cement. Better than counting wheelbarrows.

General arrangement drawing (GA)

Drawings

A drawing showing the overall layout, positions and relationships of major building or structural elements.

On site
Engineers use GA drawings to understand column positions, beam layouts, floor arrangements and how different structural elements connect.
Don't confuse with
Unlike a detail drawing, a GA drawing focuses on the overall arrangement rather than individual connection details.

Geocell

Earthworks

A three-dimensional cellular confinement system, commonly manufactured from polymer strips, that holds soil or aggregate within connected cells.

On site
Installed beneath access roads, on slopes or over weak ground to improve confinement, distribute loads and reduce erosion.
Don't confuse with
Unlike flat geogrid reinforcement, a geocell forms three-dimensional compartments that confine fill material.

Geographic information system (GIS)

Surveying

A computer-based system for collecting, managing, analysing and displaying data linked to geographic locations.

On site
Used in road asset mapping, utility network management, land-use planning and infrastructure project analysis.
Don't confuse with
Unlike computer-aided drafting alone, GIS connects mapped features with location-based data and analysis.

Geogrid

Materials

A polymer reinforcement material with an open grid structure designed to interact mechanically with soil or aggregate.

On site
Installed within road bases, reinforced soil slopes and retaining wall backfill to improve load distribution or soil reinforcement.
Don't confuse with
Unlike geotextile, geogrid mainly provides reinforcement through its open-grid interaction with surrounding material.

Geoid

Surveying

An irregular gravity-based reference surface that closely approximates global mean sea level and extends beneath land areas.

On site
Used with suitable geoid models to convert GNSS-derived heights into elevations referenced approximately to mean sea level.
Don't confuse with
Unlike a reference ellipsoid, the geoid is based on Earth's gravity field.

Geomembrane

Materials

A very low-permeability synthetic sheet used to control the movement of liquids or gases through an engineered barrier.

On site
Installed in lined ponds, landfill containment systems and selected reservoirs where leakage control is required.
Don't confuse with
Unlike geotextile, geomembrane is primarily designed to restrict fluid movement.

Geopolymer concrete

Concrete

Concrete using an alkali-activated aluminosilicate binder, often produced from materials such as fly ash or slag, instead of conventional Portland cement binder.

On site
Considered for specialised precast products and projects exploring alternative binders, subject to verified mix performance and relevant specifications.
Don't confuse with
Unlike ordinary Portland cement concrete, geopolymer concrete uses a different binder chemistry.

Georeferencing

Surveying

The process of assigning real-world geographic coordinates to an image, drawing, map or other spatial dataset.

On site
Used to align scanned survey plans, aerial photographs and engineering layouts with existing GIS or survey coordinate systems.
Don't confuse with
Unlike simple image scaling, georeferencing establishes the image's geographic position and orientation.

Geotextile

Materials

A permeable synthetic textile used in contact with soil or aggregate for functions such as separation, filtration, drainage, protection or reinforcement.

On site
Placed beneath selected road layers, around drainage systems and behind retaining structures according to its specified function.
Don't confuse with
Unlike a geomembrane, a geotextile is generally permeable to water.

Glue-laminated timber (Glulam)

Materials

An engineered timber product manufactured by bonding layers of graded timber together to form larger structural members.

On site
Used in long-span roof beams, arches, columns and exposed architectural timber structures.
Don't confuse with
Unlike LVL, glulam is typically manufactured from thicker timber laminations rather than thin veneers.

GNSS base station

Surveying

A GNSS receiver operating at a known or accurately determined position to generate correction information for other receivers.

On site
Established on a stable survey control point to supply corrections to RTK rover receivers during field measurements.
Don't confuse with
Unlike a GNSS rover, a base station normally remains stationary while supplying correction information.

GNSS rover receiver

Surveying

A mobile satellite positioning receiver used to collect coordinates, often with correction data from a base station or correction network.

On site
Carried on a survey pole to record ground points, establish construction positions and survey road features.
Don't confuse with
Unlike a GNSS base station, the rover moves between points being measured.

Goods received note (GRN)

Site practice

A document prepared by the receiving organisation to confirm the materials and quantities actually received.

On site
Storekeepers prepare GRNs after checking delivered materials against purchase orders and delivery documents.
Don't confuse with
Unlike a supplier's delivery note, a GRN records what the receiving organisation has accepted.

GPS / GNSS survey

Surveying

Surveying with satellite receivers to find positions and levels.

On site
Fast for topographic surveys and setting out on open sites.

Grab rail

Architecture

A securely fixed support bar designed to help users maintain balance, transfer position or move safely.

On site
Installed beside accessible toilets, showers and other locations where additional physical support is required.
Don't confuse with
Unlike a stair handrail, a grab rail commonly supports transfers and movement around sanitary fixtures.

Grade slab (ground floor slab)

Concrete

A concrete slab cast directly on prepared ground.

On site
Built up as: compacted fill, hardcore, blinding, DPM, mesh, then concrete.

Grader

Plant

A machine with a long blade used to level and shape road layers.

On site
Used to form camber and spread material evenly.

Gradient

Roads

The rate of rise or fall along a road or pipe, given as a percentage or ratio.

On site
A 5% gradient rises 5 m for every 100 m of length.

Grading (of aggregate)

Materials

The mix of particle sizes in an aggregate.

On site
Well-graded aggregate packs tightly and needs less cement paste.

Grease trap

Drainage

A chamber that separates fats and oils from kitchen waste water before it enters the drain.

On site
Needed for restaurants and hotels. Must be cleaned regularly.

Green roof (vegetated roof)

Roofing

A roof system incorporating vegetation, growing medium, drainage and waterproofing layers above a supporting roof structure.

On site
Used in selected sustainable buildings to manage stormwater, improve insulation and introduce greenery into built-up areas.
Don't confuse with
Unlike an ordinary roof garden, a green roof may use shallow vegetation specifically designed for extensive roof coverage.

Grid lines

Drawings

Reference lines on drawings, marked with letters one way and numbers the other.

On site
Columns are located by grid, e.g. column at B/3.

Gross floor area (GFA)

Architecture

The total floor area of a building measured to the outside of external walls.

On site
Used for costing and approvals.

Ground anchor

Geotechnical

A structural anchoring element installed into soil or rock to transfer tensile forces into stable ground.

On site
Used to support retaining walls, stabilise slopes and resist uplift forces in suitable foundation systems.
Don't confuse with
Unlike ordinary soil nails, ground anchors may be actively tensioned to provide an initial restraining force.

Ground beam

Structural

A beam at or near ground level that ties columns together and supports walls.

On site
Also called a plinth beam or tie beam.

Ground coverage

Architecture

The percentage of a plot covered by the building footprint.

On site
Limited by zoning rules.

Ground granulated blast-furnace slag (GGBS)

Materials

A finely ground material produced from rapidly cooled molten ironmaking slag, used as a supplementary cementitious material.

On site
Blended with Portland cement in concrete to improve certain durability properties and reduce heat generation, depending on mix design.
Don't confuse with
Unlike natural aggregate, GGBS acts as a reactive cementitious component.

Grout float

Finishes

A handheld finishing tool with a rubber-faced base used to spread grout into joints between tiles.

On site
Used after tile adhesive has sufficiently hardened, moving diagonally across tile joints to pack them with grout.
Don't confuse with
Unlike a notched adhesive trowel, a grout float has a rubber face for working grout into joints.

Grout pump

Plant

A pumping machine designed to move and inject fluid grout through hoses or pipes at controlled flow rates and pressures.

On site
Used for ground grouting, anchor installation, filling voids and specialised concrete repair operations.
Don't confuse with
Unlike a conventional concrete pump, a grout pump is designed for more fluid cementitious or chemical grout mixtures.

Guardrail system

Health and safety

A protective barrier installed along an exposed edge to prevent workers or other people from falling.

On site
Installed around floor openings, scaffold platforms, roof edges and elevated walkways, with suitable top rails and intermediate protection.
Don't confuse with
Unlike personal fall arrest equipment, guardrails provide collective protection without requiring individual harness connections.

Gully trap

Drainage

A fitting with a water seal that collects waste water from sinks and showers outside a building.

On site
The water seal stops smells coming back from the drain.

Gusset plate

Structural

A steel plate used to connect structural members, particularly diagonal braces or truss members, at a common joint.

On site
Common in steel trusses, towers and braced frames, where members are connected to the plate using bolts or welds.
Don't confuse with
Unlike a base plate, a gusset plate primarily joins structural members rather than transferring column loads into a foundation.

Gutter

Roofing

A channel along the eaves that collects rainwater from the roof.

On site
Fixed with a slight fall to the downpipe.

Gypsum board (drywall)

Finishes

Panels of gypsum between paper sheets, fixed to metal or timber frames for ceilings and partitions.

On site
Joints are taped and filled before painting.

H

Half-cell potential test

Lab testing

An electrochemical test that measures the electrical potential of embedded reinforcement relative to a reference electrode.

On site
Used during reinforced concrete condition surveys to assess the likelihood of active steel corrosion across tested areas.
Don't confuse with
Unlike corrosion rate measurement, half-cell potential indicates corrosion probability rather than the actual corrosion rate.

Hardcore

Earthworks

Broken stone or similar hard material, laid and compacted as a base under ground slabs.

On site
Usually 150 to 230 mm thick, compacted and blinded with sand or murram.
Don't confuse with
Ballast, which is smaller graded stone used in concrete.

Hardwood vs softwood

Materials

Botanical groups of timber. Hardwoods come from broad-leaved trees; softwoods from conifers like cypress and pine.

On site
Most roof timber in Kenya is treated softwood such as cypress.

Hatching

Drawings

Patterns of lines on a drawing that show different materials in section.

On site
Concrete, blockwork and earth each have their own hatch.

Haul road

Earthworks

A temporary or permanent route used by construction vehicles to transport excavated material, fill or other heavy loads.

On site
Prepared on large earthworks projects to allow tipper trucks and dumpers to move safely between excavation, filling and disposal areas.
Don't confuse with
Unlike a completed public road, a temporary haul road primarily serves construction operations.

Hazard identification

Health and safety

The process of recognising conditions, activities or materials that could cause injury, illness or other harm.

On site
Supervisors identify hazards such as exposed electrical wires, unprotected openings and unstable excavations before workers begin activities.
Don't confuse with
Hazard identification finds potential sources of harm, while risk assessment evaluates their likelihood and consequences.

Headed reinforcement bar

Structural

A reinforcing bar fitted with an enlarged end head that provides mechanical anchorage within concrete.

On site
Used in congested structural joints, foundations and other locations where conventional bar bends or straight anchorage lengths are difficult to accommodate.
Don't confuse with
Unlike a conventional hooked bar, a headed bar develops anchorage through an enlarged mechanical end.

Headed shear stud connector

Steel and timber

A short steel stud with an enlarged head used to transfer longitudinal shear between connected structural materials.

On site
Welded to steel beams beneath concrete slabs to develop composite action between the steel member and concrete.
Don't confuse with
Unlike ordinary fastening bolts, headed shear studs primarily transfer interface shear in composite construction.

Heat-affected zone (HAZ)

Steel and timber

The region of parent metal beside a weld whose microstructure or properties have changed because of welding heat.

On site
Considered during welding procedure development and inspection because unsuitable heating or cooling can affect steel toughness and strength.
Don't confuse with
Unlike weld metal, the HAZ consists of original material altered by the welding temperature cycle.

Height of instrument (HI)

Surveying

The level of the line of sight of a levelling instrument.

On site
HI = known level + backsight. Each point level = HI minus its staff reading.

Hidden line

Drawings

A dashed or otherwise standardised line used to represent edges or features concealed behind visible surfaces.

On site
Used in engineering drawings to indicate concealed openings, internal edges and elements not directly visible in the selected view.
Don't confuse with
Unlike a continuous visible line, a hidden line represents a feature obscured from view.

Hierarchy of controls

Health and safety

A system for ranking ways to control workplace hazards, from eliminating them to using personal protective equipment.

On site
Site safety teams prioritise elimination, substitution, engineering controls and administrative controls before relying on PPE.
Don't confuse with
Unlike a risk assessment, the hierarchy of controls guides the selection of protective measures.

High-performance concrete (HPC)

Concrete

Concrete specially designed to achieve performance requirements such as high durability, strength or low permeability beyond those of conventional mixes.

On site
Specified for bridges, heavily loaded structural members and structures exposed to aggressive environmental conditions.
Don't confuse with
Unlike high-strength concrete, HPC is not defined by compressive strength alone.

High-pressure laminate (HPL)

Finishes

A decorative sheet manufactured by bonding resin-impregnated paper layers together under high heat and pressure.

On site
Applied to cabinets, countertops, doors and wall panels to provide decorative, wear-resistant surfaces.
Don't confuse with
Unlike laminate flooring, HPL is a sheet material used to finish various substrates.

Hip rafter

Roofing

A diagonal roof framing member running from an external roof corner towards the ridge or another upper support.

On site
Used in hipped roof construction to support shorter rafters and form the sloping external intersection between roof planes.
Don't confuse with
Unlike a valley rafter, a hip rafter supports an outward-projecting roof intersection.

Hip roof

Roofing

A roof that slopes down on all four sides, with no gable walls.

On site
Needs hip rafters and hip capping where the slopes meet.

Hoarding

Site practice

A temporary fence around a construction site.

On site
Keeps the public out and secures materials.

Hogging

Structural

Bending that makes a member curve upward like a hill, putting the top in tension.

On site
Happens over supports and in cantilevers. Needs top steel.
Don't confuse with
Sagging, which puts the bottom in tension.

Hold point

Site practice

A mandatory inspection or approval stage beyond which work cannot proceed until the required release is obtained.

On site
A project ITP may require reinforcement approval at a hold point before concrete placement begins.
Don't confuse with
Unlike a witness point, a hold point prevents further work until the specified release is given.

Holding-down bolts

Structural

Bolts cast into a foundation to anchor a steel column base plate.

On site
Positioned with a template so they match the base plate holes.

Hollow pot slab

Structural

A slab with concrete ribs and hollow blocks (pots) in between to reduce weight.

On site
Common in Kenyan buildings. Ribs carry the steel; pots are left in place.

Honeycombing

Concrete

Voids and exposed aggregate in hardened concrete caused by poor compaction or mortar leaking from formwork.

On site
Prevented by proper vibration and tight formwork. Serious honeycombing must be reported to the engineer.

Hoop iron

Masonry

A thin steel strip laid in mortar joints to tie and strengthen masonry walls.

On site
Laid at intervals in courses and at corners and junctions.

Horizontal alignment

Roads

The planned route of a road as viewed from above, including straight sections, horizontal curves and their connections.

On site
Highway engineers establish horizontal alignment during road design and setting out to control the direction of the carriageway.
Don't confuse with
Horizontal alignment controls the road's direction in plan, while vertical alignment controls its elevation along the route.

Horizontal angle

Surveying

The angle between two directions measured in a horizontal plane from a common observation point.

On site
Measured using a theodolite or total station when establishing building corners, traverses and road alignments.
Don't confuse with
Unlike a vertical angle, a horizontal angle measures direction changes within the horizontal plane.

Horizontal curve

Roads

A curved section of road alignment that changes the direction of travel when viewed from above.

On site
Designed using appropriate radius, visibility and superelevation requirements to allow vehicles to negotiate changes in direction safely.
Don't confuse with
Unlike a vertical curve, a horizontal curve changes the road's direction in plan.

Horizontal distance

Surveying

The distance between two points measured or projected onto a horizontal plane.

On site
Used to establish building dimensions, road offsets and survey coordinates regardless of differences in ground elevation.
Don't confuse with
Unlike slope distance, horizontal distance excludes the vertical component between points.

Hot water circulation pump

Plumbing

A pump that continuously or periodically circulates hot water through a distribution loop to reduce waiting time at fixtures.

On site
Used in hotels, hospitals and larger buildings where hot water outlets are located far from the heater.
Don't confuse with
Unlike a booster pump, a circulation pump primarily maintains movement through a hot water loop.

Hot water return pipe

Plumbing

A pipe that carries circulating hot water back toward the heating or storage equipment in a recirculating system.

On site
Installed in large buildings to maintain warm water near distant fixtures and reduce water wasted while waiting for hot water.
Don't confuse with
Unlike a hot water supply pipe, a return pipe carries circulating water back toward the heating system.

Hot work

Health and safety

Construction or maintenance activity that produces flames, sparks or sufficient heat to create a fire hazard.

On site
Includes welding, flame cutting and certain grinding operations, requiring suitable precautions and authorisation where specified.
Don't confuse with
Unlike ordinary cold work, hot work introduces significant ignition sources.

Hurricane tie

Steel and timber

A metal connector designed to secure roof framing to supporting walls or members against uplift and other specified forces.

On site
Installed at suitable rafter or truss supports where roof framing requires additional resistance to wind uplift.
Don't confuse with
Unlike a joist hanger, a hurricane tie primarily provides uplift restraint rather than end bearing support.

Hydration

Materials

The chemical reaction between cement and water that makes concrete harden.

On site
It needs water to continue, which is why curing matters.

Hydraulic breaker

Plant

A hydraulically powered impact attachment used to break hard rock, concrete and other resistant materials.

On site
Usually mounted on excavators for breaking rocky foundation formations, demolishing concrete and removing hard obstructions.
Don't confuse with
Unlike an excavator bucket, a hydraulic breaker fractures material using repeated impacts.

Hydraulic grade line (HGL)

Drainage

A line representing the elevation of hydraulic head, combining elevation head and pressure head throughout a flowing water system.

On site
Used to assess water levels, pipe pressures and possible flooding or surcharging in stormwater drainage networks.
Don't confuse with
Unlike the energy grade line, the HGL excludes velocity head.

Hydrometer analysis

Lab testing

A sedimentation test used to determine the particle size distribution of fine soil particles suspended in water.

On site
Used for soils containing significant silt and clay fractions. Hydrometer readings help estimate particle sizes that ordinary sieving cannot separate effectively.
Don't confuse with
Unlike sieve analysis, hydrometer analysis estimates fine particle sizes from their settling behaviour in water.

Hydroseeding

Earthworks

A method of establishing vegetation by spraying a mixture of grass seed, water and suitable additives onto prepared ground.

On site
Used to establish grass cover on road embankments and large exposed slopes where manual seeding may be difficult.
Don't confuse with
Unlike conventional hand seeding, hydroseeding distributes seed through a sprayed mixture.

I

Illuminance (lux)

Electrical

The amount of luminous flux falling on a surface per unit area, measured in lux.

On site
Lighting designers calculate and measure illuminance to check whether classrooms, offices and working areas have suitable lighting levels.
Don't confuse with
Unlike lumens, which measure luminous flux, lux measures luminous flux per square metre.

Immersion heater

Plumbing

An electrical heating element installed directly inside a water storage cylinder or tank to heat the surrounding water.

On site
Used in electrically heated hot water cylinders, with thermostatic controls and suitable electrical safety protection.
Don't confuse with
Unlike an external boiler, an immersion heater heats water using an element located inside the storage vessel.

Imposed load (live load)

Structural

Load from the use of a building: people, furniture, stored goods. It can change over time.

On site
Values come from the code depending on use. A house floor is typically about 1.5 kN/m².
Don't confuse with
Dead load, which is permanent.

Incident investigation

Health and safety

A systematic examination of an accident, near miss or dangerous occurrence to identify causes and prevent recurrence.

On site
Safety officers collect statements, photographs and site records after an incident, then recommend corrective and preventive actions.
Don't confuse with
Unlike incident reporting, investigation examines why an event occurred and how similar events can be prevented.

Incremental launching

Bridges

A bridge construction method in which successive deck sections are assembled behind an abutment and progressively pushed across the supports.

On site
Used where construction access beneath the bridge is restricted, with temporary launching equipment controlling movement and support forces.
Don't confuse with
Unlike balanced cantilever construction, incremental launching moves assembled deck sections forward from a launching area.

Industry Foundation Classes (IFC)

Drawings

An open international data standard for exchanging building and infrastructure model information between different software applications.

On site
Used to share BIM models between architectural, structural and building services teams working with different software platforms.
Don't confuse with
Unlike a native Revit project file, IFC is designed for software-independent model information exchange.

Infiltration trench

Drainage

A shallow excavation filled with permeable material that temporarily stores runoff and allows it to infiltrate into surrounding soil.

On site
Installed near paved areas or landscaped developments where soil permeability and groundwater conditions permit infiltration.
Don't confuse with
Unlike a conventional piped drain, an infiltration trench primarily releases water into the surrounding ground.

Influence line

Structural

A diagram showing how a structural response at a specified point changes as a unit load moves across the structure.

On site
Used in bridge design to identify critical positions of moving vehicles that produce maximum shear forces, bending moments or reactions.
Don't confuse with
Unlike a bending moment diagram for fixed loading, an influence line shows the effect of a moving load.

Initial setting time

Materials

The time after mixing when cement paste starts to lose its plasticity.

On site
Concrete should be placed and compacted before this.

Inspection and test plan (ITP)

Site practice

A quality control document identifying required inspections, tests, acceptance criteria and responsible parties for construction activities.

On site
Prepared for reinforcement installation, concrete works, welding or other activities requiring documented quality verification.
Don't confuse with
Unlike a quality checklist, an ITP defines the inspection and testing process across specified work stages.

Inspection chamber

Drainage

An access point in a drainage system for checking and clearing blockages.

On site
Fitted with a cover and benching that guides flow.

Inspection request (IR)

Site practice

A formal request asking an authorised inspector or consultant to examine completed work before the next activity proceeds.

On site
Submitted after reinforcement fixing and formwork installation so the required checks can occur before concreting.
Don't confuse with
Unlike an inspection checklist, an IR requests an inspection rather than recording all inspection findings.

Instantaneous water heater

Plumbing

A water heating appliance that heats water as it flows through the unit without storing a large volume of hot water.

On site
Commonly installed for showers and individual hot water outlets in Kenyan residential buildings.
Don't confuse with
Unlike a storage water heater, it heats water on demand rather than maintaining a stored supply.

Instrument centring

Surveying

The process of positioning a surveying instrument's vertical axis directly above a designated ground point.

On site
Performed when setting up total stations over survey control stations using an optical or laser plummet.
Don't confuse with
Unlike instrument levelling, centring aligns the instrument with a ground point rather than making its vertical axis plumb.

Insulated glazing unit (IGU)

Materials

A sealed glazing assembly containing two or more glass panes separated by a gas-filled or air-filled cavity.

On site
Installed in windows and curtain walls to improve thermal performance and, depending on construction, acoustic performance.
Don't confuse with
Unlike single glazing, an IGU contains multiple separated glass panes within a sealed assembly.

Insulation resistance test

Electrical

An electrical test that measures resistance between conductors or between conductors and earth to assess insulation condition.

On site
Performed using an insulation resistance tester before energising new wiring, following safe isolation and equipment protection procedures.
Don't confuse with
Unlike a continuity test, insulation resistance testing checks resistance between conductors intended to remain electrically separated.

Integral abutment bridge

Bridges

A bridge in which the superstructure is structurally connected to its abutments without conventional expansion bearings at those connections.

On site
Used where designers want to reduce maintenance associated with deck-end bearings and movement joints.
Don't confuse with
Unlike a conventional bearing-supported bridge, an integral abutment bridge transfers movements and forces through its rigid connections.

Interim certificate

Contracts

A document issued during a project certifying the value of work done so the contractor can be paid.

On site
Based on measured work and materials on site.

Interlocking stabilised soil block (ISSB)

Materials

A compressed soil-based masonry block, commonly stabilised with cement, shaped to interlock with adjacent units.

On site
Used in suitable low-rise construction in Kenya and East Africa, with block strength, durability and wall detailing checked before use.
Don't confuse with
Unlike ordinary concrete blocks, ISSBs primarily use compacted soil as their main constituent.

International roughness index (IRI)

Roads

A standardised measure of road surface longitudinal roughness, commonly expressed in metres per kilometre.

On site
Measured using suitable road profiling equipment to assess riding quality and support pavement maintenance planning.
Don't confuse with
Unlike texture depth, IRI measures larger-scale longitudinal unevenness affecting vehicle ride quality.

Invert level

Drainage

The level of the lowest inside surface of a pipe or channel.

On site
Drainage drawings give invert levels so you can set the pipe at the right fall.
Don't confuse with
Cover level, which is the top of the manhole cover.

Inverted beam

Structural

A beam constructed mainly above the level of its supporting slab instead of projecting below it.

On site
Used where a flat ceiling is needed or where architectural requirements limit downward beam projections. Its connection to the slab requires careful detailing.
Don't confuse with
Unlike a conventional downstand beam, an inverted beam projects upward from the slab.

Invitation to tender (ITT)

Contracts

A formal invitation asking qualified contractors or suppliers to submit bids for specified construction works or services.

On site
Issued by a client or procuring entity with tender documents explaining the project requirements, submission procedures and deadlines.
Don't confuse with
Unlike a request for quotation, an ITT normally involves a more detailed formal bidding process.

Isolator switch

Electrical

A switching device used to disconnect electrical equipment or circuits from their power supply for safe maintenance.

On site
Installed near water heaters, air-conditioning units and machinery to provide an accessible means of electrical isolation.
Don't confuse with
Unlike a circuit breaker, an ordinary isolator does not automatically provide fault-current protection.

Isometric drawing

Drawings

A three-dimensional drawing method showing an object along three axes with equal scale and angles of 120 degrees between projected axes.

On site
Common in plumbing and mechanical drawings to illustrate pipe routes, fittings, connections and changes in direction.
Don't confuse with
Unlike a perspective drawing, an isometric drawing does not make distant objects appear smaller.

J

Jack rafter

Roofing

A shortened rafter extending between a wall plate or ridge and a hip or valley framing member.

On site
Used in complex pitched roofs where full-length common rafters cannot extend across the complete roof slope.
Don't confuse with
Unlike a common rafter, a jack rafter terminates at a hip or valley member.

Jamb

Architecture

The vertical side of a door or window opening.

On site
Frames are fixed to jambs with ties or screws.

Jet grouting

Geotechnical

A ground improvement method using high-pressure fluid jets to erode and mix soil with grout, forming treated soil-cement elements.

On site
Used for excavation support, seepage control, underpinning and ground strengthening in suitable soil conditions.
Don't confuse with
Unlike permeation grouting, jet grouting deliberately breaks up and mixes the ground.

Job safety analysis (JSA)

Health and safety

A safety planning method that breaks a job into individual steps, identifies hazards and specifies appropriate controls.

On site
Prepared before activities such as working at height, lifting reinforcement cages or entering excavations.
Don't confuse with
Unlike a general site risk assessment, a JSA examines the steps of a specific task.

Joint shear

Structural

Shear force transferred through a structural connection region, particularly where beams and columns meet.

On site
Engineers check joint shear resistance in reinforced concrete frames to prevent joint damage, especially under earthquake or other lateral loading.
Don't confuse with
Unlike beam shear, joint shear acts through the connection region between structural members.

Joist

Structural

One of a series of parallel beams that support a floor or ceiling.

On site
Common in timber floors and in some precast floor systems.

Joist hanger

Steel and timber

A manufactured metal connector that supports the end of a timber joist and transfers its load to another structural member.

On site
Fixed to supporting beams or ledgers using specified nails or screws when constructing timber floors and decks.
Don't confuse with
Unlike a simple timber bearing connection, a joist hanger provides a dedicated metal support.

Junction box

Electrical

An enclosure where cables are joined.

On site
Must stay accessible for inspection.

K

Kerb

Roads

A concrete or stone edge along the side of a road or footpath.

On site
Set on a concrete bed and haunched behind to stop it moving.

Kerb inlet

Drainage

An opening in a roadside kerb that allows surface runoff to enter a stormwater drainage system.

On site
Constructed along urban roads where rainwater flows beside the kerb and needs to enter an underground drain.
Don't confuse with
Unlike a grated inlet in the road surface, a kerb inlet collects water through an opening in the kerb.

Key plan

Drawings

A small plan on a drawing showing which part of the building the drawing covers.

On site
Helps you find your place on large projects.

Kicker

Concrete

A short upstand of concrete (about 75 mm) cast at the base of a column or wall.

On site
It positions the next formwork accurately and stops grout leaking at the base.

L

L-beam

Structural

A beam with an L-shaped effective cross-section, commonly formed when a floor slab extends from only one side of the supporting beam.

On site
Often occurs along the external edges of reinforced concrete floor slabs where the edge beam supports the slab on one side.
Don't confuse with
A T-beam has effective slab flanges on both sides, while an L-beam has a flange on one side.

Labour allocation sheet

Site practice

A record showing how workers are assigned to particular construction activities, locations or supervisors.

On site
A foreman may allocate masons to walling, carpenters to formwork and steel fixers to reinforcement installation.
Don't confuse with
Unlike an attendance register, a labour allocation sheet identifies what workers are assigned to do.

Labour attendance register

Site practice

A daily record showing which construction workers reported for duty and their attendance details.

On site
Foremen or supervisors record attendance to support payroll preparation, labour monitoring and daily workforce planning.
Don't confuse with
Unlike a labour allocation sheet, an attendance register records presence rather than assigned activities.

Laitance

Concrete

A weak, milky layer of cement and fines on the surface of concrete.

On site
Removed before casting the next layer so the joint bonds well.

Laminate flooring

Finishes

A layered manufactured floor covering with a decorative surface bonded over a wood-based core.

On site
Installed in suitable bedrooms, offices and living spaces, commonly using interlocking planks over an approved underlay.
Don't confuse with
Unlike engineered wood flooring, laminate flooring normally has a printed decorative layer rather than a real timber surface.

Laminated glass

Materials

Glass made by bonding two or more glass sheets together using one or more interlayers that help retain fragments after breakage.

On site
Used in safety glazing, balustrades, skylights and other applications requiring specified post-breakage behaviour.
Don't confuse with
Unlike monolithic toughened glass, laminated glass uses bonded layers to help retain broken fragments.

Laminated veneer lumber (LVL)

Materials

An engineered timber product made by bonding thin wood veneers together, generally with their grain running in the same direction.

On site
Used for engineered beams, lintels, headers and other structural timber members where consistent strength and dimensions are required.
Don't confuse with
Unlike plywood, LVL generally aligns its veneer grain primarily along the member's length.

Land-use zoning

Architecture

The planning system that controls permitted land uses and development characteristics within designated geographical areas.

On site
Consulted when assessing whether a proposed residential, commercial or industrial development is permitted at a particular site.
Don't confuse with
Unlike occupancy classification, zoning regulates land development rather than categorising the internal use of a building.

Landing

Architecture

A flat platform at the top, bottom or between flights of a stair.

On site
At least as wide as the stair.

Lap length

Structural

The length by which two reinforcing bars overlap so force passes from one to the other.

On site
Laps are staggered and kept out of high-stress zones. Typical laps are about 40 to 50 times the bar diameter, but follow the drawing.
Don't confuse with
Anchorage length, which is a bar going into a support.

Lateral-torsional buckling

Structural

An instability where a beam bends sideways and twists under loading, often when its compression flange lacks adequate restraint.

On site
Engineers check long, unrestrained steel beams and provide suitable lateral restraints or select sections with adequate resistance.
Don't confuse with
Unlike column buckling, lateral-torsional buckling involves sideways movement and twisting of a beam under bending.

Laterite

Geotechnical

A reddish, iron-rich soil formed in hot, wet climates.

On site
Good laterite (murram) is used for roads and fill.

Launching gantry

Bridges

A specialised temporary lifting and supporting structure used to position or assemble bridge girders and deck segments.

On site
Used on elevated highways and viaducts to install precast segments or girders without relying entirely on ground-based cranes.
Don't confuse with
Unlike an ordinary mobile crane, a launching gantry operates along or above the bridge alignment.

Laydown area

Site practice

A designated site space used for temporarily placing construction materials, equipment or prefabricated components before installation.

On site
Used to arrange steel sections, reinforcement cages, formwork panels and precast components near their intended working locations.
Don't confuse with
Unlike enclosed site stores, a laydown area commonly accommodates large or bulky construction components.

LED driver

Electrical

An electronic device that provides the controlled electrical output required to operate compatible light-emitting diodes.

On site
Installed within or alongside LED lighting fittings to deliver suitable current or voltage to the light source.
Don't confuse with
Unlike an ordinary switch, an LED driver regulates the electrical supply needed by the LEDs.

Legend

Drawings

A key on a drawing explaining the symbols, line types and hatching used.

On site
Read the legend first, especially on MEP drawings.

Letter of acceptance

Contracts

A formal communication informing a successful bidder that its tender has been accepted under the applicable contract and procurement requirements.

On site
Issued following the required award procedures, with its contractual effect depending on the tender conditions and governing law.
Don't confuse with
Unlike a letter of intent, a letter of acceptance communicates acceptance of the tender offer.

Letter of intent (LOI)

Contracts

A document expressing an intention to enter into a contract or proceed with specified arrangements, subject to its wording.

On site
May be issued before a formal construction contract is executed, sometimes authorising limited preliminary activities.
Don't confuse with
Unlike a letter of acceptance, an LOI does not necessarily establish acceptance of the full contract.

Level of development (LOD)

Drawings

A BIM classification describing how reliably the geometry and associated information of a model element can be used at a project stage.

On site
Project teams define LOD requirements to coordinate model content for design, documentation, fabrication and construction.
Don't confuse with
Unlike graphical detail alone, LOD concerns the reliability and permitted use of model information.

Levelling

Surveying

Finding the difference in height between points using a level and staff.

On site
Used to set foundation levels, floor levels and road gradients.

Lift thickness

Earthworks

The thickness of an individual layer of fill placed for compaction during earthworks construction.

On site
Site supervisors check loose and compacted layer thicknesses to ensure compaction equipment can achieve the specified density.
Don't confuse with
Unlike total fill depth, lift thickness refers to one individual layer.

Lifting gear inspection

Health and safety

An examination of lifting accessories to identify defects, deterioration or conditions that could make them unsafe.

On site
Slings, shackles, hooks and lifting chains are checked before use and examined periodically by competent persons as required.
Don't confuse with
Unlike a load test, lifting gear inspection checks equipment condition without necessarily applying a test load.

Lifting plan

Site practice

A documented arrangement describing how a lifting operation will be performed safely using suitable equipment, personnel and procedures.

On site
Prepared before lifting heavy reinforcement cages, steel beams or precast components, considering loads, rigging and equipment capacity.
Don't confuse with
Unlike a general method statement, a lifting plan addresses the specific requirements of a lifting operation.

Lightning arrestor

Electrical

A rod system on top of a building that leads lightning safely to earth.

On site
Connected by a down conductor to its own earth electrode.

Lightweight aggregate

Materials

Aggregate with a lower particle density than conventional natural stone aggregate, often containing a porous internal structure.

On site
Used in lightweight concrete blocks, structural lightweight concrete and insulating concrete products.
Don't confuse with
Unlike conventional crushed stone, lightweight aggregate reduces the density of the resulting mixture.

Lightweight concrete

Concrete

Concrete manufactured with a lower density than conventional concrete, using lightweight aggregates, controlled air voids or other suitable methods.

On site
Used in lightweight floor systems, roof insulation, precast units and applications where reducing permanent structural weight is beneficial.
Don't confuse with
Unlike normal-weight concrete, lightweight concrete has a reduced density and requires design appropriate to its properties.

Lightwell

Architecture

A vertical opening or shaft within a building that allows natural light to reach internal rooms or lower floors.

On site
Provided in closely spaced buildings where internal rooms cannot receive sufficient daylight through external walls.
Don't confuse with
Unlike a ventilation shaft, a lightwell is primarily intended to admit natural light.

Limestone filler

Materials

Finely ground limestone added to cementitious mixtures to modify particle packing, workability and other properties.

On site
Used in certain blended cements, mortars and concrete mixes according to the material specification.
Don't confuse with
Unlike coarse limestone aggregate, limestone filler consists of very fine particles.

Limit state design

Structural

A design method that checks a structure will not fail (ultimate limit state) and will perform well in use (serviceability limit state).

On site
The basis of BS 8110 and the Eurocodes.

Lineweight

Drawings

The specified thickness of a line used to create visual hierarchy and distinguish drawing elements.

On site
Drafters assign different lineweights to section cuts, visible outlines, dimensions and reference lines to improve drawing readability.
Don't confuse with
Unlike line type, lineweight describes thickness rather than whether a line is continuous, dashed or patterned.

Lintel

Structural

A short beam over a door or window opening that carries the wall above.

On site
Can be cast in place or precast. It needs a bearing of at least 150 mm on each side.
Don't confuse with
Ring beam, which runs continuously around the building.

Liquidated damages

Contracts

A pre-agreed amount the contractor pays for each day or week of delay.

On site
Written into the contract.

Load combination

Structural

A specified combination of different structural actions considered together when checking safety or serviceability.

On site
Engineers combine permanent, imposed and wind actions using the relevant Eurocode design rules to determine critical design effects.
Don't confuse with
A load case represents a particular loading arrangement, while a load combination considers specified actions together.

Load factor

Structural

A multiplier applied to a characteristic or representative load when determining its design value.

On site
In structural calculations, engineers apply the specified factors to loads according to the design standard and limit state being checked.
Don't confuse with
A load factor modifies an applied load, while a material factor modifies the resistance used in design.

Load path

Structural

The route loads take through a structure from where they are applied down to the ground.

On site
Slab to beam to column to foundation to soil. A broken load path causes failure.

Load-bearing wall

Structural

A wall that carries loads from floors or the roof above.

On site
Never remove or cut openings in one without an engineer.
Don't confuse with
Partition wall, which carries only its own weight.

Local buckling

Structural

Instability of an individual plate element within a structural cross-section, such as a flange or web, under compression.

On site
Engineers check width-to-thickness limits in steel members to control local instability before the intended section resistance develops.
Don't confuse with
Unlike overall buckling, local buckling affects individual parts of a cross-section.

Local grid

Surveying

A coordinate reference system established for a particular project or limited geographical area.

On site
Used on building and infrastructure sites where surveyors assign convenient coordinates for setting out and construction control.
Don't confuse with
Unlike a national coordinate system, a local grid may use an arbitrary project origin and orientation.

Lockout/tagout (LOTO)

Health and safety

A safety procedure that isolates hazardous energy sources and secures them against unexpected activation during maintenance.

On site
Applied before repairing electrical equipment, pumps or machinery, with isolation verified and locks and identification tags controlled.
Don't confuse with
Unlike simply switching equipment off, LOTO secures and verifies hazardous energy isolation.

Longitudinal profile survey

Surveying

A survey that records ground elevations along a selected alignment to produce a lengthwise profile of the terrain.

On site
Used along proposed roads, pipelines and drainage routes to determine ground slopes and support vertical design.
Don't confuse with
Unlike a cross-section survey, a longitudinal profile follows the main route alignment.

Look-ahead schedule

Site practice

A short-term construction schedule showing upcoming activities, required resources and constraints over a defined planning period.

On site
Supervisors prepare two-week or four-week plans to organise materials, labour, equipment and workfront availability.
Don't confuse with
Unlike the overall programme of works, a look-ahead schedule focuses on detailed near-term execution.

Los Angeles abrasion test

Lab testing

A laboratory test that measures an aggregate's resistance to fragmentation and abrasion inside a rotating steel drum containing steel balls.

On site
Common in road material testing. The Los Angeles abrasion value is reported as a percentage mass loss, with lower values generally indicating better resistance.
Don't confuse with
Unlike the aggregate impact value test, this test involves repeated abrasion and impact inside a rotating drum.

Louvre

Architecture

An arrangement of angled slats or blades that allows ventilation while providing some protection against rain, sunlight or direct visibility.

On site
Installed in ventilation openings, plant rooms, bathrooms and building facades to allow controlled airflow.
Don't confuse with
Unlike a fully glazed window, a louvre permits airflow through spaces between its blades.

Low-emissivity glass (Low-E glass)

Materials

Glass with a special surface coating designed to reduce radiant heat transfer while allowing useful visible light transmission.

On site
Specified for energy-efficient windows and curtain walls where controlling solar gain or heat loss is important.
Don't confuse with
Unlike ordinary clear glass, Low-E glass has a coating that modifies its thermal radiation properties.

Low-heat cement

Materials

Cement formulated to release less heat during hydration, helping control temperature rise in large concrete sections.

On site
Used in massive foundations, thick retaining structures and large concrete pours where excessive internal temperatures could cause cracking.
Don't confuse with
Unlike ordinary cement, low-heat cement is formulated to reduce hydration heat generation.

Luminaire

Electrical

A complete lighting unit containing a light source and the components needed to support, protect and distribute its light.

On site
Specified on electrical lighting layouts for classrooms, offices, homes, workshops and external areas.
Don't confuse with
Unlike a lamp alone, a luminaire includes the complete lighting fitting and associated components.

Lump sum contract

Contracts

A construction contract where the contractor agrees to complete defined works for an agreed overall price, subject to contract adjustments.

On site
Used where the design and scope are sufficiently defined for the contractor to price the complete works.
Don't confuse with
Unlike a remeasurement contract, payment is not primarily determined by remeasuring every actual work quantity.

Luxury vinyl tile (LVT)

Finishes

A manufactured vinyl flooring product supplied as individual tiles or planks, often printed to resemble timber or stone.

On site
Installed in houses, offices and retail spaces over suitably prepared floors using approved adhesive or locking systems.
Don't confuse with
Unlike ceramic tiles, LVT is a resilient synthetic flooring material rather than fired clay.

M

Mabati

Roofing

Corrugated or profiled galvanised iron roofing sheets.

On site
Ordered by gauge, profile and length. Effective cover width depends on the profile.
Site name
Mabati

Machine-cut stone

Materials

Natural stone blocks cut to regular size by machine, common for walling in Kenya.

On site
Measure a sample on site. Sizes vary by quarry.

Manhole

Drainage

A chamber large enough for a person to enter for maintenance of sewers or drains.

On site
Built at junctions, changes of direction and at intervals along long runs.

Mansard roof

Roofing

A roof with two slopes on each main side, where the lower slope is considerably steeper than the upper slope.

On site
Used where the design aims to create additional usable space within the roof while maintaining a distinctive architectural appearance.
Don't confuse with
Unlike a gambrel roof, a mansard roof typically has double slopes on all four sides.

Manual changeover switch

Electrical

A manually operated switch used to select between alternative electrical power sources while preventing unintended simultaneous connection.

On site
Used to switch selected building circuits between the utility supply and a standby generator.
Don't confuse with
Unlike an automatic transfer switch, a manual changeover switch requires an operator to select the supply.

Manufactured sand (M-sand)

Materials

Fine aggregate produced by mechanically crushing and processing suitable rock to achieve specified particle sizes and properties.

On site
Used in concrete, mortar and paving products as an alternative to natural sand when grading and quality requirements are satisfied.
Don't confuse with
Unlike naturally deposited river sand, manufactured sand is produced through mechanical crushing.

Map projection

Surveying

A mathematical method for representing positions on the curved Earth on a flat map or coordinate plane.

On site
Used when preparing engineering survey maps and GIS datasets, with the selected projection affecting distances, directions and scale.
Don't confuse with
Unlike a geodetic datum, a map projection defines how curved geographic coordinates are represented on a plane.

Marshall stability test

Lab testing

A laboratory test measuring the maximum load resisted by a prepared asphalt specimen under specified loading conditions, together with its deformation.

On site
Used in Marshall asphalt mix design and quality control. Results include stability and flow values for evaluating mixture performance.
Don't confuse with
Stability measures maximum supported load, while Marshall flow measures deformation at that load.

Masonry cement

Materials

A manufactured cementitious binder formulated for masonry mortar, providing suitable workability, water retention and bonding properties.

On site
Used for laying bricks and blocks where the mortar specification permits masonry cement.
Don't confuse with
Unlike ordinary structural concrete cement, masonry cement is primarily formulated for mortar applications.

Masonry compressive strength

Masonry

The resistance of assembled masonry to compressive loading, influenced by the masonry units, mortar, workmanship and construction arrangement.

On site
Engineers use specified masonry strength values when designing load-bearing block and brick walls under applicable structural standards.
Don't confuse with
Unlike individual block strength, masonry compressive strength represents the behaviour of assembled masonry.

Masonry pier

Masonry

A relatively short, thick masonry element that provides localised support or increases the stability of a wall.

On site
Constructed at selected wall positions, gate entrances and other locations where masonry requires additional support.
Don't confuse with
Unlike a continuous masonry wall, a masonry pier forms a concentrated supporting element.

Masonry pilaster

Masonry

A vertical thickening or projection built as part of a masonry wall to provide additional stiffness or support.

On site
Used along suitable long masonry walls or at concentrated loading points according to the structural design.
Don't confuse with
Unlike a freestanding pier, a pilaster is integrated with and projects from a wall.

Masonry starter tie

Masonry

A metal connector fixed to an existing wall or structural element to help secure newly constructed masonry.

On site
Installed when connecting new blockwork or brickwork to existing walls or reinforced concrete columns, according to approved details.
Don't confuse with
Unlike traditional toothing, starter ties provide a mechanical connection without requiring projecting masonry units.

Masonry veneer

Masonry

A non-load-bearing outer layer of brick or stone masonry attached to a supporting wall or structural frame.

On site
Used on selected building facades to provide a masonry appearance without relying on the outer layer to support floor loads.
Don't confuse with
Unlike load-bearing masonry, masonry veneer primarily serves as an external facing rather than supporting the main structure.

Mass concrete

Concrete

Unreinforced concrete placed in bulk, such as for blinding or gravity walls.

On site
Large pours generate heat and may need temperature control.

Mass haul diagram

Earthworks

A graph showing the cumulative balance of excavation and filling quantities along a road or linear construction project.

On site
Used by highway engineers to plan material movement, identify surplus or deficient sections and reduce unnecessary transport costs.
Don't confuse with
Unlike a longitudinal ground profile, a mass haul diagram represents cumulative earthwork quantities.

Mass vs reinforced concrete

Concrete

Mass concrete has no steel; reinforced concrete has steel bars to carry tension.

On site
Beams, slabs and columns are reinforced; blinding is mass concrete.

Match line

Drawings

A reference line indicating where a drawing continues on another sheet or adjoining drawing area.

On site
Common in road plans, drainage layouts and large building floor plans that cannot fit onto one drawing sheet.
Don't confuse with
Unlike a break line, a match line connects information between separate drawing views or sheets.

Material approval request

Site practice

A formal submission seeking approval of a proposed construction material or product before procurement or installation.

On site
Submitted with specifications, product datasheets, test certificates and samples where required for tiles, pipes, waterproofing or reinforcement.
Don't confuse with
Unlike a purchase order, material approval confirms technical suitability rather than placing an order.

Material delivery note

Site practice

A document accompanying delivered materials that identifies the supplier, items and quantities being transported.

On site
Checked when cement, reinforcement, blocks or aggregates arrive on site before the delivery is accepted.
Don't confuse with
Unlike a goods received note, a delivery note is normally issued by the supplier or transporter.

Material issue voucher

Site practice

A document recording materials released from storage for use by a worker, team or construction activity.

On site
Storekeepers record quantities of cement, nails or reinforcement issued to specific work teams for stock accountability.
Don't confuse with
Unlike a material requisition, an issue voucher records materials actually released.

Material requisition

Site practice

An internal request for construction materials needed to carry out a particular activity.

On site
A foreman requests cement, reinforcement or binding wire from the stores before the materials are issued.
Don't confuse with
Unlike a purchase requisition, a material requisition may request items already available in site stores.

Maximum dry density (MDD)

Lab testing

The highest dry density a soil can reach under a standard compaction test.

On site
Specifications often ask for 95% or more of MDD on site.

Maximum reinforcement ratio

Structural

The upper permitted amount of reinforcement relative to a concrete section, determined by applicable design and detailing requirements.

On site
Engineers check reinforcement limits to maintain suitable structural behaviour and avoid excessive steel congestion that makes concrete placement difficult.
Don't confuse with
Minimum reinforcement ratio establishes a lower limit, while maximum reinforcement ratio establishes an upper limit.

MCB (miniature circuit breaker)

Electrical

An automatic switch that cuts a circuit when current is too high.

On site
Replaces the old fuse. Rated in amps (6 A for lighting, 16 or 20 A for sockets, for example).
Don't confuse with
RCD, which trips on earth leakage, not overload.

Means of escape

Architecture

The designated system of routes and exits allowing building occupants to reach a place of safety during an emergency.

On site
Architects design escape routes, exit widths, staircases and travel distances according to building occupancy and applicable fire safety requirements.
Don't confuse with
Unlike normal circulation, means of escape must satisfy specific emergency evacuation requirements.

Mechanical rebar coupler

Structural

A manufactured connector that joins reinforcing bars mechanically, transferring forces between them without requiring a conventional overlapping splice.

On site
Used in columns, heavily reinforced joints and construction stages where long overlapping bars would cause congestion.
Don't confuse with
Unlike an overlapping reinforcement splice, a mechanical coupler connects bars using a purpose-made device.

Mechanically stabilised earth (MSE)

Geotechnical

An engineered soil structure reinforced with tensile elements such as geogrids or steel strips to improve stability.

On site
Used in highway retaining walls, bridge approaches and reinforced embankments, often with precast concrete facing panels.
Don't confuse with
Unlike a conventional gravity retaining wall, MSE uses reinforcement within compacted soil to resist lateral forces.

Median (central reserve)

Roads

The area or physical feature separating opposing directions of traffic on a divided road.

On site
May contain concrete barriers, kerbs, vegetation or other approved features on dual carriageways and major highways.
Don't confuse with
Unlike a road shoulder, a median separates opposing traffic streams.

Method statement

Site practice

A document explaining step by step how a task will be carried out safely.

On site
Prepared for risky operations such as lifting or deep excavation.

Mezzanine

Architecture

An intermediate floor partly open to the floor below.

On site
Common in shops and warehouses.

Micro-Deval test

Lab testing

A laboratory test measuring aggregate resistance to wear through rotation with steel balls, usually in the presence of water.

On site
Used for assessing aggregate durability in road construction. Results are commonly reported as percentage material loss.
Don't confuse with
Unlike the Los Angeles abrasion test, the Micro-Deval test commonly assesses wear under wet conditions.

Microsurfacing

Roads

A cold-applied pavement maintenance mixture using polymer-modified asphalt emulsion, graded aggregate, mineral filler, water and suitable additives.

On site
Used to improve surface condition, restore texture and correct certain shallow ruts on structurally sound roads.
Don't confuse with
Unlike conventional slurry seal, microsurfacing commonly uses a polymer-modified binder and controlled chemical setting.

Minimum reinforcement ratio

Structural

The minimum required area of reinforcement compared with a specified concrete section area, according to the relevant design rules.

On site
Engineers check minimum reinforcement in beams and slabs to control cracking and help prevent sudden failure after concrete cracks.
Don't confuse with
Unlike maximum reinforcement ratio, minimum reinforcement ratio sets a lower reinforcement requirement.

Mitre drain

Roads

A drain that leads water away from the side drain of a road into the surrounding land.

On site
Placed at intervals so side drains do not carry too much water and erode.

Mix design

Concrete

Working out the proportions of cement, water, sand and aggregate to reach the required strength and workability.

On site
Done in a lab using the actual site materials.
Don't confuse with
Nominal mix, a fixed ratio like 1:2:4 used without lab design.

Mixer tap

Plumbing

A plumbing fitting that combines hot and cold water supplies into one outlet, allowing the user to adjust temperature and flow.

On site
Commonly installed on kitchen sinks, washbasins and baths connected to both hot and cold water pipes.
Don't confuse with
Unlike a single-supply tap, a mixer tap combines two water supplies.

Mjengo

Site practice

Kenyan slang for construction work or a building site.

On site
"Niko mjengo" means "I am at the construction site."
Site name
Mjengo

Mobilisation

Site practice

Setting up the site at the start of a project: hoarding, offices, stores, water, power.

On site
Usually a separate item in the BOQ.

Mock-up panel

Site practice

A representative section of proposed construction prepared to demonstrate workmanship, appearance or installation details before full execution.

On site
Contractors construct sample plastered walls, tiled surfaces or facade sections for inspection and approval.
Don't confuse with
Unlike a loose material sample, a mock-up panel demonstrates an installed construction finish or assembly.

Model space

Drawings

The CAD workspace where drawing geometry is generally created at full size using real-world drawing units.

On site
Drafters prepare building plans, structural layouts and engineering geometry in model space before arranging printed sheets.
Don't confuse with
Unlike paper space, model space is primarily intended for creating and editing design geometry.

Modulus of elasticity

Structural

The ratio of stress to strain for a material in its elastic range. It measures stiffness.

On site
Steel is about 200 GPa; concrete is around 25 to 35 GPa.

Moisture conditioning

Earthworks

Adjustment of soil moisture content by adding water, drying or mixing to achieve suitable conditions for compaction.

On site
Workers use water bowsers, graders and suitable mixing equipment to prepare fill before rolling and field density testing.
Don't confuse with
Unlike compaction, moisture conditioning prepares the soil for effective densification.

Moisture content

Lab testing

The weight of water in a sample divided by its dry weight, as a percentage.

On site
Found by weighing, oven drying and weighing again.

Moment of inertia (second moment of area)

Structural

A property of a cross-section that shows how well it resists bending.

On site
Deeper beams have much higher values, which is why depth controls stiffness.

Moment redistribution

Structural

The adjustment of bending moments from an elastic analysis to alternative values that remain in equilibrium, subject to design requirements.

On site
In continuous reinforced concrete beams, permitted redistribution can reduce peak support moments and increase moments elsewhere, provided ductility requirements are satisfied.
Don't confuse with
Unlike elastic moment distribution, moment redistribution allows specified changes based on available rotational capacity.

Moment-resisting frame

Structural

A structural frame that resists horizontal loads mainly through bending resistance in its beams, columns and their connections.

On site
Used in multi-storey buildings where properly detailed rigid connections help resist wind or earthquake forces while maintaining open floor spaces.
Don't confuse with
Unlike a braced frame, a moment-resisting frame primarily relies on joint rigidity and member bending resistance.

Mono-pitch roof

Roofing

A roof consisting of a single sloping surface that drains rainwater towards one side of the building.

On site
Common on verandas, extensions, carports and some modern houses in Kenya. Roof members are arranged to provide the specified slope.
Don't confuse with
Unlike a gable roof, a mono-pitch roof has only one main sloping plane.

Mortar

Materials

A mix of cement, sand and water used to bind blocks or bricks, or for plastering.

On site
A common walling mix is 1:4 to 1:6. Use it within about an hour of mixing.
Don't confuse with
Concrete, which also contains coarse aggregate.

Mortise lock

Finishes

A locking mechanism installed inside a pocket cut into the edge of a door.

On site
Common on timber entrance and internal doors, with the lock body fitted inside the door and connected to suitable handles.
Don't confuse with
Unlike a surface-mounted rim lock, a mortise lock is recessed into the door.

Mortise-and-tenon joint

Steel and timber

A timber connection formed by inserting a projecting tenon on one member into a matching recess called a mortise.

On site
Used in traditional timber framing, doors, furniture and selected structural joinery where accurately fitted connections are required.
Don't confuse with
Unlike a butt joint, a mortise-and-tenon joint uses interlocking timber shapes.

Motor scraper

Plant

A self-propelled earthmoving machine that cuts, collects, transports and spreads soil using a large bowl and cutting blade.

On site
Used in large road projects, airfields and extensive earthworks where suitable soil must be moved over moderate distances.
Don't confuse with
Unlike a bulldozer, a motor scraper carries excavated material in its own bowl.

Moulded case circuit breaker (MCCB)

Electrical

A circuit breaker enclosed in an insulating moulded case, designed to interrupt overloads and short circuits in higher-rated electrical installations.

On site
Used in commercial building switchboards, main distribution panels and larger equipment circuits.
Don't confuse with
Unlike a typical MCB, an MCCB commonly handles higher currents and may offer adjustable protection settings.

Movement joint profile

Finishes

A manufactured finishing profile designed to accommodate specified movement between adjacent surface finishes or building components.

On site
Installed in tiled floors and other finishes at designated movement joints to reduce cracking caused by thermal or structural movement.
Don't confuse with
Unlike an ordinary grout joint, a movement joint profile is specifically designed to accommodate movement.

Mullion

Architecture

A vertical member dividing adjacent window openings or glazed panels within a window or facade system.

On site
Visible in aluminium windows, curtain walls and large glazed building facades where it supports or separates glazing units.
Don't confuse with
Unlike a transom, a mullion runs vertically.

Multi-gas detector

Health and safety

A portable electronic instrument designed to monitor several atmospheric hazards, such as oxygen deficiency and specified toxic or flammable gases.

On site
Used by trained personnel when assessing sewer chambers, tanks and other spaces where dangerous atmospheres may occur.
Don't confuse with
Unlike a single-gas detector, a multi-gas detector monitors more than one specified atmospheric hazard.

Murram

Materials

Reddish gravelly laterite soil used for filling, roads and sub-bases.

On site
Compacted in layers for driveways, roads and under slabs.
Site name
Murram

Mutation survey

Surveying

A cadastral survey associated with an approved change to the configuration or records of registered land parcels.

On site
In Kenya, subdivision and related land changes may require survey documentation and mutation forms processed through the relevant authorities.
Don't confuse with
Unlike boundary reinstatement, a mutation survey documents an authorised change to parcel configuration.

N

Near miss

Health and safety

An unplanned event that could have caused injury, damage or loss but did not result in those consequences.

On site
A tool falling from scaffolding without hitting anyone is reported as a near miss so preventive measures can be introduced.
Don't confuse with
Unlike an injury accident, a near miss causes no actual injury but reveals a potential hazard.

Negative skin friction

Geotechnical

Downward shaft friction acting on a pile when surrounding soil settles more than the pile itself.

On site
Considered when designing piles through compressible soil layers affected by new fill, consolidation or groundwater changes.
Don't confuse with
Unlike positive shaft resistance that supports a pile, negative skin friction adds a downward load.

Neutral axis

Structural

The line within a cross-section where longitudinal strain is zero during bending under the usual plane-section assumption.

On site
Engineers locate the neutral axis when analysing bending stresses and calculating the resistance of reinforced concrete and steel sections.
Don't confuse with
Unlike the centroid, the neutral axis does not always pass through the geometric centre of a section.

Neutral conductor

Electrical

A conductor connected to the neutral point of an electrical system and capable of carrying current during normal operation.

On site
Identified and terminated in distribution boards and circuits according to the applicable wiring standard.
Don't confuse with
Unlike a protective earth conductor, the neutral conductor normally carries operating current.

No-fines concrete

Concrete

Concrete made using cement paste and mainly coarse aggregate, with little or no fine aggregate.

On site
Used in certain drainage layers, lightweight construction and applications where a relatively open internal structure is required.
Don't confuse with
Unlike conventional concrete, no-fines concrete contains little or no sand.

Nogging

Steel and timber

A short horizontal or transverse framing member installed between timber studs or joists to provide restraint or support.

On site
Fixed between wall studs to improve framing stability and provide backing for fittings or board edges.
Don't confuse with
Unlike a wall stud, nogging normally connects adjacent framing members across their spacing.

Noise dosimeter

Health and safety

A personal monitoring instrument that measures a worker's accumulated noise exposure over a defined period.

On site
Worn during activities involving breakers, grinders, compressors and other noisy equipment to assess occupational noise exposure.
Don't confuse with
Unlike a sound level meter, a noise dosimeter measures accumulated personal exposure over time.

Nominal mix

Concrete

A standard volume ratio such as 1:2:4 used for small works without a lab mix design.

On site
Simple but less reliable than a designed mix.

Nominated subcontractor

Contracts

A specialist subcontractor selected or nominated through procedures provided in the main construction contract.

On site
May undertake specialised works such as lifts, mechanical installations or electrical systems under applicable JBC-style arrangements.
Don't confuse with
Unlike a domestic subcontractor, a nominated subcontractor is selected through the contract's nomination procedure.

Non-conformance report (NCR)

Site practice

A formal record identifying work, materials or processes that do not meet specified project requirements.

On site
Issued when installed reinforcement, concrete quality or workmanship fails to satisfy approved drawings or specifications.
Don't confuse with
Unlike an inspection request, an NCR records a failure to meet requirements rather than requesting an inspection.

Nondo

Materials

Kenyan site word for steel reinforcement bars.

On site
You will hear "nondo ya 12" for Y12 bars.
Site name
Nondo

Normally consolidated soil

Geotechnical

Soil whose current vertical effective stress is approximately the greatest it has experienced during its geological history.

On site
Important when predicting settlement beneath foundations and embankments, especially in soft clay deposits.
Don't confuse with
Unlike overconsolidated soil, normally consolidated soil has not previously experienced substantially higher vertical effective stress.

North point

Drawings

The arrow on a drawing that shows the direction of north.

On site
Used to orient the plan on site.

Notice of claim

Contracts

A formal contractual notification that a party considers itself entitled to additional payment, time or another contractual remedy.

On site
Submitted within the required contractual timeframe after an event potentially giving rise to a claim.
Don't confuse with
Unlike a fully detailed claim, an initial notice may simply identify the event and intended entitlement.

O

Occupancy classification

Architecture

The categorisation of a building or part of a building according to its intended use and associated regulatory requirements.

On site
Used when determining applicable building provisions for residential, commercial, educational, industrial and other occupancy types.
Don't confuse with
Unlike occupant load, occupancy classification describes building use rather than the calculated number of people.

Occupancy sensor

Electrical

A device that detects the presence or movement of people and controls connected electrical equipment accordingly.

On site
Installed in corridors, washrooms, offices and staircases to operate lighting automatically and reduce unnecessary energy consumption.
Don't confuse with
Unlike a photocell switch, an occupancy sensor responds to people rather than ambient light levels.

Occupation certificate

Architecture

An official document confirming that a completed building may be occupied under the applicable regulatory requirements.

On site
Sought from the relevant authority after required inspections and completion procedures for buildings subject to occupation certification.
Don't confuse with
Unlike a building permit issued before construction, an occupation certificate relates to permission to occupy a completed building.

Oedometer consolidation test

Lab testing

A laboratory test that measures soil compression and time-dependent settlement under vertical loading while lateral deformation is restrained.

On site
Performed on suitable undisturbed soil samples to estimate settlement behaviour beneath foundations and embankments.
Don't confuse with
Unlike a direct shear test, an oedometer test primarily investigates soil compressibility rather than shear strength.

Offset

Surveying

A short measurement taken at right angles from a survey line to a feature.

On site
Used to locate features and to set out pegs that will not be disturbed by excavation.

One-way slab

Structural

A slab that spans mainly in one direction, usually when its length is more than twice its width.

On site
Main steel runs across the short span.

Optimum moisture content (OMC)

Lab testing

The moisture content at which a soil reaches its maximum dry density under a set compaction effort.

On site
Water is added or the soil is dried to get close to OMC before rolling.

Ordinary Portland Cement (OPC)

Materials

The standard general-purpose cement, often classed as CEM I.

On site
Used for structural concrete. Strength classes such as 42.5 are printed on the bag.

Oriented strand board (OSB)

Materials

An engineered wood panel manufactured by bonding oriented wood strands together under heat and pressure.

On site
Used in suitable wall sheathing, roof decking, flooring substrates and prefabricated timber construction.
Don't confuse with
Unlike plywood, OSB is manufactured from wood strands rather than continuous timber veneers.

Orthometric height

Surveying

The height of a point above the geoid, measured along the direction of the gravity field.

On site
Used in elevation control for roads, buildings and drainage works, with appropriate vertical datum information.
Don't confuse with
Unlike ellipsoidal height, orthometric height is referenced to the geoid.

Orthophoto

Surveying

An aerial or satellite image corrected for camera perspective and terrain distortion so features appear in their mapped positions.

On site
Produced from drone or aerial surveys for site mapping, road corridor planning and construction progress documentation.
Don't confuse with
Unlike an ordinary aerial photograph, an orthophoto is geometrically corrected for mapping.

Outrigger system

Structural

A structural system connecting a building's central core to perimeter columns to improve resistance against lateral movement and overturning.

On site
Used in tall buildings where stiff outriggers help engage external columns in resisting wind-induced or earthquake-induced overturning.
Don't confuse with
Unlike a conventional floor beam, an outrigger primarily helps control the building's overall lateral response.

Over-excavation

Earthworks

Removal of soil or rock beyond the specified excavation dimensions or levels.

On site
May occur when an excavator digs below the required foundation formation. The engineer must approve the method of correcting the excavation.
Don't confuse with
Unlike planned excavation, over-excavation extends beyond the specified limits.

Over-reinforced section

Structural

A reinforced concrete section containing enough tension reinforcement that the compression concrete crushes before the tension steel yields.

On site
Engineers generally avoid this behaviour in ordinary beam design because concrete crushing can cause sudden failure with limited warning.
Don't confuse with
Unlike an under-reinforced section, an over-reinforced section fails through concrete crushing before tension steel yields.

Over-vibration

Concrete

Excessive vibration of fresh concrete beyond what is needed to achieve proper compaction.

On site
May cause segregation, especially in unstable mixes, when a poker vibrator is held too long in one location.
Don't confuse with
Unlike under-vibration, over-vibration applies excessive compaction energy.

Overconsolidation ratio (OCR)

Geotechnical

The ratio of a soil's maximum past vertical effective stress to its current vertical effective stress.

On site
Determined from suitable laboratory results and ground history to assess clay behaviour, compressibility and settlement potential.
Don't confuse with
Normally consolidated soil has an OCR of approximately one, while overconsolidated soil has an OCR greater than one.

Overflow pipe

Plumbing

A pipe that safely carries away excess water when the level in a tank or sanitary appliance rises above its intended limit.

On site
Installed on water storage tanks and suitable plumbing appliances to reduce the risk of uncontrolled overflow.
Don't confuse with
Unlike a normal outlet pipe, an overflow pipe operates when water exceeds a specified level.

Overhang (eaves)

Roofing

The part of the roof that extends beyond the outside face of the wall.

On site
Protects walls from rain. Add it to the sheet length when ordering mabati.

Overhanging beam

Structural

A beam that extends beyond one or both of its supports, creating a projecting portion.

On site
Common in balconies, roof projections and suspended structures where part of a beam extends past the supporting column or wall.
Don't confuse with
Unlike a cantilever, an overhanging beam has supports within its length, with a portion extending beyond them.

Overtaking sight distance

Roads

The visibility distance needed for a driver to safely overtake a slower vehicle under specified road and traffic conditions.

On site
Considered on two-way roads when identifying locations where overtaking may be permitted or restricted.
Don't confuse with
Unlike stopping sight distance, overtaking sight distance considers the distance required to complete a passing manoeuvre.

P

Pad foundation

Structural

An isolated square or rectangular footing under a single column.

On site
Common for framed buildings. Size depends on column load and soil bearing capacity.

Paint primer

Finishes

A preparatory coating applied before finishing paint to improve adhesion and prepare the substrate for subsequent coats.

On site
Applied to suitable new plaster, timber or metal surfaces before painting, using a primer compatible with the substrate and finish.
Don't confuse with
Unlike a topcoat, primer prepares the surface rather than providing the final decorative appearance.

Paint sealer

Finishes

A preparatory coating that reduces or controls surface porosity and helps provide a suitable base for subsequent paint layers.

On site
Used on porous plaster, masonry and other suitable surfaces to control uneven paint absorption.
Don't confuse with
A primer mainly promotes adhesion, while a sealer primarily controls porosity or isolates the substrate.

Paper space

Drawings

The CAD layout environment used to arrange drawing sheets, viewports, annotations and title blocks for printing.

On site
Used to prepare A1, A2, A3 and other drawing sheet layouts with correctly scaled views and presentation information.
Don't confuse with
Unlike model space, paper space is primarily used for sheet composition and plotting.

Parallax

Surveying

Apparent movement between a target image and telescope crosshairs when the observer changes eye position because focusing is incorrect.

On site
Eliminated by correctly focusing the eyepiece and target before taking staff or angular readings.
Don't confuse with
Unlike collimation error, parallax is mainly caused by incorrect focusing.

Parapet

Architecture

A low wall along the edge of a roof, balcony or bridge.

On site
Provides safety and can hide a flat or low-pitch roof.

Parapet coping

Roofing

A protective covering installed along the top of a parapet wall to shed water and protect the wall from moisture penetration.

On site
Constructed using suitable precast concrete, metal or other materials, with drip details and joints arranged to control rainwater.
Don't confuse with
Unlike ridge capping, parapet coping protects the top of a parapet wall rather than a pitched roof ridge.

Partial factor

Structural

A factor used in limit state design to account for uncertainties in actions, material properties or structural resistance.

On site
Eurocode calculations use specified partial factors when determining design actions and material strengths for different design situations.
Don't confuse with
Unlike a single overall factor of safety, partial factors separately address different sources of uncertainty.

Particular conditions

Contracts

Project-specific contract provisions that supplement or amend the standard general conditions of a construction contract.

On site
Used in FIDIC-based contracts to address project requirements, local legal considerations and agreed administrative arrangements.
Don't confuse with
Unlike general conditions, particular conditions are prepared for the requirements of a specific contract.

Partition wall

Architecture

A non-structural wall that divides space inside a building.

On site
Can be blockwork, drywall or timber.

Passive earth pressure

Geotechnical

The lateral resistance developed when a retaining structure moves sufficiently into the adjacent soil.

On site
Used when checking resistance against sliding or lateral movement of retaining structures and embedded foundations.
Don't confuse with
Unlike active earth pressure, passive pressure develops when the structure pushes into the soil.

Pavement

Roads

In engineering, all the layers of a road built above the subgrade: sub-base, base and surfacing.

On site
Pavement design sets the type and thickness of each layer.
Don't confuse with
In everyday British English, a pavement is a footpath.

Pavement subdrain

Roads

A drainage system installed below or alongside pavement layers to collect and remove subsurface water.

On site
Perforated pipes and suitable drainage materials may be installed near pavement edges to prevent water accumulation within road layers.
Don't confuse with
Unlike a surface drain, a pavement subdrain removes water from beneath the road surface.

Payment application

Contracts

A contractor's formal submission requesting payment for completed work or other amounts due under the contract.

On site
Includes measured quantities, supporting records and calculations submitted for review by the contract administrator or quantity surveyor.
Don't confuse with
Unlike a payment certificate, a payment application is the contractor's request rather than the certified amount.

Payment certificate

Contracts

A formal document certifying an amount payable under a construction contract following the required assessment.

On site
Issued by the authorised contract administrator after reviewing the contractor's payment application and relevant adjustments.
Don't confuse with
Unlike a payment application, a payment certificate records an assessed and certified amount.

Peak discharge

Drainage

The maximum flow rate occurring at a specified location during a rainfall, flood or drainage event.

On site
Calculated when sizing culverts, channels and stormwater pipes to convey expected design flows.
Don't confuse with
Unlike total runoff volume, peak discharge measures the maximum rate of flow.

Penetration resistance test

Concrete

A test that measures resistance to penetration by a standardised probe or needle, depending on the testing method.

On site
Used to assess setting behaviour of concrete mortar fractions or estimate in-place strength using calibrated penetration methods.
Don't confuse with
Unlike a compressive strength test, penetration testing assesses resistance to localised penetration.

Performance certificate (FIDIC)

Contracts

A certificate issued under applicable FIDIC provisions after the contractor has completed the specified remaining work and defect-remedying obligations.

On site
Issued after the relevant contractual requirements have been met, usually following the defects notification process.
Don't confuse with
Unlike a taking-over certificate, a performance certificate comes after the specified post-completion obligations are fulfilled.

Performance security

Contracts

A financial guarantee or other approved security provided to protect the employer against specified contractor failures during contract performance.

On site
Often submitted after contract award, with its amount, form and release conditions stated in the contract.
Don't confuse with
Unlike bid security, performance security relates to obligations under an awarded contract.

Permeable pavement

Drainage

A pavement system designed to allow rainwater to pass through its surface into underlying drainage or storage layers.

On site
Used in suitable parking areas, walkways and low-traffic spaces to reduce surface runoff and support stormwater management.
Don't confuse with
Unlike conventional impermeable pavement, permeable pavement allows water to enter through the pavement surface.

Permeation grouting

Geotechnical

A ground improvement method that injects a flowable grout into interconnected soil voids without intentionally disturbing the soil structure.

On site
Used in suitable permeable soils to reduce water flow or improve strength beneath foundations and excavations.
Don't confuse with
Unlike jet grouting, permeation grouting fills existing voids rather than deliberately cutting and mixing the soil.

Permit to work (PTW)

Site practice

A formal authorisation system controlling specified high-risk activities before work begins.

On site
Used for activities such as hot works, confined space entry and certain electrical works after required precautions have been verified.
Don't confuse with
Unlike a method statement, a permit to work authorises specific work under defined conditions.

Perpend (perp)

Masonry

A vertical mortar joint between blocks in the same course.

On site
Should be fully filled and line up every other course in stretcher bond.
Don't confuse with
Bed joint, the horizontal joint.

Pervious concrete

Concrete

Concrete designed with interconnected voids that allow water to pass through the hardened material.

On site
Used in selected parking areas, pedestrian paths and drainage-friendly pavements where stormwater infiltration is required.
Don't confuse with
Unlike conventional dense concrete, pervious concrete intentionally allows water to pass through.

Phase balancing

Electrical

The arrangement of electrical loads across phases to reduce excessive current imbalance in a multiphase system.

On site
Electricians distribute single-phase loads across three-phase distribution boards to improve loading balance and reduce neutral current where practical.
Don't confuse with
Unlike phase sequencing, phase balancing concerns load distribution rather than phase rotation order.

Photocell switch

Electrical

A light-sensitive switching device that controls electrical equipment according to the surrounding illumination level.

On site
Used for security lights, compound lighting and street lighting that switches on when daylight falls below a selected level.
Don't confuse with
Unlike an occupancy sensor, a photocell switch responds to light levels rather than human presence.

Pier cap

Bridges

A horizontal structural member at the top of a bridge pier that distributes loads from the bridge superstructure to the supporting columns.

On site
Constructed above pier columns to support girder bearings and distribute reactions across the pier.
Don't confuse with
Unlike the pier column, the pier cap distributes loads horizontally between supporting elements.

Pile

Structural

A long column driven or bored deep into the ground to carry loads to stronger soil or rock.

On site
Used when the top soil is too weak for normal foundations.

Piling rig

Plant

Specialised construction equipment used to install deep foundation piles through drilling, driving or other suitable installation methods.

On site
Used on bridge, commercial building and deep foundation projects where shallow foundations cannot adequately support the structural loads.
Don't confuse with
Unlike an ordinary excavator, a piling rig is specifically equipped for installing foundation piles.

Pinned support

Structural

A support that stops movement but allows rotation.

On site
Simple beam ends on walls are usually treated as pinned.

Pipe insulation

Plumbing

A protective insulating material fitted around pipes to reduce heat transfer, condensation or temperature-related problems.

On site
Installed around hot water pipes to reduce heat loss and around suitable cold water pipes to control surface condensation.
Don't confuse with
Unlike a pipe sleeve, insulation primarily controls heat transfer.

Pipe saddle

Plumbing

A fitting attached around an existing pipe to provide a branch connection or tapping point.

On site
Used when connecting smaller water service pipes to compatible larger distribution mains, following approved installation procedures.
Don't confuse with
Unlike a tee fitting, a pipe saddle can provide a branch connection without replacing a complete pipe section.

Pipe sleeve

Plumbing

A protective tube or opening provided around a pipe where it passes through a wall, floor or structural element.

On site
Installed before concreting or during approved drilling works to protect pipes and allow suitable sealing or movement.
Don't confuse with
Unlike pipe insulation, a sleeve primarily provides protection and clearance at a penetration.

Pipe surround

Earthworks

Selected material placed around an underground pipe to provide support and protection against damaging concentrated loads.

On site
Placed carefully alongside and above buried pipes, with material type and compaction following the project specification.
Don't confuse with
Unlike trench bedding, pipe surround supports and protects the sides and upper portion of a buried pipe.

Pipe union

Plumbing

A detachable pipe fitting that joins two pipe sections while allowing them to be separated without cutting the pipes.

On site
Installed near pumps, valves and other equipment that may require removal for maintenance or replacement.
Don't confuse with
Unlike a permanent pipe coupling, a union is designed for convenient disconnection.

Plan

Drawings

A drawing showing a horizontal view of a building, as if seen from above with the roof removed.

On site
Floor plans show walls, doors, windows and room sizes.

Plant utilisation log

Site practice

A record tracking the operating hours, standby periods and activities of construction machinery or equipment.

On site
Used to monitor excavators, rollers, cranes and other plant for productivity assessment, equipment costing and hire verification.
Don't confuse with
Unlike a maintenance log, a utilisation log primarily records equipment use rather than servicing and repairs.

Plaster

Finishes

A smooth layer of cement-sand mortar applied to walls and ceilings.

On site
Usually 12 to 15 mm internally. Walls are wetted before plastering for good bond.
Don't confuse with
Render, the external version, often with a different mix.

Plastic hinge

Structural

A region of a structural member where yielding allows substantial rotation with little additional increase in bending moment.

On site
Engineers identify potential plastic hinge locations when assessing structural ductility, moment redistribution and collapse mechanisms.
Don't confuse with
Unlike a physical pinned connection, a plastic hinge forms through yielding of the structural material.

Plastic shrinkage cracking

Concrete

Cracking that develops in fresh concrete when surface moisture evaporates faster than it can be replaced before sufficient strength develops.

On site
Often appears on exposed slabs during hot, dry or windy weather, especially when evaporation control is inadequate.
Don't confuse with
Unlike drying shrinkage cracks, plastic shrinkage cracks develop before concrete has fully hardened.

Plasticiser

Materials

An admixture that makes concrete more workable without adding water.

On site
Lets you keep a low water-cement ratio and still place concrete easily.

Plasticity index (PI)

Lab testing

The liquid limit minus the plastic limit. It shows how plastic a clay is.

On site
High PI soils swell and shrink a lot, which is bad under roads and slabs.

Plate compactor

Plant

A vibrating plate machine used to compact soil, hardcore and paving.

On site
Used in layers of about 150 mm.

Plate load test

Lab testing

A field test that measures ground deformation under loads applied through a rigid plate placed on a prepared soil or foundation surface.

On site
Used to assess ground response and estimate bearing or deformation characteristics under specified testing conditions.
Don't confuse with
Unlike the CBR test, plate load testing directly measures settlement beneath an applied loading plate.

Plinth

Masonry

The part of the wall between ground level and the ground floor level.

On site
The DPC is usually at the top of the plinth.

Plot amalgamation

Architecture

The formal combination of two or more adjacent land parcels into a single parcel through the required approval and registration processes.

On site
Used when developers need a larger site for housing estates, commercial buildings or other projects involving neighbouring plots.
Don't confuse with
Unlike land subdivision, plot amalgamation combines parcels rather than dividing them.

Plot ratio

Architecture

The total floor area of a building divided by the plot area.

On site
Planning authorities limit it to control density.

Plumb

Site practice

Perfectly vertical.

On site
Checked with a plumb bob or spirit level on walls, columns and formwork.
Don't confuse with
Level, which means perfectly horizontal.

Plywood

Materials

A manufactured wood panel made by bonding thin timber veneers together, commonly with adjacent layers having perpendicular grain directions.

On site
Used for concrete formwork, roofing underlays, partitions, cabinetry and temporary site works, depending on its grade.
Don't confuse with
Unlike ordinary solid timber boards, plywood consists of several bonded veneer layers.

Pneumatic-tyred roller

Plant

A compaction machine fitted with multiple rubber tyres that apply pressure and kneading action to pavement materials.

On site
Used in road construction for compacting asphalt layers and suitable granular materials, helping produce uniform density.
Don't confuse with
Unlike a steel-drum roller, a pneumatic-tyred roller compacts materials using rubber tyres.

Point cloud

Surveying

A collection of three-dimensional measured points representing the geometry of surveyed surfaces and objects.

On site
Generated using laser scanners or photogrammetry and processed to create site models, building measurements and terrain information.
Don't confuse with
Unlike a finished 3D model, a point cloud consists primarily of individual measured spatial points.

Point load

Structural

A load acting at a single point, such as a column sitting on a beam.

On site
Shown as a single arrow in structural analysis.
Don't confuse with
UDL, which is spread along the length.

Polymer-modified bitumen (PMB)

Roads

Bituminous binder modified with selected polymers to improve properties such as elasticity, deformation resistance and temperature performance.

On site
Used in specified asphalt mixtures and surface treatments where improved resistance to rutting, cracking or other pavement distress is required.
Don't confuse with
Unlike conventional paving bitumen, PMB contains added polymers that modify its engineering properties.

Polypropylene fibre

Materials

A synthetic polymer fibre added to cementitious mixtures for specific purposes such as plastic shrinkage crack control or improved fire-spalling resistance.

On site
Used in concrete floors, screeds and specialised concrete mixes according to fibre type, dosage and design requirements.
Don't confuse with
Unlike steel fibres, polypropylene fibres are non-metallic and have different mechanical and thermal properties.

Polysulphide sealant

Materials

A flexible joint-sealing material based on polysulphide polymers, available in formulations with good resistance to certain chemicals and fuels.

On site
Used in specified movement joints, fuel-exposed pavements and selected water-retaining structures where chemical compatibility is important.
Don't confuse with
Unlike ordinary general-purpose sealants, suitable polysulphide formulations may offer enhanced resistance to certain fuels.

Polyurethane floor coating

Finishes

A protective floor coating based on polyurethane polymers, formulated to provide specified resistance to wear, chemicals or surface movement.

On site
Used on suitable industrial and commercial floors where the selected coating's flexibility and service resistance are beneficial.
Don't confuse with
Unlike epoxy coatings, polyurethane coatings may provide greater flexibility and different UV resistance depending on formulation.

Polyurethane sealant

Materials

An elastomeric sealing material based on polyurethane chemistry, used to seal joints while accommodating specified movement.

On site
Used in floor joints, facade joints and selected concrete connections where adhesion and movement capability are required.
Don't confuse with
Unlike silicone sealant, polyurethane sealant has different chemical compatibility, weathering and paintability characteristics.

Porcelain tile

Finishes

A dense ceramic tile manufactured to have very low water absorption and suitable strength and durability.

On site
Used on residential and commercial floors, bathrooms and suitable outdoor areas, depending on tile performance ratings.
Don't confuse with
Unlike many conventional ceramic tiles, porcelain tiles have very low water absorption.

Pore water pressure

Geotechnical

The pressure exerted by water occupying the spaces between soil particles.

On site
Measured or estimated during foundation, excavation and slope investigations because changes in pore water pressure affect soil stability and strength.
Don't confuse with
Unlike effective stress, pore water pressure acts through the water within soil voids.

Porosity

Geotechnical

The proportion of a soil's total volume occupied by spaces between its solid particles.

On site
Used when evaluating soil structure, groundwater storage and relationships between soil volume and density.
Don't confuse with
Unlike void ratio, porosity expresses void volume as a fraction of total soil volume.

Portal frame

Structural

A rigid structural frame, commonly formed by columns and rafters, designed to carry roof loads and resist lateral forces.

On site
Widely used in warehouses, workshops, factories and agricultural buildings where large internal spaces are needed without intermediate columns.
Don't confuse with
Unlike a simple pin-jointed roof truss system, a portal frame relies significantly on bending resistance in its rigid connections.

Position dilution of precision (PDOP)

Surveying

A numerical indicator showing how satellite geometry affects the precision of a three-dimensional GNSS position solution.

On site
Surveyors monitor PDOP during GNSS observations because poor satellite geometry can reduce positioning quality.
Don't confuse with
Unlike positional accuracy, PDOP describes satellite geometry rather than the actual coordinate error.

Post-tensioned slab

Structural

A concrete slab strengthened by tensioning high-strength steel tendons after the concrete has gained sufficient strength.

On site
Used in commercial buildings, parking structures and long-span floors to control cracking and deflection while reducing slab thickness.
Don't confuse with
Unlike conventional reinforced concrete slabs, post-tensioned slabs receive compressive force from tensioned tendons.

Pot bearing

Bridges

A bridge bearing containing confined elastomer inside a steel pot, allowing rotation while transmitting large vertical loads.

On site
Used in bridges carrying substantial loads, with additional sliding components where horizontal movement is required.
Don't confuse with
Unlike a simple elastomeric pad, a pot bearing confines its elastomer within a steel assembly.

Pothole

Roads

A localised hole or depression formed when pavement material breaks apart and is displaced from the road surface.

On site
Commonly repaired by removing loose material, preparing the damaged area and placing a suitable approved patching mixture.
Don't confuse with
Unlike surface cracking, a pothole involves actual loss of pavement material.

Pour

Concrete

One continuous concreting operation.

On site
Plan labour, materials, vibrators and curing before the pour starts.

Pour sequence

Site practice

The planned order in which concrete is placed across different sections or stages of a construction element.

On site
Engineers plan the sequence for large slabs, foundations and walls to manage placement continuity, loading and construction joints.
Don't confuse with
Unlike a concrete mix design, pour sequence concerns placement order rather than material proportions.

Power factor

Electrical

The ratio of real electrical power to apparent power in an alternating-current system.

On site
Monitored in commercial and industrial installations where motors and other equipment affect electrical efficiency and supply demand.
Don't confuse with
Unlike electrical efficiency, power factor describes the relationship between real and apparent power.

Power float

Concrete

A machine with rotating blades that smooths the surface of a fresh slab.

On site
Used on large floor slabs once the concrete is firm enough to walk on.

Pozzolanic cement (PPC)

Materials

Cement blended with pozzolana, a natural or industrial material that reacts with lime.

On site
Common in Kenya. Gains strength more slowly but gives good durability.

PPE (personal protective equipment)

Site practice

Safety gear such as helmets, boots, gloves, reflectors and goggles.

On site
The last line of protection. Everyone on site wears the basics.

PPR pipe

Plumbing

Polypropylene pipe joined by heat fusion, used for hot and cold water supply.

On site
Joints are made with a fusion welding machine. Common in Kenyan buildings.

Practical completion

Contracts

The stage when the works are finished enough for the client to use them.

On site
Triggers handover and the start of the defects liability period.

Pre-pour inspection

Site practice

A formal inspection conducted before placing concrete to verify that the work is ready for concreting.

On site
Checks reinforcement positions, concrete cover, formwork stability, cleanliness, dimensions and embedded items against approved drawings.
Don't confuse with
Unlike a concrete pour card, a pre-pour inspection is the actual examination of the prepared work.

Precast concrete

Concrete

Concrete elements cast and cured elsewhere, then brought to site and installed.

On site
Examples are lintels, kerbs, culverts and slab units.
Don't confuse with
In-situ concrete, which is cast in its final position.

Precast I-girder

Bridges

A factory-cast or yard-cast concrete bridge girder with an I-shaped cross-section, commonly prestressed for improved span capacity.

On site
Manufactured off-site or in a casting yard, transported to the bridge and lifted onto prepared bearings.
Don't confuse with
Unlike a box girder, an I-girder has an open cross-section with two flanges connected by a web.

Preconsolidation pressure

Geotechnical

The maximum past vertical effective stress experienced by a soil, estimated from its stress history.

On site
Engineers estimate it from consolidation test results to predict how clay will compress under new foundation loads.
Don't confuse with
Unlike current effective stress, preconsolidation pressure represents the soil's historical maximum vertical effective stress.

Prefabricated vertical drain (PVD)

Geotechnical

A manufactured drainage strip installed vertically in soft soil to shorten the distance pore water must travel during consolidation.

On site
Installed beneath embankments or preload areas to accelerate settlement in soft clay deposits.
Don't confuse with
Unlike a conventional drainage pipe, a PVD is a thin drainage strip designed mainly to accelerate consolidation.

Preloaded bolt

Steel and timber

A high-strength structural bolt tightened to introduce a specified tensile force that clamps connected steel components together.

On site
Installed in designated steel connections using approved tightening procedures and verified bolt assemblies.
Don't confuse with
Unlike an ordinary snug-tight bolt, a preloaded bolt requires a specified installation preload.

Prequalification

Contracts

A procurement process used to assess whether prospective bidders meet specified eligibility, experience, financial and technical requirements.

On site
Clients may prequalify contractors before inviting them to compete for major building, road or infrastructure projects.
Don't confuse with
Unlike tender evaluation, prequalification primarily assesses a bidder's suitability before detailed bids are considered.

Pressure air content test

Lab testing

A test that determines the air content of suitable fresh concrete using a calibrated pressure-type measuring apparatus.

On site
Performed during concrete quality control to check whether fresh concrete meets specified total air content requirements.
Don't confuse with
Unlike hardened concrete void analysis, this test measures air content while the concrete is fresh.

Pressure reducing valve (PRV)

Plumbing

An automatic valve that reduces high incoming water pressure to a lower, controlled downstream pressure.

On site
Installed where municipal supply pressure or elevated tank pressure exceeds the safe operating pressure of building plumbing fixtures.
Don't confuse with
Unlike a pressure relief valve, a PRV regulates normal downstream pressure rather than releasing excessive pressure.

Pressure tank

Plumbing

A tank that stores water under pressure, often using compressed air separated from the water by a diaphragm or bladder.

On site
Installed with domestic or commercial booster pumps to maintain water pressure and reduce frequent pump starting.
Don't confuse with
Unlike an ordinary open storage tank, a pressure tank operates as part of a pressurised supply system.

Prestressed concrete

Structural

Concrete given deliberate internal compressive stresses, usually using tensioned steel tendons, to improve its behaviour under service loads.

On site
Used in bridge girders, precast beams and long-span floor systems where controlling tensile stresses, cracking and deflection is important.
Don't confuse with
Unlike conventional reinforced concrete, prestressed concrete receives an intentional compressive force before carrying its full design loads.

Price adjustment

Contracts

A contractual mechanism for revising payable amounts to reflect specified changes in costs or other defined pricing factors.

On site
May apply to eligible construction contracts where material, fuel or labour cost changes meet the stated adjustment provisions.
Don't confuse with
Unlike a variation, price adjustment does not necessarily involve changing the scope of works.

Prime coat

Roads

A thin spray of low-viscosity bitumen on a granular base before surfacing.

On site
It seals the base and helps the surfacing bond to it.
Don't confuse with
Tack coat, sprayed between two bituminous layers.

Prime cost (PC) sum

Contracts

An amount in the BOQ for work or goods from a nominated supplier or subcontractor.

On site
Adjusted to the actual cost later.

Prism constant

Surveying

A correction value associated with a surveying reflector that accounts for the relationship between its reference point and optical measurement path.

On site
Set correctly in a total station when measuring distances to survey prisms to avoid systematic distance errors.
Don't confuse with
Unlike instrument height, prism constant corrects the distance measurement rather than the instrument's elevation above a station.

Profile board

Surveying

A horizontal board on two pegs set outside the trench, with nails marking wall and trench lines.

On site
Strings between profiles show where to dig and build, even after the pegs are dug out.

Programme of works

Contracts

A planned schedule showing the sequence, durations and timing of construction activities required to complete a project.

On site
Submitted and updated by contractors to coordinate excavation, structural works, finishes, services and project completion.
Don't confuse with
Unlike a method statement, a programme primarily explains when activities will occur rather than how they will be executed.

Progressive collapse

Structural

A situation where an initial local structural failure spreads to other parts of a building, causing disproportionately extensive damage.

On site
Engineers consider robustness, continuity and alternative load paths to reduce the risk of widespread collapse following local damage.
Don't confuse with
Unlike a localised failure, progressive collapse spreads beyond the initially damaged structural region.

Prolongation costs

Contracts

Additional time-related expenses incurred because construction activities or project completion continue beyond the originally planned period.

On site
May include extended site supervision, temporary facilities and equipment costs, subject to contractual entitlement and supporting evidence.
Don't confuse with
Unlike disruption costs, prolongation costs primarily arise from additional project duration.

Proof rolling

Earthworks

A field assessment in which a loaded vehicle or roller passes over prepared ground to reveal weak or unstable areas.

On site
Used before constructing pavement layers to identify excessive rutting, movement or deflection requiring investigation and correction.
Don't confuse with
Unlike a field density test, proof rolling evaluates visible ground response under loading rather than directly measuring dry density.

Propped cantilever

Structural

A cantilever beam with an additional support, usually near its free end, that reduces deflection and changes how bending moments are distributed.

On site
Engineers may use this arrangement in projecting structures where an additional column or support is provided to improve stiffness.
Don't confuse with
Unlike an ordinary cantilever, a propped cantilever has an additional support.

Props

Concrete

Vertical supports, usually adjustable steel, that hold formwork for slabs and beams.

On site
Must stand on firm ground or sole plates and be braced.

Prospective short-circuit current

Electrical

The current that would flow at a specified point if a short circuit occurred under the assumed supply conditions.

On site
Calculated or measured when selecting circuit breakers and switchgear with adequate short-circuit breaking capacity.
Don't confuse with
Unlike normal operating current, prospective short-circuit current represents a possible fault condition.

Protective earth conductor (PE)

Electrical

A conductor connecting exposed conductive equipment parts to the protective earthing system for electrical safety.

On site
Connected to metal equipment enclosures, socket earthing terminals and other exposed conductive parts requiring fault protection.
Don't confuse with
Unlike the neutral conductor, the protective earth conductor does not normally carry operating current.

Provisional sum

Contracts

An amount in the BOQ for work that cannot be fully defined at tender time.

On site
Spent only on instruction and adjusted to actual work done.

Pull-out test

Concrete

A test that measures the force required to pull a specially embedded insert from concrete, providing an indirect indication of strength.

On site
Used for in-place strength assessment where a calibrated relationship between pull-out force and concrete strength has been established.
Don't confuse with
Unlike a cube test, a pull-out test assesses concrete in the structure using extraction force.

Punching shear

Structural

Failure where a column pushes through a slab or footing like a punch.

On site
Checked around columns in flat slabs and pad footings.

Purchase order

Site practice

A formal document issued to a supplier specifying the goods or services being ordered and the agreed purchasing requirements.

On site
Used to order reinforcement steel, concrete, pipes, equipment or other materials from approved suppliers.
Don't confuse with
Unlike a purchase requisition, a purchase order communicates the actual order to the supplier.

Purchase requisition

Site practice

An internal document requesting approval to purchase specified goods, materials or services.

On site
Raised when site teams identify materials or equipment that must be obtained from external suppliers.
Don't confuse with
Unlike a purchase order, a purchase requisition requests internal purchasing approval rather than placing an order with a supplier.

Purlin

Roofing

A horizontal member running along the roof, on top of the rafters or trusses, that supports the roofing sheets.

On site
Spacing depends on the sheet profile and gauge. Check the manufacturer data.

Push-fit fitting

Plumbing

A mechanical pipe connector designed to grip and seal a compatible pipe when the pipe is pushed into the fitting.

On site
Used in suitable plastic and copper plumbing systems where quick assembly without soldering or adhesive is required.
Don't confuse with
Unlike compression fittings, push-fit fittings generally do not require tightening a compression nut.

Q

Quality inspection checklist

Site practice

A structured list of requirements checked to verify that construction work meets approved drawings, specifications and quality standards.

On site
Used before concrete pours to verify reinforcement, cover, formwork dimensions, cleanliness and embedded services.
Don't confuse with
Unlike an ITP, a quality checklist records detailed checks for a particular inspection or activity.

Quantity surveyor (QS)

Contracts

The professional who measures and manages the cost of construction work.

On site
Prepares the BOQ, values work done and handles variations.

Queen closer

Masonry

A brick cut lengthwise into two approximately equal halves, commonly used to maintain the correct bonding arrangement.

On site
Placed beside quoin headers in certain traditional brick bonds to prevent continuous vertical joints.
Don't confuse with
Unlike a half-bat, a queen closer is cut lengthwise rather than across the brick.

Quoin

Masonry

The external corner of a wall.

On site
Built first and checked for plumb, then the wall is filled in between corners using a line.

R

Radial circuit

Electrical

An electrical circuit arranged so power flows from its protective device along a route that does not return to the supply point.

On site
Used for lighting, socket outlets and dedicated equipment circuits according to the electrical design.
Don't confuse with
Unlike a ring circuit, a radial circuit does not form a closed loop back to its protective device.

Raft foundation

Structural

A thick reinforced slab under the whole building that spreads loads over a large area.

On site
Used on weak soils or where pad footings would almost touch.

Rafter

Roofing

A sloping member running from the ridge to the eaves that supports the roof.

On site
In trussed roofs, the top chord of the truss acts as the rafter.

Rain garden

Drainage

A shallow planted depression designed to temporarily collect stormwater and allow it to infiltrate or pass through engineered soil.

On site
Used near buildings, parking areas and landscaped developments to manage roof and paved-surface runoff.
Don't confuse with
Unlike a vegetated swale, a rain garden primarily collects and treats runoff within a planted depression.

Rainscreen facade

Architecture

An external cladding system with a cavity behind its outer panels that helps manage rainwater penetration and moisture.

On site
Installed on commercial buildings using cladding panels, supporting rails, cavity barriers and suitable drainage details.
Don't confuse with
Unlike a solid rendered wall, a rainscreen facade uses a separate outer cladding layer and cavity.

Rainwater hopper head

Roofing

A funnel-shaped or box-shaped fitting that receives rainwater from a gutter or roof outlet and directs it into a downpipe.

On site
Installed at selected roof drainage discharge points, particularly where several outlets connect to one vertical downpipe.
Don't confuse with
Unlike a downpipe, a hopper head collects water before directing it into the vertical pipe.

Raised access floor

Finishes

An elevated flooring system made from removable panels supported by adjustable pedestals above the structural floor.

On site
Used in data centres and offices to provide concealed space for electrical cables, communication systems and other approved services.
Don't confuse with
Unlike a conventional floor finish, a raised access floor creates an accessible service void beneath its panels.

Raised pavement marker (road stud)

Roads

A small raised device installed on a road surface to improve lane guidance or indicate road boundaries.

On site
Installed along lane lines, road edges and curves, often with reflective surfaces to improve visibility at night.
Don't confuse with
Unlike painted road markings, raised pavement markers physically project above the road surface.

Rapid chloride permeability test (RCPT)

Lab testing

A test that measures electrical charge passed through a saturated concrete specimen under specified voltage and time conditions.

On site
Used as an indirect indicator of concrete resistance to chloride ion penetration, with interpretation considering mix composition and electrical conductivity.
Don't confuse with
Unlike direct chloride diffusion testing, RCPT measures electrical charge rather than actual chloride penetration depth.

Rapid-hardening Portland cement

Materials

Portland cement designed to develop strength faster during the early stages of hydration.

On site
Used in precast concrete production, urgent repairs and construction requiring earlier formwork removal, subject to strength verification.
Don't confuse with
Rapid-hardening cement develops early strength quickly, while rapid-setting cement primarily shortens setting time.

Rapid-setting concrete

Concrete

Concrete formulated to begin setting significantly faster than ordinary concrete, allowing reduced waiting time before initial hardening.

On site
Used in urgent pavement repairs, utility reinstatement and other works requiring short placement and setting periods.
Don't confuse with
Rapid-setting describes setting time, while rapid-hardening describes the rate of strength development.

Rat-trap bond

Masonry

A brick bonding arrangement that positions bricks on edge to create continuous internal cavities within a wall.

On site
Used in suitable brick masonry construction where reducing brick consumption and improving thermal performance are design considerations.
Don't confuse with
Unlike conventional solid brickwork, rat-trap bond intentionally creates cavities within the wall.

Rational method

Drainage

A simplified hydrological method used to estimate peak runoff from a catchment using rainfall intensity, catchment area and a runoff coefficient.

On site
Commonly used for designing drainage systems serving relatively small catchments, subject to the applicable design guidance.
Don't confuse with
Unlike detailed rainfall-runoff modelling, the Rational method estimates peak discharge without producing a complete runoff hydrograph.

Ravelling

Roads

Progressive loss of aggregate particles from an asphalt pavement surface due to deterioration of the binder-aggregate bond or mixture.

On site
Appears as a rough, loose surface on ageing or poorly constructed asphalt roads, potentially developing into more serious defects.
Don't confuse with
Unlike rutting, ravelling involves loss of surface particles rather than permanent wheel-path deformation.

RCD (residual current device)

Electrical

A device that cuts power quickly if current leaks to earth, protecting people from shock.

On site
Tested with its test button regularly.
Don't confuse with
MCB, which protects against overload and short circuit.

Reaction

Structural

The force a support provides to hold a beam or structure in balance.

On site
For a simply supported beam with a UDL, each reaction is half the total load.

Ready-mix concrete

Concrete

Concrete batched at a plant and delivered to site in a truck mixer.

On site
Check the delivery ticket for class and time of batching. Do a slump test on arrival.

Real-time kinematic (RTK) GNSS

Surveying

A satellite positioning technique that uses real-time correction data and carrier-phase measurements to achieve high-precision coordinates under suitable conditions.

On site
Used for topographic surveys, construction setting out and road surveys where suitable correction coverage and satellite visibility are available.
Don't confuse with
Unlike standalone GNSS positioning, RTK uses correction information to improve positional accuracy.

Rebound hammer

Lab testing

A non-destructive tool that estimates concrete surface hardness and strength.

On site
Used to compare areas of a structure. It does not replace cube or core tests.

Recessed mortar joint

Masonry

A masonry joint finished below the outer face of the surrounding units to create a shadow line.

On site
Used in selected decorative exposed brickwork where joint depth and weather exposure are considered in the specification.
Don't confuse with
Unlike a flush joint, a recessed joint is set back from the masonry face.

Reciprocal levelling

Surveying

A levelling technique that uses observations from both sides of an obstacle to reduce errors caused by collimation, curvature and refraction.

On site
Used when transferring elevations across rivers, valleys or other obstacles where equal sight distances cannot be maintained.
Don't confuse with
Unlike ordinary differential levelling, reciprocal levelling uses observations from opposite sides of an obstacle.

Recompression index

Geotechnical

A parameter describing soil compression during reloading within a previously experienced effective stress range.

On site
Used when calculating settlement of overconsolidated clay under foundation loads that remain below its preconsolidation pressure.
Don't confuse with
Unlike the compression index, the recompression index describes compression before virgin loading begins.

Rectangular hollow section (RHS)

Steel and timber

A hollow structural steel section with a rectangular external cross-section.

On site
Used in steel frames, gates, canopies, roof supports and other fabricated structures requiring closed rectangular members.
Don't confuse with
Unlike a square hollow section, RHS has unequal external width and depth dimensions.

Recycled aggregate concrete

Concrete

Concrete produced using aggregates recovered from processed construction or demolition waste, replacing some or all conventional aggregates.

On site
May be used in approved structural or non-structural applications after checking aggregate quality, strength, absorption and durability requirements.
Don't confuse with
Unlike conventional concrete, it incorporates recovered aggregate material.

Recycled concrete aggregate (RCA)

Materials

Aggregate recovered by crushing and processing previously hardened concrete from demolition or construction waste.

On site
Used in approved road layers, backfill and selected concrete applications after testing grading, contamination, absorption and strength-related properties.
Don't confuse with
Unlike recycled aggregate concrete, RCA refers to the aggregate material itself rather than the finished concrete mixture.

Reduced level (RL)

Surveying

The height of a point above a chosen datum.

On site
Drawings give RLs for floors, roads and drains.

Reflected ceiling plan (RCP)

Drawings

A drawing showing ceiling features as though viewed from below and projected onto a horizontal plan.

On site
Used to position ceiling panels, light fittings, air-conditioning diffusers, access panels and other ceiling-mounted equipment.
Don't confuse with
Unlike a floor plan, an RCP focuses on the arrangement of ceiling elements.

Reflective cracking

Roads

Cracking that develops in a pavement overlay because movements at underlying joints or cracks propagate upward through the new layer.

On site
May appear after asphalt resurfacing over cracked concrete or existing asphalt pavements without adequate crack treatment.
Don't confuse with
Unlike fatigue cracking, reflective cracking commonly follows the pattern of existing underlying cracks or joints.

Reflectorless measurement

Surveying

A distance measurement method using an electronic surveying instrument without requiring a separate prism reflector at the target.

On site
Used to measure building facades, inaccessible walls, elevated structures and other suitable surfaces from a safe observation position.
Don't confuse with
Unlike prism-based measurement, reflectorless measurement uses the target surface to return the measuring signal.

Refuge area

Architecture

A designated protected space where people unable to use ordinary escape routes immediately can await assistance during an emergency.

On site
May be provided near protected staircases or other approved locations, with suitable communication and fire safety arrangements.
Don't confuse with
Unlike an assembly point outside a building, a refuge area may be located within a protected part of the building.

Reinforcement

Structural

Steel bars or mesh placed in concrete to carry tension, because concrete is weak in tension.

On site
Placed exactly as the drawing shows, tied with binding wire, with the right cover.
Site name
Nondo

Reinforcement anchorage hook

Structural

A specified bend formed at the end of a reinforcing bar to help develop its anchorage within concrete.

On site
Provided where shown in structural reinforcement details, with bend diameter, geometry and anchorage requirements checked against the applicable standard.
Don't confuse with
Unlike a straight bar termination, an anchorage hook uses a designed bend to assist force transfer.

Reinforcement bar bender

Plant

A machine used to bend reinforcing steel bars into specified angles and shapes using controlled bending mechanisms.

On site
Used to fabricate reinforcement links, hooks and shaped bars according to approved structural detailing and bending schedules.
Don't confuse with
Unlike a reinforcement bar cutter, a bar bender changes the bar's shape without cutting it.

Reinforcement bar cutter

Plant

A powered or manually operated machine designed to cut steel reinforcing bars to specified lengths.

On site
Used in reinforcement fabrication yards and construction sites to prepare bars according to approved cutting lists and bending schedules.
Don't confuse with
Unlike a reinforcement bar bender, a bar cutter shortens bars without intentionally changing their shape.

Reinforcement congestion

Structural

A condition where reinforcement bars are packed so closely that placing and compacting concrete becomes difficult.

On site
Common near heavily reinforced beam-column joints and foundation connections. Engineers check bar spacing, aggregate size and concrete placement access.
Don't confuse with
Reinforcement congestion describes insufficient working space between bars, not necessarily excessive total reinforcement.

Reinforcement rebend test

Lab testing

A test assessing reinforcement performance after a bar is bent, subjected to specified conditioning and bent again according to the relevant standard.

On site
Used in reinforcement quality control to check whether specified steel bars withstand the required bending and rebending procedure without unacceptable cracking.
Don't confuse with
Unlike an ordinary bend test, a rebend test includes a subsequent bending operation after specified conditioning.

Relative density (soil)

Geotechnical

A measure of how densely a cohesionless soil is packed compared with its loosest and densest reference states.

On site
Used to describe the packing condition of sands and assess their engineering behaviour.
Don't confuse with
Unlike dry density, relative density compares soil packing with defined loose and dense reference conditions.

Release agent

Concrete

An oil or chemical applied to formwork so concrete does not stick to it.

On site
Applied thinly before reinforcement is fixed so it does not coat the steel.

Remeasurement contract

Contracts

A construction contract where payment is calculated using measured quantities of completed work and applicable contract rates.

On site
Common in civil engineering works where actual excavation, concrete or roadwork quantities may differ from tender estimates.
Don't confuse with
Unlike a lump sum contract, the final price depends significantly on actual measured quantities.

Render

Finishes

Cement-sand plaster applied to external walls.

On site
Usually thicker and stronger than internal plaster.
Don't confuse with
Plaster, used internally.

Rendering vs pointing

Finishes

Rendering covers the whole wall with mortar; pointing only fills and finishes the joints.

On site
Pointing is used on fair-faced stone walls that will not be plastered.

Repointing

Masonry

The repair process of removing deteriorated mortar from existing masonry joints and replacing it with suitable new mortar.

On site
Performed on ageing brick and stone walls where joints have cracked, loosened or deteriorated due to weather exposure.
Don't confuse with
Unlike initial pointing during construction, repointing repairs mortar joints in existing masonry.

Request for information (RFI)

Site practice

A formal communication requesting clarification or additional information about project drawings, specifications or construction requirements.

On site
Raised when a structural drawing conflicts with an architectural drawing or a construction detail is unclear.
Don't confuse with
Unlike a site instruction, an RFI asks for clarification rather than directing a change or activity.

Request for quotation (RFQ)

Contracts

A procurement document requesting prices and related information from suppliers or contractors for clearly defined goods, services or works.

On site
Used to obtain quotations for construction materials, equipment hire or smaller works, subject to applicable procurement rules.
Don't confuse with
Unlike a full tender process, an RFQ generally involves simpler requirements and documentation.

Residual current breaker with overcurrent protection (RCBO)

Electrical

A protective device that combines residual current protection with overload and short-circuit protection in one unit.

On site
Installed in distribution boards to protect individual circuits against specified earth leakage faults, overloads and short circuits.
Don't confuse with
Unlike an RCD without overcurrent protection, an RCBO also protects against overloads and short circuits.

Respirable crystalline silica (RCS)

Health and safety

Very fine airborne particles of crystalline silica small enough to penetrate deeply into the lungs and cause serious occupational disease.

On site
Generated during cutting, drilling or grinding concrete, masonry and stone, requiring effective dust exposure controls.
Don't confuse with
Unlike ordinary visible construction dust, respirable silica particles may be too small to see.

Respirator fit test

Health and safety

A procedure used to verify that a tight-fitting respirator provides an adequate seal against the wearer's face.

On site
Performed for workers using compatible tight-fitting respiratory protection during dusty or otherwise hazardous construction activities.
Don't confuse with
Unlike a routine user seal check, a fit test formally evaluates respirator fit using a specified testing method.

Responsive tender

Contracts

A tender that satisfies the applicable material requirements, conditions and specifications of the procurement documents.

On site
Evaluators check responsiveness before considering a bid for further evaluation or award under the applicable procurement rules.
Don't confuse with
A responsive tender meets material requirements but is not necessarily the winning tender.

Retaining wall

Structural

A wall that holds back soil on one side.

On site
Needs drainage (weep holes) behind it so water pressure does not push it over.

Retarder

Materials

An admixture that slows down the setting of concrete.

On site
Useful in hot weather or for long hauls.

Retention

Contracts

A percentage of each payment held back until the work is complete and defects are fixed.

On site
Often 5 to 10%, with half released at practical completion.

Retention pond

Drainage

A stormwater management pond designed to maintain a permanent pool of water while providing additional storage for runoff.

On site
Used in larger developments to reduce runoff peaks, allow sediment settlement and improve stormwater quality.
Don't confuse with
Unlike a dry detention basin, a retention pond normally maintains a permanent water pool.

Return period

Drainage

The average interval associated with the annual probability of a specified event magnitude being equalled or exceeded.

On site
Used when selecting design rainfall or flood events, such as a 10-year or 50-year event, according to project requirements.
Don't confuse with
A 50-year return period means a 2 percent annual exceedance probability, not that flooding occurs exactly every 50 years.

Reveal

Architecture

The side surface of an opening, between the frame and the outer face of the wall.

On site
Plastered and finished square to the wall.

Revision

Drawings

An updated version of a drawing, marked with a letter or number in the title block.

On site
Always build from the latest revision and remove old copies from site.

Revision cloud

Drawings

A cloud-shaped annotation drawn around an area of a drawing that has been changed.

On site
Used when issuing revised construction drawings so site teams can quickly identify updated dimensions, notes or details.
Don't confuse with
Unlike a revision triangle, a revision cloud outlines the area affected by a change.

Revision triangle

Drawings

A triangular annotation containing a revision identifier that indicates a change made to a drawing.

On site
Placed beside modified drawing elements or revision clouds to identify the relevant revision number or letter.
Don't confuse with
Unlike a revision cloud, a revision triangle identifies the revision rather than outlining the changed area.

Rib

Structural

A narrow beam-like strip in a ribbed or hollow pot slab.

On site
Contains the main bottom bars of the slab.

Ridge

Roofing

The top horizontal line of a pitched roof where two slopes meet.

On site
Covered with ridge capping to keep water out.

Ridge beam

Roofing

A structural beam located along the highest line of a pitched roof, supporting the upper ends of opposing rafters.

On site
Used where roof design requires structural support at the ridge, with loads transferred to supporting walls, columns or other members.
Don't confuse with
Unlike a non-structural ridge board, a ridge beam is designed to carry roof loads.

Ridge capping

Roofing

The folded sheet or tile that covers the ridge.

On site
Ordered by length along the ridge.

Ridge vent

Roofing

A ventilation opening installed along the highest part of a pitched roof to allow warm or moist air to escape.

On site
Used in suitable ventilated roof systems, often together with lower-level air inlets to create airflow through the roof space.
Don't confuse with
Unlike a soffit vent, a ridge vent provides high-level ventilation near the roof peak.

Rigid pavement

Roads

A pavement system that uses a concrete slab to carry and distribute traffic loads through its bending stiffness.

On site
Used in selected highways, industrial yards, bus terminals and heavily loaded areas where concrete pavement is suitable.
Don't confuse with
Unlike flexible pavement, rigid pavement relies mainly on the structural stiffness of a concrete slab.

Rim joist

Steel and timber

A timber framing member installed around the perimeter of a joisted floor to close and support the joist ends.

On site
Used in timber floor construction to tie floor framing together and provide support for edge detailing.
Don't confuse with
Unlike ordinary floor joists, rim joists generally run around the floor perimeter.

Ring and ball softening point test

Lab testing

A test that determines the temperature at which bituminous material softens sufficiently for a standard steel ball to cause a specified displacement.

On site
Used in quality control of paving binders and modified bituminous materials to assess their temperature-dependent consistency.
Don't confuse with
Unlike penetration testing, this test reports a softening temperature rather than needle penetration depth.

Ring beam

Structural

A continuous reinforced concrete beam around the top of the walls.

On site
Ties the walls together and spreads roof loads. Often at lintel or roof level.
Don't confuse with
Lintel, which only spans one opening.

Ring circuit

Electrical

A socket circuit wired in a loop that starts and ends at the distribution board.

On site
Common in BS-based installations such as those in Kenya.
Don't confuse with
Radial circuit, which runs out and ends at the last outlet.

Ripping

Earthworks

Mechanical breaking and loosening of hard soil, compacted ground or weathered rock using strong teeth attached to heavy equipment.

On site
A bulldozer fitted with a ripper may loosen hard ground before excavation by an excavator or loading equipment.
Don't confuse with
Unlike shallow scarification, ripping commonly penetrates deeper or harder ground.

Rise and fall method

Surveying

A levelling calculation method that determines elevation changes between successive points from differences in staff readings.

On site
Used in levelling field books to calculate reduced levels and check the consistency of observations.
Don't confuse with
Unlike the height of collimation method, it calculates individual rises and falls between consecutive surveyed points.

Riser

Architecture

The vertical part of a stair step.

On site
All risers in a flight must be equal. A typical riser is 150 to 175 mm.
Don't confuse with
Tread, the flat part you step on.

Rising main (water supply)

Plumbing

A pipe carrying water upward or under pressure from a pump or supply point to a higher-level storage or distribution system.

On site
Used to pump water from underground storage tanks to rooftop tanks in multi-storey buildings.
Don't confuse with
Unlike a gravity downfeed pipe, a pumped rising main carries water using pump pressure.

Risk assessment

Site practice

Identifying hazards, judging the risks and setting controls before work starts.

On site
Required by health and safety law.

Road marking

Roads

A line, symbol or message applied to a road surface to regulate, warn or guide road users.

On site
Includes centre lines, lane markings, pedestrian crossings, stop lines and directional arrows on Kenyan roads.
Don't confuse with
Unlike a traffic sign, a road marking communicates information directly from the pavement surface.

Road reserve

Roads

The full strip of land set aside for a road, including space for future widening, drains and services.

On site
Buildings and fences must stay outside the road reserve.

Road verge

Roads

The strip of land beside the carriageway or shoulder, often covered with grass or other suitable ground treatment.

On site
May accommodate road signs, drainage features, utility services and landscaping outside the main traffic area.
Don't confuse with
Unlike a road shoulder, the verge is not ordinarily intended to support vehicle stopping or travel.

Rock excavation

Earthworks

Removal of rock material that requires suitable breaking, cutting or specialised excavation methods.

On site
Encountered when foundation excavations reach hard rock. Contractors may use hydraulic breakers, rock saws or controlled blasting where permitted.
Don't confuse with
Unlike ordinary soil excavation, rock excavation may require specialised breaking equipment.

Roller

Plant

A heavy machine with drums or tyres used to compact soil and asphalt.

On site
Smooth, padfoot and pneumatic rollers suit different materials.

Roller-compacted concrete (RCC)

Concrete

A stiff, low-slump concrete mixture placed using paving or earthmoving equipment and compacted with rollers.

On site
Used in some industrial pavements, heavy-duty yards and dam construction projects where large volumes require efficient placement.
Don't confuse with
Unlike conventional vibrated concrete, RCC is compacted using rollers rather than immersion vibrators.

Roof access hatch

Roofing

A closable opening in a roof designed to provide controlled access for inspection, maintenance or other authorised activities.

On site
Installed on suitable flat roofs where maintenance workers need access to water tanks, solar equipment or rooftop services.
Don't confuse with
Unlike a rooflight, an access hatch is primarily intended for entry rather than daylight.

Roof batten

Roofing

A narrow timber or metal member fixed across roof supports to provide attachment points for roof coverings.

On site
Installed at specified spacing to support roofing tiles or sheets, depending on the roofing system.
Don't confuse with
Unlike a purlin, a roof batten is generally smaller and directly supports the roof covering.

Roof cricket

Roofing

A small raised, sloping roof feature designed to divert rainwater around an obstruction or towards a drainage outlet.

On site
Constructed behind wide chimneys, rooftop equipment or other obstructions where water could otherwise accumulate.
Don't confuse with
Unlike a roof valley, a cricket redirects water away from an obstruction.

Roof pitch

Roofing

The steepness of a roof, given in degrees or as a ratio.

On site
Each roofing material has a minimum pitch.

Roof ponding

Roofing

The accumulation of standing water on a roof surface caused by inadequate drainage, insufficient falls or local depressions.

On site
Checked on flat roofs after rainfall, particularly where blocked outlets or structural deflection prevent water from draining properly.
Don't confuse with
Unlike normal temporary rainwater runoff, roof ponding involves water remaining in localised areas.

Roof scupper

Roofing

An opening through a roof edge or parapet that allows accumulated rainwater to discharge from the roof.

On site
Used on flat and low-slope roofs, sometimes connected to external downpipes or provided as an emergency overflow.
Don't confuse with
Unlike a conventional roof drain, a scupper discharges water through the roof edge or parapet.

Roof underlay

Roofing

A protective sheet or membrane installed beneath the main roof covering to provide secondary protection against water and wind-driven rain.

On site
Laid beneath roofing tiles or sheets, with overlaps and drainage arrangements installed according to the manufacturer's specifications.
Don't confuse with
Unlike the main roof covering, underlay provides a secondary protective layer.

Room data sheet

Drawings

A document recording the functional, architectural and service requirements of an individual room.

On site
Used in hospitals, schools and commercial buildings to coordinate room dimensions, finishes, equipment, lighting and service requirements.
Don't confuse with
Unlike a finishes schedule, a room data sheet can describe the complete functional and technical requirements of a room.

Rotational slope failure

Geotechnical

A slope failure where a mass of soil moves downward and outward along a curved failure surface.

On site
Commonly investigated in cohesive soil slopes, road cuttings and embankments showing curved tension cracks or displaced ground.
Don't confuse with
Unlike translational failure, rotational failure involves movement along a curved surface.

Rotational viscosity test (bitumen)

Lab testing

A test measuring bitumen resistance to flow using a rotating spindle or similar device at a controlled temperature.

On site
Used to assess binder handling characteristics and establish suitable mixing or compaction temperatures where the relevant specification permits.
Don't confuse with
Unlike penetration testing, rotational viscosity measures resistance to flow under controlled rotational conditions.

Rowlock course

Masonry

A course of bricks laid on edge with their short ends visible on the wall face.

On site
Used in suitable brick sills, wall cappings and decorative masonry details where the specified arrangement is required.
Don't confuse with
Unlike a soldier course, a rowlock course places bricks on edge with their short ends exposed.

Rubble masonry

Masonry

Stone masonry constructed using irregularly shaped or roughly dressed stones arranged with suitable mortar or approved dry construction methods.

On site
Used in selected boundary walls, landscaping works and retaining structures, depending on the structural design and available stone.
Don't confuse with
Unlike ashlar masonry, rubble masonry uses stones with less regular shapes and finishes.

Rumble strip

Roads

A series of raised or recessed road surface features that produce vibration and sound when driven over.

On site
Installed near hazards, road edges or selected approaches to alert drivers through vibration and noise.
Don't confuse with
Unlike a speed hump, a rumble strip mainly provides a warning rather than a substantial vertical deflection.

Running bond

Masonry

A masonry bonding pattern where successive courses are staggered so vertical joints do not align.

On site
Common in Kenyan machine-cut stone and concrete block walls, where units are laid with overlapping vertical joints.
Don't confuse with
Unlike stack bond, running bond staggers vertical joints between successive courses.

Runoff coefficient

Drainage

A dimensionless factor representing the proportion of rainfall contributing to runoff under specified catchment and calculation conditions.

On site
Selected according to land cover, soil and drainage conditions when estimating stormwater peak flows from roofs, roads and developed land.
Don't confuse with
Unlike rainfall intensity, the runoff coefficient describes the assumed runoff response of a catchment.

Rutting

Roads

Permanent longitudinal depressions formed in pavement wheel paths due to repeated traffic loading and deformation.

On site
Observed on asphalt roads carrying heavy vehicles, especially where pavement layers lack sufficient resistance to permanent deformation.
Don't confuse with
Unlike potholes, rutting usually develops as continuous depressions along vehicle wheel paths.

S

Safety data sheet (SDS)

Health and safety

A standardised document providing information about a chemical product's hazards, safe handling, storage, protective measures and emergency response.

On site
Consulted before using paints, solvents, adhesives, fuels and other hazardous chemical products on construction sites.
Don't confuse with
Unlike a product technical datasheet, an SDS primarily communicates chemical hazards and safety precautions.

Safety net system

Health and safety

An engineered net and supporting arrangement designed to catch falling people or materials, depending on the specified system.

On site
Installed beneath suitable elevated construction activities where a certified fall-catching system forms part of the safety arrangements.
Don't confuse with
Unlike a guardrail, a personnel safety net protects by catching a fall rather than preventing access to an edge.

Sagging

Structural

Bending that makes a member curve downward like a smile, putting the bottom in tension.

On site
Normal at mid-span. Needs bottom steel.

Sample approval

Site practice

The review and acceptance of a representative material or product sample against specified project requirements.

On site
Architects or consultants review proposed tiles, paint colours, door hardware and other finishes before bulk installation.
Don't confuse with
Unlike a mock-up panel, a sample approval may involve an individual material or product rather than a complete installed assembly.

Sand equivalent test

Lab testing

A test that estimates the relative proportion of sand-sized particles to clay-like fines in fine aggregate or granular material.

On site
Used when checking sand and road construction aggregates. A higher sand equivalent value generally indicates a lower proportion of clay-like fines.
Don't confuse with
Unlike sieve analysis, this test assesses clay-like fines relative to sand rather than overall particle size distribution.

Sawtooth roof

Roofing

A roof consisting of repeated sloping surfaces and steeper glazed or vertical faces, creating a sawtooth profile.

On site
Used in factories, workshops and industrial buildings to admit natural daylight through high-level glazing.
Don't confuse with
Unlike a conventional pitched roof, a sawtooth roof contains repeated roof sections with alternating slopes.

Scaffold

Plant

A temporary platform structure that gives workers safe access at height.

On site
Must be braced, tied and inspected before use.

Scaffold inspection tag

Health and safety

A visible identification tag used to communicate the recorded inspection or access status of a scaffold.

On site
Displayed at designated scaffold access points following inspection, with workers checking the current authorisation before use.
Don't confuse with
Unlike an inspection report, the tag provides a brief visual status rather than the full inspection record.

Scarf joint

Steel and timber

A joint used to connect two timber lengths end to end through shaped overlapping or interlocking surfaces.

On site
Used when extending suitable timber members, with joint geometry and fixings selected for the required structural performance.
Don't confuse with
Unlike a simple butt joint, a scarf joint provides an extended contact or interlocking region.

Scarification

Earthworks

Mechanical loosening of the upper soil or compacted material surface to a specified depth.

On site
Performed before moisture adjustment, recompaction or placing additional fill to improve bonding between successive layers.
Don't confuse with
Unlike ripping, scarification generally involves relatively shallow loosening of the surface.

Schedule of rates

Contracts

A document listing construction work descriptions together with their corresponding unit prices.

On site
Used to value measured works, maintenance activities and applicable contract changes according to agreed rates.
Don't confuse with
Unlike a BOQ, a schedule of rates does not necessarily include estimated quantities for every item.

Scissor lift

Plant

A mobile elevating work platform that raises workers and equipment vertically using a linked, folding support mechanism.

On site
Used during ceiling installation, electrical work, painting and building maintenance where safe elevated access is required.
Don't confuse with
Unlike an articulated boom lift, a conventional scissor lift provides primarily vertical platform movement.

Scour protection

Bridges

Measures installed to reduce erosion of soil or riverbed material around bridge foundations and supporting structures.

On site
May include properly designed rock riprap, mattresses or other protective systems around piers and abutments.
Don't confuse with
Bridge scour is the erosion process, while scour protection comprises measures intended to control it.

Screed

Finishes

A thin layer of cement-sand mortar laid on a slab to give a level, smooth base for floor finishes.

On site
Usually 25 to 50 mm thick, laid to level or to falls.
Don't confuse with
Plaster, which is applied to walls and ceilings.

Screed rail

Concrete

A straight guide installed at a specified level to control the height and flatness of concrete during screeding.

On site
Set across slab areas before concrete placement so workers can strike off fresh concrete to the required level.
Don't confuse with
Unlike the finished screed surface, a screed rail is a guide used during levelling.

Second-order effects (P-Delta)

Structural

Additional moments and forces caused when existing axial loads act through the displaced shape of a structure.

On site
In slender columns and sway frames, engineers consider these effects because lateral movement can increase bending moments and instability risks.
Don't confuse with
First-order analysis uses the original geometry, while second-order analysis accounts for deformation effects.

Section

Drawings

A drawing showing a building or element as if cut through vertically.

On site
Shows heights, floor build-ups, foundations and roof construction.
Don't confuse with
Elevation, which shows the outside face without cutting.

Section marker

Drawings

A drawing symbol indicating where a section is taken and the direction from which the resulting view is observed.

On site
Shown on plans with arrows and reference labels that guide readers to the corresponding sectional drawing.
Don't confuse with
Unlike an elevation marker, a section marker identifies a cutting plane through the structure.

Sediment basin

Earthworks

A temporary or permanent basin designed to collect sediment-laden runoff and allow suspended soil particles to settle.

On site
Constructed on large earthworks sites to reduce sediment discharge into nearby drains, streams and watercourses.
Don't confuse with
Unlike a silt fence, a sediment basin holds runoff temporarily to allow sediment to settle.

Segmental bridge

Bridges

A bridge constructed from individual structural segments that are connected to form a continuous supporting system.

On site
Common in elevated highways and long-span bridges, using precast or cast-in-place segments joined with suitable prestressing and connections.
Don't confuse with
Unlike a monolithic cast-in-place bridge, a segmental bridge is assembled progressively from separate sections.

Segregation

Concrete

Separation of coarse aggregate from the mortar in fresh concrete.

On site
Caused by dropping concrete from too high or over-vibrating. Leads to weak, honeycombed areas.

Seismic detailing

Structural

Special reinforcement and connection detailing intended to improve a structure's behaviour during earthquake loading.

On site
May include closely spaced confinement reinforcement, appropriate anchorage, controlled splice locations and carefully detailed beam-column joints.
Don't confuse with
Seismic detailing addresses earthquake deformation demands beyond ordinary gravity-load detailing.

Seismic load

Structural

The forces generated within a structure due to ground acceleration during an earthquake.

On site
Where required by seismic design provisions, engineers assess earthquake effects on frames, foundations, walls and structural connections.
Don't confuse with
Unlike wind load, seismic loading mainly results from the structure's mass responding to ground motion.

Selected fill

Earthworks

Excavated or imported soil material chosen because it meets specified requirements for use in particular filling operations.

On site
Used around foundations, beneath slabs and within engineered embankments where grading, plasticity and compaction requirements must be satisfied.
Don't confuse with
Unlike general fill, selected fill must meet additional specified material quality requirements.

Self-cleansing velocity

Drainage

A flow velocity sufficient to help prevent excessive deposition of sediment and solids inside a drainage pipe or channel.

On site
Checked when designing gravity sewers to reduce sediment accumulation and the frequency of pipe blockages.
Don't confuse with
Unlike maximum allowable velocity, self-cleansing velocity concerns avoiding sediment deposition rather than preventing erosion.

Self-compacting concrete (SCC)

Concrete

Highly flowable concrete that spreads and fills formwork under its own weight without requiring mechanical vibration.

On site
Used in heavily reinforced columns, walls and complex formwork where inserting a concrete vibrator is difficult.
Don't confuse with
Unlike conventional concrete, SCC is designed to flow and compact without vibration.

Self-levelling compound

Finishes

A flowable flooring material used to form a relatively smooth, level or uniformly graded surface over a prepared substrate.

On site
Applied before vinyl, laminate or other floor coverings to correct minor unevenness in suitable concrete floors.
Don't confuse with
Unlike conventional sand-cement screed, self-levelling compound flows more readily and is often applied in thinner layers.

Separate sewer system

Drainage

A drainage arrangement that uses separate networks for wastewater and stormwater runoff.

On site
Common in modern development designs where foul sewage is directed to wastewater treatment and stormwater follows a separate drainage route.
Don't confuse with
Unlike a combined sewer, separate systems do not intentionally mix stormwater with foul sewage.

Septic tank

Drainage

An underground tank where sewage settles and is partly broken down before the liquid flows to a soak pit.

On site
Used where there is no public sewer. Must be desludged periodically.

Serviceability limit state (SLS)

Structural

The design condition for performance in use: deflection, cracking and vibration.

On site
Uses unfactored loads.

Setback

Architecture

The minimum distance a building must be kept from a plot boundary.

On site
Set by planning rules and checked during approval.

Setting out

Surveying

Marking the exact positions of a building on the ground using pegs, profiles and lines.

On site
Always check diagonals. Equal diagonals mean the corners are square.

Settlement

Geotechnical

Downward movement of a structure as the ground below it compresses.

On site
Uneven settlement causes cracks.

Sewer surcharge

Drainage

A condition where water pressure causes the hydraulic level in a sewer to rise above the pipe crown.

On site
May occur during heavy rainfall, downstream blockages or excessive inflow, potentially causing water levels to rise in manholes.
Don't confuse with
Unlike ordinary gravity flow with a free surface, surcharged flow places the sewer under pressure.

Shear centre

Structural

The point in a cross-section through which a transverse force can act without causing twisting of the member.

On site
Important when designing channels, angles and other unsymmetrical steel sections that may twist under transverse loading.
Don't confuse with
Unlike the centroid, the shear centre is defined by the absence of twisting under transverse shear loading.

Shear failure

Structural

Structural failure that occurs when the applied shear demand exceeds the available shear resistance.

On site
May develop in beams, walls or connections, sometimes with diagonal cracking and rapid loss of resistance.
Don't confuse with
Unlike flexural failure, shear failure may occur suddenly without significant bending deformation.

Shear force

Structural

The internal force that tries to slide one part of a member past the next.

On site
Highest near supports, which is why links are placed closer together there.

Shear force diagram (SFD)

Structural

A graph showing how shear force varies along a beam.

On site
Where the shear is zero, the bending moment is at its maximum.

Shear key

Structural

A shaped projection or recess designed to transfer shear forces across a joint or interface between structural elements.

On site
Found in precast concrete connections, some construction joints and foundation interfaces where resistance to relative sliding is required.
Don't confuse with
Unlike a smooth joint interface, a shear key provides mechanical interlocking between connected elements.

Shear lag

Structural

Non-uniform distribution of longitudinal stress across a wide flange or plate because shear transfer causes different regions to deform differently.

On site
Considered when analysing wide flange beams, box girders and certain steel connections where the full width may not carry stress uniformly.
Don't confuse with
Unlike uniform axial stress, shear lag causes different stress levels across the same section.

Shear stud rail

Structural

A manufactured assembly of headed steel studs arranged to provide punching shear reinforcement within a concrete slab.

On site
Installed around columns in flat slabs where calculated punching shear resistance exceeds the capacity provided by concrete alone.
Don't confuse with
Unlike ordinary slab reinforcement, shear stud rails are specifically arranged to resist punching shear.

Shear wall

Structural

A stiff wall, usually reinforced concrete, that resists sideways loads from wind or earthquakes.

On site
Often placed around lift and stair cores.

Shell structure

Structural

A thin, usually curved structural surface that carries loads through a combination of membrane forces and bending.

On site
Found in domes, curved roofs, tanks and other structures where geometry helps distribute forces efficiently.
Don't confuse with
Unlike a conventional flat slab, a shell uses its curved geometry to develop significant membrane action.

Shop drawing

Drawings

A detailed drawing prepared by a contractor, supplier or specialist showing how specific building components will be manufactured or installed.

On site
Submitted for review before fabrication or installation of items such as steelwork, aluminium windows, ductwork and reinforcement assemblies.
Don't confuse with
Unlike a design drawing, a shop drawing provides detailed production or installation information.

Shoring

Earthworks

Temporary supports that hold up the sides of an excavation.

On site
Needed in deep or unstable trenches to protect workers.

Shotcrete

Concrete

Concrete or mortar pneumatically projected at high velocity onto a prepared surface through a hose and nozzle.

On site
Used for stabilising excavation faces, tunnel linings, slope protection and repairing damaged concrete surfaces.
Don't confuse with
Unlike conventional poured concrete, shotcrete is applied by spraying under pressure.

Shoulder

Roads

The strip beside the carriageway for stopped vehicles and lateral support of the pavement.

On site
Built with a slightly steeper crossfall than the carriageway.

Shoulder drop-off

Roads

A height difference where the road shoulder lies noticeably below the adjacent carriageway surface.

On site
May develop through shoulder erosion, settlement or repeated resurfacing, creating a hazard when vehicles leave or re-enter the carriageway.
Don't confuse with
Unlike edge break, shoulder drop-off describes a difference in surface elevation rather than pavement edge material loss.

Shrinkage limit test

Lab testing

A soil test that determines the water content below which further drying produces little or no additional volume reduction.

On site
Used when investigating fine-grained soils that may shrink significantly during drying, helping engineers understand potential volume change.
Don't confuse with
Unlike plastic limit, shrinkage limit concerns the point where further moisture loss no longer significantly reduces soil volume.

Shrinkage-compensating concrete

Concrete

Concrete designed to undergo controlled early expansion that helps offset some subsequent drying shrinkage.

On site
Used in selected slabs, repair works and restrained concrete elements where reducing shrinkage-related cracking is important.
Don't confuse with
Unlike ordinary concrete, shrinkage-compensating concrete uses controlled expansion to offset part of its shrinkage.

Sieve analysis

Lab testing

A lab test that passes aggregate through a stack of sieves to find its particle size distribution (grading).

On site
Used to check if sand or ballast meets the specification.

Silica fume

Materials

An extremely fine, silica-rich material collected during silicon or ferrosilicon alloy production and used as a supplementary cementitious material.

On site
Added to specialised concrete mixes to improve density, strength and resistance to certain forms of deterioration.
Don't confuse with
Unlike fly ash, silica fume is generally much finer and highly reactive.

Silicone sealant

Materials

A flexible sealing material based on silicone polymers, commonly used to resist moisture and accommodate limited joint movement.

On site
Applied around windows, sanitary fixtures, glazing and selected building joints using a grade suitable for the application.
Don't confuse with
Unlike cement mortar, silicone sealant remains flexible after curing.

Sill

Architecture

The horizontal bottom part of a window opening.

On site
Sloped outward so rain runs off.

Silt content test

Lab testing

A simple test to find how much fine silt and clay is in sand.

On site
Shake sand and salty water in a jar and measure the silt layer after settling. Too much silt weakens concrete and plaster.

Silt fence

Earthworks

A temporary sediment control barrier made from permeable fabric supported by posts.

On site
Installed downhill of disturbed construction areas to slow shallow runoff and trap sediment before it leaves the site.
Don't confuse with
Unlike a catch drain, a silt fence filters sediment from shallow runoff rather than primarily conveying water.

Simply supported beam

Structural

A beam resting on supports at both ends that can rotate freely.

On site
Maximum moment is at mid-span: wL²/8 for a UDL.

Single-line diagram

Electrical

A simplified drawing of an electrical system using single lines and symbols.

On site
Shows how supply, boards and circuits connect.

Single-phase supply

Electrical

An alternating-current electrical supply using one phase, normally with a neutral conductor in typical building installations.

On site
Common in Kenyan residential buildings for lighting, socket outlets and suitable domestic appliances.
Don't confuse with
Unlike a three-phase supply, a single-phase supply uses one alternating-current phase.

Singly reinforced beam

Structural

A reinforced concrete beam designed with longitudinal reinforcement primarily on its tension side, without relying on compression steel for bending resistance.

On site
Common in simply supported beams where the main bottom reinforcement resists tensile forces caused by positive bending moments.
Don't confuse with
Unlike a doubly reinforced beam, compression reinforcement is not included in its calculated flexural resistance.

Site access control

Site practice

A system for controlling and monitoring who or what enters and leaves a construction site.

On site
Security personnel check worker identification, visitor authorisation and vehicle movements at designated site entrances.
Don't confuse with
Unlike a visitor register, site access control includes the wider procedures for authorising and restricting entry.

Site agent (site manager)

Site practice

The contractor's person in charge of the site day to day.

On site
Coordinates labour, materials, subcontractors and safety.

Site clearance

Earthworks

Removing vegetation, debris and obstructions before work starts.

On site
Usually the first BOQ item in earthworks.

Site diary

Site practice

A daily record of weather, labour, plant, deliveries, work done and incidents on site.

On site
Very useful evidence in disputes and claims.

Site handover

Site practice

The formal process of transferring possession, access or responsibility for a construction site or designated working area.

On site
The employer may hand over the project site to the contractor, with access conditions and existing site features recorded.
Don't confuse with
Unlike practical completion, site handover commonly occurs before construction work begins.

Site induction

Site practice

An introductory briefing given to workers and visitors before they enter or begin activities on a construction site.

On site
New workers learn site rules, reporting procedures, emergency arrangements, restricted areas and their responsibilities before starting work.
Don't confuse with
Unlike a toolbox talk, site induction introduces the overall site requirements rather than focusing on a particular activity.

Site instruction

Contracts

A written instruction from the engineer or architect to the contractor on site.

On site
Record every instruction. Verbal instructions should be confirmed in writing.

Site logistics plan

Site practice

A plan showing how materials, equipment, workers and vehicles will move through and operate within a construction site.

On site
Identifies delivery routes, storage areas, loading zones, equipment positions and site access arrangements.
Don't confuse with
Unlike a general site plan, a logistics plan focuses on construction movement, deliveries and operational arrangements.

Site meeting

Site practice

A regular meeting of the client, consultants and contractor to review progress and issues.

On site
Minutes are taken and circulated.

Site plan

Drawings

A drawing showing the building on its plot with boundaries, access, drainage and services.

On site
Used for approvals and for setting out.

Site stores

Site practice

A designated facility or area where construction materials, tools and equipment are stored and managed.

On site
Storekeepers control access, arrange materials, maintain inventory records and protect items against theft, damage and weather.
Don't confuse with
Unlike a laydown area, site stores generally provide controlled storage for materials and equipment.

Skid resistance

Roads

The ability of a pavement surface to provide friction between vehicle tyres and the road under specified conditions.

On site
Measured during pavement condition assessments, particularly at bends, junctions and locations with higher braking demands.
Don't confuse with
Unlike texture depth, skid resistance measures frictional performance rather than surface roughness geometry.

Skid-steer loader

Plant

A compact construction machine that turns by varying wheel or track speeds on opposite sides and accepts different working attachments.

On site
Used for loading materials, clearing debris, grading small areas and working in confined building sites.
Don't confuse with
Unlike a conventional wheel loader, a skid-steer loader can turn within a much smaller space.

Skim coat

Finishes

A thin finishing layer applied over plaster, concrete or other suitable surfaces to produce a smooth, even surface.

On site
Applied to internal walls and ceilings before painting to cover minor surface imperfections and improve the final appearance.
Don't confuse with
Unlike ordinary plaster, a skim coat is generally thinner and intended for final surface smoothing.

Skirting

Finishes

A strip of tile, timber or other material along the bottom of an internal wall.

On site
Protects the wall and covers the joint with the floor.

Slab

Structural

A flat horizontal concrete element forming a floor or roof.

On site
One-way slabs span in one direction; two-way slabs span in both.

Slenderness ratio

Structural

The effective height of a column divided by its least lateral dimension.

On site
Slender columns can buckle, so they need extra checks.

Slip circle

Geotechnical

An assumed circular failure surface used to analyse the stability of certain soil slopes.

On site
Engineers examine possible slip circles when assessing embankments, cut slopes and earth dams using limit equilibrium methods.
Don't confuse with
Unlike a planar slip surface, a slip circle represents a curved failure surface.

Slip-resistant bolted connection

Steel and timber

A structural connection designed to resist relative movement between connected steel plates through friction generated by bolt preload.

On site
Used in specified bridge and structural steel connections where slip under particular design loads must be controlled.
Don't confuse with
Unlike a bearing-type bolted connection, it resists the specified shear loading through friction before slip.

Slope distance

Surveying

The straight-line distance measured between two points along an inclined line.

On site
Measured by total stations on uneven ground and converted into horizontal distance for setting out and coordinate calculations.
Don't confuse with
Unlike horizontal distance, slope distance includes the effect of elevation difference.

Slot drain

Drainage

A linear drainage system that collects surface water through a narrow continuous opening connected to a concealed channel.

On site
Used in paved walkways, courtyards and architectural landscapes where a discreet drainage opening is preferred.
Don't confuse with
Unlike a conventional grated trench drain, a slot drain has a narrow surface opening instead of a wide grate.

Slump flow test

Concrete

A test that measures the horizontal spread of highly flowable concrete after a standard slump cone is lifted.

On site
Commonly performed on self-compacting concrete to assess filling ability and consistency before placement into congested formwork.
Don't confuse with
Unlike the conventional slump test, slump flow measures horizontal spread rather than vertical settlement.

Slump test

Lab testing

A site test that measures the workability of fresh concrete using a cone.

On site
Done before each pour. A high slump means a wetter mix.
Don't confuse with
Cube test, which measures strength after curing.

Slurry seal

Roads

A thin pavement maintenance treatment made from asphalt emulsion, fine aggregate, mineral filler and water.

On site
Applied to suitable existing roads to seal minor surface defects and improve surface texture without significantly strengthening the pavement.
Don't confuse with
Unlike a structural asphalt overlay, slurry seal is mainly a surface preservation treatment.

Snag list (punch list)

Site practice

A list of small defects to be fixed before handover.

On site
Prepared during the final inspection.

Soakaway (soak pit)

Drainage

An underground pit that lets treated waste water or rainwater soak into the ground.

On site
Used with septic tanks where there is no sewer. Size depends on how permeable the soil is.

Soffit

Architecture

The underside of a structural element such as a slab, beam or roof overhang.

On site
Soffit formwork supports the bottom of a slab or beam during casting.

Soffit vent

Roofing

A ventilation opening installed in the underside of roof eaves to allow outside air into a ventilated roof space.

On site
Used along suitable roof eaves to provide low-level airflow, commonly working together with ridge vents.
Don't confuse with
Unlike a ridge vent, a soffit vent is positioned near the lower edge of the roof.

Soft storey

Structural

A building storey with substantially lower lateral stiffness than adjacent storeys, making it more vulnerable to concentrated lateral deformation.

On site
Can occur where an open ground-floor parking area has fewer walls or bracing elements than the floors above.
Don't confuse with
A soft storey concerns reduced stiffness, while a weak storey concerns reduced lateral strength.

Soil dilatancy

Geotechnical

The tendency of dense granular soil to increase in volume when subjected to shear deformation.

On site
Important in evaluating the behaviour of dense sand beneath foundations and within earth-retaining structures.
Don't confuse with
Unlike contraction, dilatancy involves an increase in soil volume during shearing.

Soil investigation

Geotechnical

Tests and boreholes or trial pits to find soil layers, strength and groundwater.

On site
The basis for foundation design.

Soil nailing

Geotechnical

A ground reinforcement technique involving installation of closely spaced reinforcing elements into an existing soil mass to improve stability.

On site
Used to stabilise excavations and steep soil slopes, commonly with facing systems such as reinforced shotcrete.
Don't confuse with
Unlike prestressed ground anchors, soil nails generally develop resistance passively as the ground deforms.

Soil pipe

Plumbing

A pipe that carries waste from toilets.

On site
Larger in diameter (often 100 mm) and must be vented.
Don't confuse with
Waste pipe, which carries water from sinks, basins and showers.

Soil sensitivity

Geotechnical

The ratio of undisturbed undrained shear strength to remoulded undrained shear strength at the same water content.

On site
Important when investigating sensitive clays that may lose substantial strength after excavation, vibration or disturbance.
Don't confuse with
Unlike ordinary strength measurements, sensitivity indicates how much strength is lost through remoulding.

Soil stabiliser

Plant

A construction machine that pulverises and mixes existing soil with specified stabilising agents to improve its engineering properties.

On site
Used in road construction when improving subgrade or pavement layers with cement, lime or other approved additives.
Don't confuse with
Unlike a grader, a soil stabiliser mechanically mixes material through a significant working depth.

Solar charge controller

Electrical

An electronic device that regulates charging power from solar panels to compatible batteries.

On site
Installed in suitable off-grid solar systems to manage battery charging and protect against specified charging conditions.
Don't confuse with
Unlike a solar inverter, a charge controller primarily manages battery charging rather than producing AC power.

Solar combiner box

Electrical

An electrical enclosure that combines outputs from multiple photovoltaic strings and may contain suitable protective and isolating devices.

On site
Used in larger solar installations to organise PV string connections before power reaches an inverter or other equipment.
Don't confuse with
Unlike a conventional AC distribution board, a solar combiner box generally handles DC circuits from photovoltaic strings.

Solar inverter

Electrical

An electrical device that converts direct-current electricity from solar panels or batteries into alternating-current electricity.

On site
Installed in grid-connected, hybrid and suitable off-grid solar systems to supply AC electrical loads.
Don't confuse with
Unlike a solar charge controller, an inverter primarily converts DC electricity into AC electricity.

Solar photovoltaic (PV) module

Electrical

An assembly of connected photovoltaic cells that converts sunlight directly into direct-current electrical energy.

On site
Mounted on suitable roofs or ground structures to generate electricity for buildings, solar pumping installations and other applications.
Don't confuse with
Unlike a solar thermal collector, a PV module generates electricity rather than primarily heating water.

Soldier course

Masonry

A course of bricks laid vertically on end, with their longer dimensions standing upright.

On site
Used above openings, around wall features and in decorative exposed brickwork, with suitable structural support where needed.
Don't confuse with
Unlike a conventional stretcher course, a soldier course positions bricks vertically.

Sole plate (timber framing)

Steel and timber

A horizontal timber member forming the bottom of a framed wall and supporting its vertical studs.

On site
Fixed to a suitable floor or supporting structure before wall studs are installed, with moisture protection and anchorage as required.
Don't confuse with
Unlike a top plate, a sole plate is positioned at the bottom of a timber-framed wall.

Solvent-weld joint

Plumbing

A joint formed when suitable solvent cement chemically softens compatible plastic pipe and fitting surfaces, allowing them to bond together.

On site
Commonly used for compatible PVC and uPVC drainage or water supply pipes according to the manufacturer's instructions.
Don't confuse with
Unlike a threaded joint, a solvent-weld joint forms a permanent chemical bond between compatible plastic surfaces.

Sorptivity test

Lab testing

A test that measures the rate at which a porous material absorbs water through capillary action.

On site
Used to assess concrete surface absorption and compare durability-related properties of different mixes or curing conditions.
Don't confuse with
Unlike pressure-driven permeability testing, sorptivity measures water uptake primarily through capillary suction.

Space frame

Structural

A three-dimensional structural framework of interconnected members that transfers loads through a spatial arrangement.

On site
Used for stadium roofs, airport terminals, large halls and other structures requiring broad areas without intermediate supports.
Don't confuse with
Unlike a planar truss, a space frame carries loads through a three-dimensional arrangement.

Space planning

Architecture

The organisation of rooms, circulation routes, furniture and functional areas within a building to meet user requirements.

On site
Architects prepare layouts showing bedrooms, kitchens, offices, corridors and other spaces before developing detailed construction drawings.
Don't confuse with
Unlike structural planning, space planning primarily focuses on functional building layout and user movement.

Spacer (cover block)

Structural

A small concrete, plastic or steel block that holds reinforcement at the correct distance from the formwork.

On site
Placed regularly under and beside the bars before casting.

Span-to-depth ratio

Structural

The ratio between a structural member's span and its depth, used as an indicator of its relative slenderness.

On site
Engineers use span-to-effective-depth checks during preliminary reinforced concrete beam and slab design to help control deflection.
Don't confuse with
Unlike slenderness ratio for compression members, span-to-depth ratio commonly helps assess bending member proportions and deflection.

Spandrel beam

Structural

A beam located along the external perimeter of a building, often supporting edge walls, cladding or floor loads.

On site
Found along building facades between columns, especially where external masonry walls or facade elements require structural support.
Don't confuse with
An ordinary internal beam supports floor loads within the building, while a spandrel beam is located along the perimeter.

Specific gravity

Lab testing

The ratio of the density of a material to the density of water.

On site
Used in mix design and soil calculations.

Specification

Contracts

A written document describing the quality of materials and workmanship required.

On site
Read together with the drawings. Where they disagree, ask the engineer.

Speed hump

Roads

A raised section constructed across a road to encourage vehicles to travel at lower speeds.

On site
Common near schools, residential estates and other low-speed environments where traffic calming is required.
Don't confuse with
Unlike a rumble strip, a speed hump creates a more substantial vertical movement intended to reduce vehicle speed.

Splice plate

Steel and timber

A steel plate used to connect separate lengths or sections of structural members, transferring the required forces across their joint.

On site
Used when joining steel beams, columns or bracing members that cannot be transported or installed as single lengths.
Don't confuse with
Unlike a base plate, a splice plate connects structural member segments rather than transferring loads to a foundation.

Split-face block

Masonry

A manufactured masonry block with a deliberately fractured face that creates a rough, natural stone-like texture.

On site
Used in decorative boundary walls, building facades and exposed blockwork where a textured appearance is required.
Don't confuse with
Unlike a smooth-faced concrete block, a split-face block has a rough decorative surface.

Splitting tensile strength test

Lab testing

An indirect tensile strength test in which a concrete cylinder or suitable specimen is compressed along a narrow loading line until splitting occurs.

On site
Used to estimate concrete tensile strength for material evaluation and quality control.
Don't confuse with
Unlike a direct tensile test, splitting tensile testing induces tensile stresses through applied compression.

Spoil

Earthworks

Excavated material that is not needed or not suitable for reuse.

On site
Carted away to an approved tip.

Square hollow section (SHS)

Steel and timber

A hollow structural steel section with equal external width and depth dimensions, forming a square cross-section.

On site
Used for steel posts, frames, railings, gates and lightweight structural supports.
Don't confuse with
Unlike RHS, SHS has equal external width and depth dimensions.

Stack (soil and vent stack)

Plumbing

The main vertical pipe in a building that carries waste down and lets air in at the top.

On site
Extended above the roof so smells escape safely.

Stack bond

Masonry

A masonry arrangement where blocks or bricks are placed directly above one another, creating continuous vertical joints.

On site
Used in selected architectural blockwork and brickwork where the design provides adequate reinforcement or other necessary stability measures.
Don't confuse with
Unlike running bond, stack bond has vertically aligned joints rather than staggered joints.

Stack ventilation

Architecture

Natural ventilation driven by differences in air density and pressure between lower and higher openings in a building.

On site
Used in buildings with high-level vents, stairwells or ventilation shafts to encourage warm air to rise and escape.
Don't confuse with
Unlike wind-driven cross ventilation, stack ventilation primarily relies on temperature-related buoyancy.

Staff (levelling staff)

Surveying

A graduated pole held upright on a point and read through a level.

On site
Must be held vertical. A bubble on the staff helps.

Stainless steel

Materials

A corrosion-resistant steel alloy containing sufficient chromium to develop a protective surface film.

On site
Used for handrails, fixings, architectural fittings and selected reinforcement applications exposed to corrosive environments.
Don't confuse with
Unlike galvanised steel, stainless steel develops corrosion resistance primarily through its alloy composition.

Stamped concrete

Concrete

Concrete whose surface is patterned using specialised stamps while the material remains sufficiently plastic.

On site
Used on driveways, patios, walkways and landscaped areas to imitate stone paving, bricks or other decorative patterns.
Don't confuse with
Unlike precast paving blocks, stamped concrete patterns are formed directly in the placed concrete.

Standard penetration test (SPT)

Lab testing

An in-situ soil test measuring resistance to driving a standard split-barrel sampler into the ground using a specified hammer and procedure.

On site
Performed inside geotechnical boreholes. The SPT N-value provides information used in soil classification and empirical foundation design correlations.
Don't confuse with
Unlike cone penetration testing, SPT involves driving a sampler that can recover disturbed soil.

Standing seam roofing

Roofing

A metal roofing system using long panels joined by raised folded seams that provide weather-resistant connections.

On site
Installed on residential, commercial and institutional roofs, often using concealed clips to secure panels without exposed fasteners.
Don't confuse with
Unlike conventional screw-fixed roofing sheets, standing seam systems commonly use concealed fastening arrangements.

Starter bars

Structural

Bars left sticking out of a foundation or slab so the next element (like a column) can be joined to it.

On site
Must be in the correct position and length before the foundation is cast.

Statical indeterminacy

Structural

A condition where the unknown structural reactions or internal forces cannot be calculated using equilibrium equations alone.

On site
Continuous beams and rigid frames often require compatibility equations and stiffness analysis to determine their support reactions and bending moments.
Don't confuse with
A statically determinate structure can be solved using equilibrium equations alone.

Steel angle section

Steel and timber

A structural steel section with two legs arranged approximately at right angles, forming an L-shaped cross-section.

On site
Used in steel trusses, bracing, support brackets and connection assemblies.
Don't confuse with
Unlike a channel section, an angle section has two legs rather than a web with two flanges.

Steel channel section

Steel and timber

A structural steel member with a C-shaped or U-shaped cross-section consisting of a web and two flanges.

On site
Used in steel frames, secondary supports, equipment platforms and fabricated structural assemblies.
Don't confuse with
Unlike an I-shaped beam, a channel section has both flanges projecting from one side of its web.

Steel erection tolerance

Steel and timber

The permitted variation in the position, alignment or geometry of erected structural steel members.

On site
Checked during steel frame installation to verify column verticality, beam levels and member positioning against the applicable specification.
Don't confuse with
Unlike fabrication tolerance, erection tolerance concerns the installed structural arrangement.

Steel fibre

Materials

A short steel element added to concrete to improve selected mechanical properties, particularly post-cracking resistance and toughness.

On site
Mixed into industrial floor concrete, sprayed concrete and some precast products according to the specified fibre dosage and performance requirements.
Don't confuse with
Unlike conventional reinforcing bars, steel fibres are dispersed throughout the concrete mixture.

Steel grade

Structural

The strength class of reinforcing steel, such as 460 or 500 N/mm² yield strength.

On site
Check the grade marked on the bar and delivery notes matches the drawing.

Steel wire armoured cable (SWA)

Electrical

An electrical cable containing a layer of steel wires that provides mechanical protection around its insulated conductors.

On site
Commonly used for outdoor electrical supplies, underground cable runs and connections to external buildings or equipment.
Don't confuse with
Unlike ordinary unarmoured cable, SWA includes steel wire protection against mechanical damage.

Stock register

Site practice

A record used to monitor quantities of materials received, issued and remaining in storage.

On site
Updated by storekeepers as cement bags, fittings, tools and other construction materials enter or leave the stores.
Don't confuse with
Unlike a goods received note, a stock register tracks inventory movements and balances over time.

Stone column

Geotechnical

A compacted column of granular material installed within weak ground to improve its engineering performance.

On site
Used beneath embankments and foundations to increase ground stiffness, improve drainage and reduce settlement where ground conditions are suitable.
Don't confuse with
Unlike a concrete pile, a stone column consists of compacted granular material and works with the surrounding soil.

Stone dressing

Masonry

The process of cutting, shaping and finishing natural stones to achieve the dimensions and surface appearance required for construction.

On site
Performed before laying selected building stones to obtain suitable bearing faces, neat corners and consistent joints.
Don't confuse with
Unlike stone laying, stone dressing prepares individual stones before installation.

Stone-coated steel roof tile

Roofing

A lightweight steel roofing panel coated with protective layers and stone granules to resemble conventional roof tiles.

On site
Used on Kenyan residential buildings, fixed onto suitable roof battens according to the manufacturer's installation requirements.
Don't confuse with
Unlike concrete roof tiles, stone-coated steel tiles use formed steel sheets as their main structural material.

Stopcock

Plumbing

A manually operated valve used to shut off water flow through a supply pipe.

On site
Installed near water service entry points so plumbers can isolate the supply during repairs, maintenance or emergencies.
Don't confuse with
Unlike a float valve, a stopcock is operated manually rather than automatically by water level.

Stopping sight distance

Roads

The minimum distance a driver needs to perceive a hazard, react and stop a vehicle safely under the assumed design conditions.

On site
Checked at horizontal curves, hill crests and intersections to ensure sufficient visibility for the selected design speed.
Don't confuse with
Unlike overtaking sight distance, stopping sight distance concerns bringing a vehicle to a safe stop.

Storage water heater

Plumbing

A water heating appliance that heats and stores a quantity of hot water in an insulated tank.

On site
Installed in houses, apartments and commercial buildings to supply hot water to showers, washbasins and other fixtures.
Don't confuse with
Unlike an instantaneous water heater, it stores heated water for later use.

Storm water drain

Drainage

A drain that carries rainwater away from roofs, roads and paved areas.

On site
Kept separate from foul drainage in most designs.
Don't confuse with
Foul drain, which carries sewage.

Stormwater attenuation tank

Drainage

An underground or above-ground storage system that temporarily holds stormwater and releases it at a controlled rate.

On site
Installed beneath suitable parking areas or open spaces where developments need stormwater storage but have limited land available.
Don't confuse with
Unlike a detention basin, an attenuation tank stores water within a constructed tank or modular storage system.

Strain

Structural

The change in length divided by the original length. It has no unit.

On site
Used with stress to describe how materials behave.

Stress

Structural

Force divided by the area it acts on, in N/mm² (MPa).

On site
Compare stress with strength to check if a member is safe.

Stretcher

Masonry

A block or brick laid lengthwise along the wall, with its long face showing.

On site
Stretcher bond uses only stretchers, overlapping by half a block.
Don't confuse with
Header, laid across the wall.

Striking (formwork)

Concrete

Removing formwork after the concrete has gained enough strength.

On site
Side forms come off sooner than soffit props. Follow the engineer's striking times.

Strip foundation

Structural

A continuous strip of concrete under a wall that spreads its load to the ground.

On site
Common for load-bearing walls in houses. Width and depth come from the foundation drawing.

Strong-column weak-beam principle

Structural

A seismic design principle that promotes yielding in beams before columns by providing suitable relative bending resistance at frame joints.

On site
Applied in earthquake-resistant moment frames to encourage more stable plastic mechanisms and reduce the risk of storey collapse.
Don't confuse with
The principle concerns relative member resistance, not simply making every column physically larger than every beam.

Structural core

Structural

A central or strategically positioned group of structural walls and connected elements that contributes to a building's stability.

On site
Common around lift shafts and staircases in multi-storey buildings, where reinforced concrete walls resist significant horizontal forces.
Don't confuse with
Unlike a non-structural service enclosure, a structural core contributes to the building's load resistance.

Structural redundancy

Structural

The presence of alternative load paths that allow a structure to redistribute forces if one member or connection becomes damaged.

On site
Engineers improve structural robustness through continuity, appropriate connections and alternative load paths, reducing dependence on a single critical member.
Don't confuse with
Redundancy concerns alternative load paths, while structural strength concerns resistance to applied forces.

Structural steel section

Structural

Rolled steel shapes such as I-beams (UB), columns (UC), channels and angles.

On site
Named by size and weight, e.g. 203 x 133 x 25 UB.

Strut-and-tie model

Structural

A structural design method representing internal force transfer through compression struts, tension ties and connecting nodes.

On site
Used to design disturbed regions such as deep beams, pile caps, beam-column joints and areas around concentrated loads or openings.
Don't confuse with
Unlike ordinary beam theory, strut-and-tie modelling represents force transfer through an idealised internal truss.

Sub-base

Roads

The layer of selected material between the subgrade and the base course.

On site
Spreads load and protects the subgrade. Often natural gravel or murram of a specified CBR.

Subcontract agreement

Contracts

A contract between a main contractor and subcontractor defining the scope, price, responsibilities and conditions of subcontracted work.

On site
Used when engaging specialist firms for electrical installation, roofing, glazing or other construction packages.
Don't confuse with
Unlike the main contract, a subcontract governs the relationship between the contractor and its subcontractor.

Subcontractor

Contracts

A specialist firm hired by the main contractor to carry out part of the work.

On site
Common for electrical, plumbing, aluminium and roofing works.

Subgrade

Roads

The natural or improved soil on which the road layers are built.

On site
Compacted and tested before the sub-base is laid. Its strength controls pavement thickness.

Submersible pump

Plant

A pump designed to operate while submerged in the liquid being pumped, usually using a sealed electric motor.

On site
Used to remove accumulated water from foundation excavations, trenches, sumps and flooded construction areas.
Don't confuse with
Unlike a surface-mounted pump, a submersible pump operates beneath the liquid surface.

Sulphate attack

Concrete

Deterioration caused by sulphates reacting with susceptible cementitious compounds, potentially producing expansion, cracking or loss of strength.

On site
A concern for foundations and underground concrete exposed to sulphate-bearing soils or groundwater, requiring suitable concrete specifications.
Don't confuse with
Unlike chloride-induced corrosion, sulphate attack primarily damages the cementitious material through chemical reactions.

Sulphate-resisting Portland cement

Materials

A type of Portland cement formulated to provide improved resistance to chemical attack from sulphates in soil or water.

On site
Specified for suitable foundations, underground structures and concrete exposed to sulphate-bearing ground conditions, following the relevant exposure classification and design requirements.
Don't confuse with
Unlike ordinary Portland cement, sulphate-resisting cement is formulated to reduce vulnerability to sulphate attack.

Superelevation

Roads

The banking of a road on a bend, with the outer edge raised, to help vehicles turn safely.

On site
Introduced gradually on the approach to a curve.
Don't confuse with
Camber, the two-way slope on a straight road.

Superstructure

Structural

Everything above the foundation or ground level.

On site
Contracts and BOQs are often split into substructure and superstructure.
Don't confuse with
Substructure, everything below ground floor level.

Surface dressing

Roads

A road surface made by spraying bitumen and spreading single-size chippings on top.

On site
Common on low-volume roads because it is cheaper than asphalt.

Surface dusting

Concrete

A concrete surface defect where a weak upper layer breaks down into fine powder under traffic or abrasion.

On site
Can occur on poorly finished floors, especially where excess water, premature finishing or inadequate curing weakened the surface.
Don't confuse with
Unlike surface scaling, dusting produces loose fine powder rather than larger flakes.

Surface scaling

Concrete

A deterioration defect where thin flakes or patches of the hardened concrete surface detach.

On site
May develop from freeze-thaw exposure, chemical attack or poor surface quality, depending on the environmental conditions.
Don't confuse with
Unlike dusting, scaling involves visible flaking or loss of surface material.

Surge protective device (SPD)

Electrical

A protective device that limits temporary overvoltages by diverting surge current away from sensitive electrical equipment.

On site
Installed in distribution boards and solar systems to help protect equipment against lightning-related and switching surges.
Don't confuse with
Unlike a circuit breaker, an SPD protects primarily against transient overvoltage rather than sustained overcurrent.

Survey control network

Surveying

A connected system of accurately established survey points that provides consistent horizontal or vertical reference positions.

On site
Established before major building, road and bridge works to ensure different survey teams use the same positional references.
Don't confuse with
Unlike an individual benchmark, a control network contains multiple connected reference points.

Suspended ceiling grid

Finishes

A framework of interconnected metal profiles suspended below a structural ceiling to support ceiling panels.

On site
Installed using hangers and perimeter trims before fitting ceiling tiles and coordinating lighting or ventilation openings.
Don't confuse with
Unlike direct-fixed ceiling boards, suspended ceiling panels are supported by a separate hanging grid.

Suspension bridge

Bridges

A bridge supported by main cables passing over towers, with the deck typically suspended from vertical hangers.

On site
Used for major long-span crossings, where anchorages resist the large tensile forces developed in the main cables.
Don't confuse with
Unlike a cable-stayed bridge, a suspension bridge uses main cables and separate hangers to support its deck.

Sway frame

Structural

A structural frame in which lateral movement of its joints is significant and must be considered in the structural analysis.

On site
Engineers check sway behaviour in multi-storey frames subjected to wind or other horizontal loads, especially where lateral bracing is limited.
Don't confuse with
Unlike a non-sway frame, a sway frame experiences significant lateral joint displacement.

Switch socket outlet

Electrical

A wall power socket with its own switch.

On site
Heights and positions are shown on the electrical layout drawing.

T

T-beam

Structural

A reinforced concrete beam with a T-shaped effective cross-section, formed when a slab and its supporting beam act together structurally.

On site
Common in reinforced concrete floor systems where the slab acts as the compression flange and the supporting beam forms the web.
Don't confuse with
Unlike a rectangular beam, a T-beam uses part of the slab as an effective flange.

Tack coat

Roads

A light spray of bitumen emulsion between asphalt layers to bond them.

On site
Applied just before the next layer is laid.
Don't confuse with
Prime coat, which goes on a granular base.

Tactile paving

Architecture

Paving with raised surface patterns designed to provide detectable information to pedestrians, particularly people with visual impairments.

On site
Installed at suitable pedestrian crossings, stair approaches and other locations where tactile warnings or directional guidance are required.
Don't confuse with
Unlike decorative textured paving, tactile paving uses standardised patterns for accessibility guidance.

Tag line (lifting)

Health and safety

A rope attached to a suspended load to help control its rotation or movement during lifting.

On site
Used when positioning steel beams or precast components, with workers maintaining a safe distance from suspended loads.
Don't confuse with
Unlike a lifting sling, a tag line controls load movement rather than supporting its weight.

Taking-over certificate (TOC)

Contracts

A certificate confirming that the employer takes over specified works or a section under the applicable contract requirements.

On site
Used in FIDIC contracts when completion requirements for taking over have been satisfied, subject to permitted minor outstanding items.
Don't confuse with
Unlike a performance certificate, a TOC relates to taking over works rather than later completion of remaining obligations.

Technical submittal

Site practice

A formal submission of technical documents for review against project requirements before specified materials, systems or methods are used.

On site
May include product datasheets, equipment specifications, calculations or specialist installation information.
Don't confuse with
Unlike an RFI, a technical submittal presents information for review rather than primarily asking a question.

Telehandler

Plant

A mobile lifting machine fitted with an extendable boom that can raise and position loads at different heights and distances.

On site
Used to lift pallets of blocks, roofing materials and other construction supplies to elevated working areas.
Don't confuse with
Unlike a conventional forklift, a telehandler has a telescopic boom that provides additional forward reach.

Temporary benchmark (TBM)

Surveying

A level reference point set up on site for day-to-day work.

On site
Protected and checked regularly against the main benchmark.

Ten percent fines value (TFV)

Lab testing

The force required to produce approximately ten percent fines from a standard aggregate sample under gradually applied compression.

On site
Used to assess aggregate resistance to crushing. Higher force values generally indicate stronger aggregates.
Don't confuse with
Unlike aggregate crushing value, TFV reports the force needed to produce a specified percentage of fines.

Tender

Contracts

An offer from a contractor to carry out work for a stated price.

On site
Submitted against the BOQ, drawings and conditions of contract.

Tender addendum

Contracts

An official document issued during tendering to modify, correct or supplement the original tender documents.

On site
Issued when drawings, specifications, quantities or submission instructions change before the tender closing date.
Don't confuse with
Unlike a tender clarification, an addendum formally changes or supplements the tender requirements.

Tender clarification

Contracts

An explanation requested or provided to resolve uncertainty about tender documents or a submitted bid.

On site
Used when bidders ask about drawing discrepancies, material specifications or measurement requirements before submitting their prices.
Don't confuse with
Unlike a tender addendum, a clarification does not necessarily modify the original tender requirements.

Tender evaluation

Contracts

The systematic assessment of submitted bids against the requirements and evaluation criteria stated in the tender documents.

On site
Evaluation teams examine eligibility, technical compliance, pricing and other specified criteria before making an award recommendation.
Don't confuse with
Unlike tender opening, tender evaluation examines the merits and compliance of submitted bids.

Tender opening

Contracts

The formal process of opening or accessing submitted bids after the tender submission deadline.

On site
Conducted according to applicable procurement procedures, with bid information recorded and handled through the required system.
Don't confuse with
Unlike tender evaluation, tender opening does not determine which bidder offers the best proposal.

Tender validity period

Contracts

The period during which a bidder agrees to keep its tender offer valid under the specified tender conditions.

On site
Stated in tender documents so the procuring entity knows how long submitted prices and offers remain available for acceptance.
Don't confuse with
Unlike the construction period, tender validity concerns the submitted offer before contract formation.

Tensile test

Lab testing

A test that pulls a steel bar until it breaks to find its yield and ultimate strength.

On site
Samples of each steel delivery may be tested to confirm grade.

Terrazzo

Finishes

A floor finish of marble or stone chips in cement, ground and polished smooth.

On site
Laid in panels with dividing strips to control cracking.

Texture depth

Roads

A measure describing the surface texture of a pavement, particularly its larger-scale surface irregularities.

On site
Measured during road quality checks to assess surface characteristics related to drainage and tyre interaction.
Don't confuse with
Unlike skid resistance, texture depth describes pavement surface geometry rather than directly measuring friction.

Textured coating

Finishes

A decorative surface coating formulated or applied to create a visible or touchable pattern rather than a completely smooth finish.

On site
Applied to selected internal and external walls using rollers, sprays or trowels to produce specified textures.
Don't confuse with
Unlike smooth emulsion paint, textured coating creates a deliberately uneven surface appearance.

Thermal cracking

Concrete

Cracking caused by restrained temperature-related expansion or contraction that generates tensile stresses beyond the concrete's resistance.

On site
May occur in thick foundations, walls and large pours when temperature differences develop during heating and cooling.
Don't confuse with
Unlike drying shrinkage cracking, thermal cracking is primarily driven by temperature changes.

Thermostatic mixing valve (TMV)

Plumbing

A valve that automatically blends hot and cold water to maintain a selected outlet temperature.

On site
Installed in hot water systems serving showers and washbasins where controlled temperatures help reduce scalding risks.
Don't confuse with
Unlike an ordinary mixer tap, a TMV automatically adjusts mixing to maintain a controlled temperature.

Thixotropy (soil)

Geotechnical

The tendency of certain disturbed soils to regain some strength over time while their water content remains essentially unchanged.

On site
Considered when assessing remoulded clay behaviour and strength recovery following construction disturbance.
Don't confuse with
Unlike consolidation, thixotropic strength recovery does not require drainage or a reduction in water content.

Three-phase supply

Electrical

Power supplied on three live conductors, used for larger buildings and motors.

On site
Pumps, lifts and large machines often need three-phase.

Tile adhesive

Finishes

A bonding material formulated to secure ceramic, porcelain or other compatible tiles to a prepared substrate.

On site
Spread using a notched trowel before fixing tiles to floors or walls, following the adhesive manufacturer's requirements.
Don't confuse with
Unlike tile grout, adhesive bonds tiles to the substrate rather than filling joints between them.

Tile edge trim

Finishes

A protective finishing profile installed along exposed tile edges or transitions between tiled surfaces.

On site
Common at bathroom corners, tiled steps and transitions where unfinished tile edges require protection.
Don't confuse with
Unlike skirting, tile edge trim protects or finishes specific exposed tile edges.

Tile grout

Finishes

A cementitious or resin-based material used to fill the spaces between installed tiles.

On site
Applied after tile fixing to fill joints, improve appearance and help protect tile edges.
Don't confuse with
Unlike tile adhesive, grout fills joints rather than securing tiles to the underlying surface.

Tile levelling clip

Finishes

An accessory used with a wedge or cap to reduce height differences between neighbouring tiles during installation.

On site
Used when laying large-format floor or wall tiles to improve surface alignment while the adhesive sets.
Don't confuse with
Unlike an ordinary tile spacer, a levelling clip also helps control differences in tile edge height.

Tile spacer

Finishes

A small removable or embedded accessory used to maintain consistent spacing between adjacent tiles during installation.

On site
Placed between wall or floor tiles to maintain uniform joint widths before grouting.
Don't confuse with
Unlike a tile levelling clip, a conventional spacer primarily controls joint width.

Timber ledger

Steel and timber

A horizontal timber member fixed to a supporting wall or structure to carry the ends of joists or other framing members.

On site
Used in suitable timber floor and deck construction, with structural fixings selected for the supported loads.
Don't confuse with
Unlike a rim joist, a ledger transfers supported framing loads into an adjoining structure.

Timber moisture movement

Steel and timber

Dimensional expansion or shrinkage of timber as its moisture content changes below the fibre saturation point.

On site
Considered when installing timber flooring, doors, cladding and joinery to prevent distortion, gaps and binding.
Don't confuse with
Unlike thermal expansion, timber moisture movement is caused mainly by changes in wood moisture content.

Timber seasoning

Steel and timber

The controlled reduction of timber moisture content to a level suitable for its intended use.

On site
Performed through air drying or kiln drying before timber is used for joinery, framing or other construction applications.
Don't confuse with
Unlike timber treatment, seasoning reduces moisture rather than primarily protecting against insects or decay.

Timber strength grading

Steel and timber

The classification of structural timber according to assessed strength and stiffness properties using approved visual or machine grading methods.

On site
Used when selecting timber for roof trusses, beams, joists and other load-bearing applications.
Don't confuse with
Unlike appearance grading, strength grading evaluates properties relevant to structural performance.

Timber stud

Steel and timber

A vertical timber framing member used to form and support walls or partitions.

On site
Installed at specified spacing in timber-framed walls to support sheathing, cladding and other wall components.
Don't confuse with
Unlike a timber joist, a stud is primarily a vertical wall-framing member.

Timber treatment

Materials

Applying preservatives to timber to protect it from termites, rot and fungus.

On site
Structural roof timber should be treated before fixing.

Time of concentration

Drainage

The estimated time required for runoff from the hydraulically most distant part of a catchment to reach a specified outlet.

On site
Used in stormwater design to select suitable rainfall duration when estimating peak discharge from a drainage catchment.
Don't confuse with
Unlike storm duration, time of concentration describes runoff travel time through the catchment.

Tipper

Plant

A lorry with a body that tilts to unload material.

On site
Used to deliver ballast, sand and hardcore and to cart away spoil.

Title block

Drawings

The box on a drawing showing the project name, drawing title, number, scale, revision and who drew and checked it.

On site
Always check the title block first so you are working from the latest revision.

Toe board

Health and safety

A low protective barrier installed along the edge of an elevated working platform to prevent objects from falling.

On site
Fixed along scaffold platforms and other elevated work areas to reduce the risk of tools and materials dropping onto people below.
Don't confuse with
Unlike a guardrail, a toe board primarily prevents materials and equipment from falling off platform edges.

Toe drain

Earthworks

A drainage system installed near the bottom of a slope or embankment to collect and remove water.

On site
Used at the base of selected earth slopes to control seepage and reduce water accumulation that could affect stability.
Don't confuse with
Unlike a catch drain near the upper slope, a toe drain is positioned near the slope base.

Tolerance annotation

Drawings

A drawing note or symbol specifying the permitted variation from a stated dimension, position or geometric requirement.

On site
Used on fabrication and construction details to communicate acceptable dimensional deviations during manufacturing, installation or inspection.
Don't confuse with
Unlike a nominal dimension, a tolerance annotation states the allowable variation from the specified value.

Toolbox talk

Site practice

A short safety briefing given to workers on site, usually before work starts.

On site
Focuses on the day's tasks and hazards.

Toothing

Masonry

An arrangement where alternate masonry units project from an unfinished wall edge to allow bonding with later construction.

On site
Left at selected wall junctions where masonry construction is intended to continue, subject to approved construction details.
Don't confuse with
Unlike a straight vertical wall joint, toothing provides projecting units intended to interlock with later masonry.

Top plate (timber framing)

Steel and timber

A horizontal timber member connecting the upper ends of wall studs and distributing loads or providing framing continuity.

On site
Installed above timber wall studs to support appropriate roof or floor framing and connect adjoining wall sections.
Don't confuse with
Unlike a sole plate, a top plate is positioned above the wall studs.

Topographic survey

Surveying

A survey that records ground levels and features such as trees, buildings, roads and services.

On site
The starting point for site layout, drainage and earthworks design.

Topping

Structural

The thin concrete layer cast over ribs or precast units to form the floor surface.

On site
Usually reinforced with light mesh.

Topsoil stockpile

Earthworks

A temporary heap of stripped topsoil stored for later landscaping or ground restoration.

On site
Contractors stockpile suitable topsoil separately from unsuitable excavated material to preserve it for final site reinstatement.
Don't confuse with
Unlike general excavation spoil, a topsoil stockpile is intended for later beneficial reuse.

Topsoil stripping

Earthworks

Removing the top layer of soil, which contains roots and organic matter, before construction.

On site
Topsoil is weak and compressible, so it is never left under foundations or slabs.

Torsion

Structural

Twisting of a member about its own axis.

On site
Edge beams carrying cantilevers can be in torsion and need closed links.

Torsional irregularity

Structural

A condition where a building experiences significantly uneven lateral displacement across its floor because of torsional response.

On site
May arise in buildings with asymmetric stiffness or mass distribution, requiring engineers to assess twisting effects under lateral loading.
Don't confuse with
Unlike ordinary lateral sway, torsional irregularity involves significant uneven displacement caused by floor rotation.

Total station

Surveying

An electronic survey instrument that measures angles and distances and calculates coordinates.

On site
Used for setting out buildings and roads and for detailed surveys.

Total stress

Geotechnical

The complete stress acting at a point in soil, including the stress carried by the soil skeleton and pore water.

On site
Calculated from soil weight and applied loads when analysing foundations, embankments and underground structures.
Don't confuse with
Total stress includes pore water pressure, while effective stress represents stress carried by the soil skeleton.

Toughened glass

Materials

Glass strengthened through controlled thermal or chemical treatment to improve resistance to mechanical and thermal stresses.

On site
Used in shower enclosures, suitable doors, partitions and architectural glazing where specified safety glass performance is required.
Don't confuse with
Unlike ordinary annealed glass, thermally toughened glass generally breaks into smaller fragments when fully fractured.

Trade sequencing

Site practice

The planned order of activities performed by different construction trades to avoid conflicts and unnecessary rework.

On site
Site managers coordinate masonry, plumbing, electrical installation, plastering and painting so each trade works at the appropriate stage.
Don't confuse with
Unlike labour allocation, trade sequencing focuses on the order and dependencies between different activities.

Traffic count

Roads

The systematic recording of vehicles passing a specified location during a defined observation period.

On site
Conducted manually or using automatic counters to determine traffic volumes, vehicle classifications and peak-hour demand.
Don't confuse with
Unlike AADT, a traffic count records observations over a particular survey period.

Traffic management plan

Site practice

A document describing measures for controlling vehicle and pedestrian movements around construction activities.

On site
Used where construction vehicles enter public roads or operate near pedestrians, including designated routes, signs and traffic controllers.
Don't confuse with
Unlike a site logistics plan, traffic management specifically addresses safe movement and interaction of road users.

Transfer beam

Structural

A heavy beam that carries a column from above and transfers its load to columns at the side.

On site
Used where a column cannot continue down, such as over a parking area.

Transfer slab

Structural

A heavily designed structural slab that redirects loads from columns or walls above to a different arrangement of supports below.

On site
Used when upper-floor column positions do not align with lower-floor supports, such as buildings with open commercial or parking spaces.
Don't confuse with
Unlike an ordinary floor slab, a transfer slab carries major structural loads from elements above.

Transition curve

Roads

A curve with gradually changing curvature that provides a smooth connection between a straight road section and a circular curve.

On site
Used on higher-speed roads to allow gradual steering changes and suitable development of superelevation.
Don't confuse with
Unlike a circular curve, a transition curve has changing curvature along its length.

Translational slope failure

Geotechnical

A slope failure where a soil or rock mass slides along a relatively planar or gently undulating surface.

On site
May occur where weak soil layers, bedding planes or interfaces form continuous sliding surfaces beneath slopes.
Don't confuse with
Unlike rotational failure, translational failure involves sliding mainly along a relatively planar surface.

Transom

Architecture

A horizontal member dividing a window or glazed opening into separate sections.

On site
Common in aluminium window frames and curtain wall systems, where it separates upper and lower glazing panels.
Don't confuse with
Unlike a mullion, a transom runs horizontally.

Trap

Plumbing

A bend in a waste pipe that holds water to stop drain smells entering the building.

On site
Fitted under every sink, basin, shower and toilet.

Trash screen

Drainage

A screen or grille installed at a drainage opening to prevent large debris from entering or blocking the drainage system.

On site
Installed at culvert inlets and stormwater intakes where branches, plastics and other debris could cause blockages.
Don't confuse with
Unlike a silt trap, a trash screen primarily intercepts larger floating or carried debris.

Traverse

Surveying

A series of connected survey lines whose lengths and angles are measured.

On site
Used to establish control points across a site.

Tread

Architecture

The horizontal part of a stair step that you stand on.

On site
A typical tread is 250 to 300 mm.
Don't confuse with
Riser, the vertical part.

Tremie concreting

Concrete

A method of placing concrete underwater or beneath supporting fluid through a pipe while limiting contact with the surrounding fluid.

On site
Used in bored pile construction, diaphragm walls and underwater foundations to place concrete without significant segregation or contamination.
Don't confuse with
Unlike ordinary free-fall placement, tremie concreting delivers concrete through a controlled pipe system.

Tremie pipe

Concrete

A pipe used to deliver fresh concrete to the bottom of an underwater or fluid-filled excavation during controlled placement.

On site
Used during bored pile concreting, with its discharge end kept adequately embedded in fresh concrete during continuous placement.
Don't confuse with
A tremie pipe is the placing equipment, while tremie concreting is the complete placement method.

Trench bedding

Earthworks

A prepared layer of suitable material placed beneath an underground pipe to provide uniform support.

On site
Workers place and level approved bedding material before laying drainage, sewer or water supply pipes.
Don't confuse with
Unlike pipe surround, trench bedding specifically supports the underside of the pipe.

Trench box

Earthworks

A prefabricated protective structure placed inside an excavation to protect workers from collapsing trench walls.

On site
Used during pipe installation in suitable trenches. Workers remain within the protected area while laying or connecting pipes.
Don't confuse with
Unlike trench sheeting, a trench box primarily shields workers rather than preventing all surrounding ground movement.

Trench drain

Drainage

A long, narrow surface drainage channel, usually covered with a removable grate, that collects runoff along its length.

On site
Installed across driveways, parking entrances, paved compounds and industrial floors to intercept surface water.
Don't confuse with
Unlike a point drainage inlet, a trench drain collects water along a continuous channel.

Trench plug

Earthworks

A barrier installed across a trench to restrict water movement along permeable bedding or backfill.

On site
Used in pipeline trenches on slopes where water could otherwise flow along the trench and cause erosion or drainage problems.
Don't confuse with
Unlike ordinary trench bedding, a trench plug is designed to interrupt water flow.

Trench roller

Plant

A compact roller designed to compact soil within trenches and confined excavations, often using vibrating drums.

On site
Used during sewer, drainage and pipeline backfilling, especially where the trench width restricts conventional compaction equipment.
Don't confuse with
Unlike a conventional road roller, a trench roller is designed for narrow working spaces.

Trench sheeting

Earthworks

Timber, steel or other suitable panels installed against trench walls to help retain soil and prevent collapse.

On site
Used in deeper or unstable trenches, often together with braces or hydraulic supports to maintain excavation stability.
Don't confuse with
Unlike a trench box, trench sheeting forms part of a system supporting the excavation walls.

Trencher

Plant

A specialised excavation machine designed to cut relatively narrow trenches using a digging chain or rotating cutting wheel.

On site
Used for installing water pipes, electrical cables, telecommunications ducts and irrigation lines along suitable routes.
Don't confuse with
Unlike a conventional excavator, a trencher produces a continuous narrow excavation using a dedicated cutting mechanism.

Trial pit

Geotechnical

A hole dug on site to see and sample the soil layers.

On site
Simple and cheap for small buildings.

Triaxial compression test

Lab testing

A soil strength test in which a cylindrical specimen is subjected to confining pressure and increasing axial stress until a specified condition or failure occurs.

On site
Used in foundation, slope and earth-retaining structure design to determine soil strength under controlled drainage and stress conditions.
Don't confuse with
Unlike direct shear testing, triaxial testing allows controlled confinement and drainage conditions.

Tributary area

Structural

The portion of a floor, roof or other loaded surface whose load is assigned to a particular supporting member.

On site
Engineers calculate tributary areas when estimating the loads carried by columns, beams and foundations during preliminary structural design.
Don't confuse with
Tributary area is the assigned loading area, not necessarily the total floor area.

Trunking

Electrical

A rectangular channel, usually plastic or metal, for carrying cables on a surface.

On site
Used where cables cannot be hidden in walls.
Don't confuse with
Conduit, which is round.

Truss

Roofing

A triangulated frame of timber or steel members that supports a roof.

On site
Trusses are spaced along the building and carry the purlins.

Truss bridge

Bridges

A bridge supported by a framework of interconnected members, commonly arranged in triangles to transfer loads mainly through axial forces.

On site
Used for road, railway and pedestrian crossings, with steel members connected through designed joints.
Don't confuse with
Unlike a solid-web girder bridge, a truss bridge uses an open framework of interconnected members.

Truss connector plate

Steel and timber

A manufactured metal plate with punched teeth used to connect timber members in engineered truss assemblies.

On site
Pressed into timber joints during prefabrication of suitable roof trusses using specialised equipment.
Don't confuse with
Unlike an ordinary bolted steel plate, a toothed connector plate transfers forces through embedded metal teeth.

Tube structural system

Structural

A tall-building structural arrangement in which closely connected perimeter members resist a significant portion of lateral forces.

On site
Used in some high-rise designs where external columns and beams form a stiff structural tube against wind and overturning effects.
Don't confuse with
Unlike an ordinary moment frame, a tube system mobilises much of the building perimeter as one lateral-resisting structure.

Turning space (wheelchair)

Architecture

A clear floor area designed to allow a wheelchair user to turn or change direction without obstruction.

On site
Provided in accessible toilets, entrances and circulation areas according to the dimensions required by applicable accessibility standards.
Don't confuse with
Unlike ordinary passage width, wheelchair turning space provides room for manoeuvring rather than straight movement.

Twin and earth cable

Electrical

A flat sheathed cable containing two insulated current-carrying conductors and a protective conductor.

On site
Used in suitable fixed wiring installations for lighting and socket circuits where permitted by the applicable wiring requirements.
Don't confuse with
Unlike flexible appliance cable, twin and earth cable is primarily intended for fixed electrical wiring.

Two-way slab

Structural

A slab supported on all sides that spans in both directions.

On site
Has main steel in both directions. The short-span bars go at the bottom.

U

UDL (uniformly distributed load)

Structural

A load spread evenly along the length of a beam, measured in kN/m.

On site
A wall sitting on a beam is a UDL.
Don't confuse with
Point load, which acts at one spot.

Ultimate limit state (ULS)

Structural

The design condition for strength and stability, checking the structure will not collapse.

On site
Uses factored loads, such as 1.4 dead plus 1.6 imposed in BS 8110.

Ultra-high-performance concrete (UHPC)

Concrete

An advanced cement-based material with exceptionally high strength, a dense internal structure and very low permeability, often containing steel fibres.

On site
Used in specialised bridge connections, precast elements and structural repairs requiring high resistance and durability.
Don't confuse with
Unlike conventional HPC, UHPC generally achieves much higher strength and a denser material structure.

Ultrasonic pulse velocity (UPV) test

Lab testing

A non-destructive test that measures the speed of an ultrasonic pulse travelling through concrete.

On site
Used to assess concrete uniformity and investigate possible defects, cracks or deterioration. Interpretation depends on material conditions and test arrangement.
Don't confuse with
Unlike a rebound hammer test, UPV measures sound-wave travel time rather than surface rebound.

Unbalanced bid

Contracts

A tender in which individual item prices are disproportionately high or low compared with reasonable cost relationships.

On site
May be identified when reviewing unusually high excavation rates or low rates for other major construction activities.
Don't confuse with
Unlike an ordinary pricing difference, an unbalanced bid shows significant distortions between individual item rates.

Unconfined compression test (UCT)

Lab testing

A test that measures the axial compressive strength of a cohesive soil specimen without applying lateral confining pressure.

On site
Commonly performed on suitable cohesive soil samples to estimate unconfined compressive strength and, under appropriate assumptions, undrained shear strength.
Don't confuse with
Unlike triaxial compression testing, UCT applies no external lateral confining pressure.

Under-reinforced section

Structural

A reinforced concrete section designed so its tension reinforcement yields before the concrete reaches its crushing strain under bending.

On site
Preferred in conventional reinforced concrete beam design because steel yielding allows significant deformation and gives warning before failure.
Don't confuse with
Unlike an over-reinforced section, an under-reinforced section normally develops a ductile flexural failure.

Under-vibration

Concrete

Insufficient vibration of fresh concrete, leaving entrapped air or preventing the material from fully surrounding reinforcement.

On site
May produce voids, poor surface quality and reduced durability in columns, beams and other heavily reinforced members.
Don't confuse with
Unlike over-vibration, under-vibration fails to provide enough compaction energy.

Undercoat

Finishes

A paint layer applied before the final coat to seal the surface and improve coverage.

On site
New plaster usually needs a sealer or undercoat first.

Undrained shear strength

Geotechnical

The shear resistance of soil when drainage does not occur during loading.

On site
Used in short-term stability analysis of saturated clay foundations, slopes and excavations.
Don't confuse with
Unlike drained shear strength, undrained shear strength is evaluated without allowing pore water to drain during shearing.

Unit rate

Contracts

The agreed price for completing one measured unit of a specified construction activity or work item.

On site
Used when pricing excavation per cubic metre, plastering per square metre or pipe installation per linear metre.
Don't confuse with
Unlike a lump sum price, a unit rate applies to an individual measured quantity.

Universal beam (UB)

Steel and timber

A standard hot-rolled steel beam with an I-shaped cross-section, commonly having relatively wide flanges and a deeper web.

On site
Used as floor beams, roof beams and supporting members in steel-framed buildings. Engineers specify sections using standard dimensions and mass per metre.
Don't confuse with
Unlike a universal column, a universal beam generally has a greater depth relative to its flange width.

Universal column (UC)

Steel and timber

A standard hot-rolled steel section with an H-shaped cross-section, commonly having relatively wide flanges suited to compression and bending.

On site
Used for columns in multi-storey steel buildings, industrial structures and other steel frames.
Don't confuse with
Unlike a universal beam, a universal column generally has a more compact cross-section with wider flanges relative to its depth.

Universal design

Architecture

An approach to designing buildings and environments so they are usable by as many people as possible, regardless of age or ability.

On site
Applied through accessible entrances, suitable circulation widths, understandable signage and facilities serving different users.
Don't confuse with
Unlike designing only for a specific disability, universal design considers a broad range of users.

Universal Transverse Mercator (UTM)

Surveying

A global map projection system dividing most of the Earth into six-degree longitude zones with coordinates expressed in metres.

On site
Used in East African mapping and GNSS workflows, with the correct zone, hemisphere and datum specified.
Don't confuse with
Unlike latitude and longitude, UTM positions are represented using planar easting and northing coordinates.

Unsafe condition

Health and safety

A physical workplace situation that creates an unacceptable risk of injury, illness or damage.

On site
Examples include damaged electrical cables, missing scaffold guardrails, unstable material stacks and uncovered floor openings.
Don't confuse with
Unlike an unsafe act, an unsafe condition describes a hazardous workplace state rather than a person's behaviour.

Uplift force

Structural

An upward force acting on a structural element, potentially causing lifting, separation or overturning.

On site
Wind suction may lift roof sheets and trusses, while groundwater pressure can create uplift beneath basement slabs.
Don't confuse with
Unlike downward gravity loading, uplift acts upward and may require anchorage or additional resisting weight.

uPVC pipe

Plumbing

Rigid plastic pipe used for drainage, waste and sometimes cold water.

On site
Joined with solvent cement. Protect from long exposure to sunlight.

Urinal

Plumbing

A sanitary appliance primarily designed for collecting and discharging urine into a drainage system.

On site
Installed in public washrooms, schools, offices and commercial buildings, with suitable flushing or waterless arrangements.
Don't confuse with
Unlike a WC, a urinal is not designed to receive solid human waste.

V

Vacuum breaker

Plumbing

A device that admits air into a plumbing system when negative pressure develops, helping prevent unwanted siphoning.

On site
Installed at suitable water supply connections where backsiphonage could draw contaminated water into the supply.
Don't confuse with
Unlike a pressure reducing valve, a vacuum breaker protects against negative pressure rather than controlling positive supply pressure.

Vacuum tanker

Plant

A specialised vehicle fitted with a vacuum system and storage tank for collecting and transporting liquids, sludge or suitable waste.

On site
Used to empty septic tanks, remove sludge from drainage structures and collect accumulated water or slurry from excavations.
Don't confuse with
Unlike a water bowser, a vacuum tanker uses suction to collect material into its tank.

Valley

Roofing

The internal angle where two roof slopes meet and water collects.

On site
Lined with a valley gutter or flashing.

Valley rafter

Roofing

A diagonal structural member located along the inward intersection of two pitched roof surfaces.

On site
Installed where adjoining roof slopes meet to form a valley, supporting associated roof framing members.
Don't confuse with
Unlike a hip rafter, a valley rafter follows an inward roof intersection.

Vapour control layer (VCL)

Roofing

A membrane or material layer designed to restrict water vapour movement into parts of a roof where condensation could occur.

On site
Installed in suitable insulated roof assemblies, with joints and penetrations sealed according to the roof design.
Don't confuse with
Unlike waterproofing membranes, vapour control layers primarily restrict water vapour movement rather than liquid water penetration.

Variation

Contracts

A change to the work described in the contract, such as added, removed or altered work.

On site
Must be instructed in writing before it is done, so it can be paid for.

Vebe consistometer test

Lab testing

A concrete consistency test that measures the time required for a stiff concrete sample to remould under specified vibration.

On site
Used when assessing low-workability concrete that may not be adequately characterised by a conventional slump measurement.
Don't confuse with
Unlike slump testing, the Vebe test measures remoulding time under vibration.

Vegetated swale

Drainage

A shallow, vegetation-covered channel designed to convey, slow and sometimes infiltrate or treat stormwater runoff.

On site
Constructed alongside roads, parking areas and landscaped developments to manage runoff while reducing erosion and trapping some pollutants.
Don't confuse with
Unlike a conventional concrete drain, a vegetated swale uses planted soil surfaces to help manage runoff.

Venetian plaster

Finishes

A decorative wall finish made from fine plaster materials, often containing lime and marble powder, applied in thin layers.

On site
Used on feature walls in hotels, offices and high-end residences to create polished, marble-like decorative surfaces.
Don't confuse with
Unlike conventional plaster, Venetian plaster is primarily applied to achieve a decorative polished appearance.

Vent pipe

Plumbing

A pipe that lets air into the drainage system so traps are not sucked empty.

On site
Usually part of the soil stack, open above roof level.

Vertical alignment

Roads

The designed elevation profile of a road along its length, consisting of gradients and vertical curves.

On site
Used to determine road levels, climbing gradients, crest locations and sag locations during highway design and construction.
Don't confuse with
Unlike horizontal alignment, vertical alignment describes how road elevation changes along the route.

Vertical angle

Surveying

The angle between a line of sight and the horizontal plane, indicating elevation or depression.

On site
Measured with total stations to calculate elevation differences and reduce inclined measurements to horizontal distances.
Don't confuse with
Unlike a zenith angle, a conventional vertical angle is referenced from the horizontal plane.

Vertical curve

Roads

A smooth curve connecting two different road gradients in the longitudinal profile.

On site
Provided at hill crests and valley locations to improve driving comfort, visibility and vehicle movement.
Don't confuse with
Unlike a horizontal curve, a vertical curve connects changes in road gradient rather than direction.

Vestibule

Architecture

A small enclosed entrance space between an exterior door and the main interior of a building.

On site
Provided at entrances to offices, hotels and commercial buildings to control access and reduce the entry of wind and dust.
Don't confuse with
Unlike a foyer, a vestibule is usually a smaller transitional space immediately inside the entrance.

Vibrator (poker)

Concrete

A tool pushed into fresh concrete that vibrates it to remove air and compact it.

On site
Insert vertically at close spacing and withdraw slowly. Do not use it to move concrete sideways.

Vibratory pile hammer

Plant

A pile installation machine that uses rapid vibrations to reduce ground resistance while driving or extracting suitable piles.

On site
Used for installing and removing steel sheet piles and certain other pile types during foundation and excavation support works.
Don't confuse with
Unlike an impact pile hammer, a vibratory hammer uses continuous vibration rather than repeated heavy blows.

Vibratory rammer

Plant

A compact compaction machine that uses repeated vertical impacts to densify soil in small or confined areas.

On site
Commonly used for compacting trench backfill, foundation edges and narrow spaces where larger rollers cannot operate.
Don't confuse with
Unlike a plate compactor, a rammer concentrates its impact over a smaller contact area.

Vibrocompaction

Geotechnical

A ground improvement method that uses a vibrating probe to rearrange and densify suitable loose granular soils.

On site
Used to improve loose sand deposits beneath foundations, storage facilities and other structures where settlement reduction is required.
Don't confuse with
Unlike stone column installation, vibrocompaction primarily densifies existing soil without deliberately forming aggregate columns.

Vierendeel truss

Structural

A structural framework with rectangular or similar openings and rigid joints, transferring forces through bending, shear and axial action.

On site
Used where large unobstructed openings are required, such as architectural frames, bridge members and certain transfer structures.
Don't confuse with
Unlike a conventional triangulated truss, a Vierendeel truss has no diagonal members and relies significantly on joint rigidity.

Viewport (CAD)

Drawings

A defined viewing area that displays part of a CAD model, often at a selected drawing scale.

On site
Used in AutoCAD layouts to show plans, sections and details at different scales on the same drawing sheet.
Don't confuse with
Unlike model space, a viewport is a viewing window into model geometry.

Vinyl sheet flooring

Finishes

A flexible synthetic floor covering supplied in continuous rolls, commonly manufactured using polyvinyl chloride.

On site
Installed in clinics, schools, offices and other buildings where a relatively continuous, easy-to-clean floor finish is required.
Don't confuse with
Unlike vinyl tiles, sheet flooring covers larger areas using continuous rolled material.

Visitor register

Site practice

A record of people visiting a construction site, usually showing their names, organisations, entry times and departure times.

On site
Visitors sign in at the site gate or office before being directed to the appropriate supervisor.
Don't confuse with
Unlike a labour attendance register, a visitor register records people who are not attending as regular site workers.

Void ratio

Geotechnical

The ratio of the volume of empty spaces in soil to the volume of solid soil particles.

On site
Calculated during laboratory investigations to assess soil packing, compressibility and changes during consolidation.
Don't confuse with
Void ratio compares void volume with solid volume, while porosity compares void volume with total soil volume.

Voltage drop

Electrical

The reduction in electrical voltage along a conductor caused by current flowing through the conductor's impedance.

On site
Calculated when sizing cables for long circuits to ensure equipment receives adequate voltage within permitted limits.
Don't confuse with
Unlike supply voltage, voltage drop represents the voltage lost along the electrical circuit.

Vortex flow control

Drainage

A hydraulic device that uses swirling water movement to restrict discharge without relying on moving mechanical parts.

On site
Installed in stormwater control chambers to limit discharge from attenuation tanks and detention systems.
Don't confuse with
Unlike a simple fixed orifice, vortex flow control uses rotational flow effects to regulate discharge.

W

Waffle slab

Structural

A reinforced concrete slab with ribs running in two directions, forming a grid of recessed panels underneath.

On site
Used in buildings requiring relatively long spans and reduced concrete self-weight. Reusable moulds or special formwork create the recessed grid.
Don't confuse with
Unlike a solid slab, a waffle slab removes concrete from selected areas between its supporting ribs.

Wall plate

Roofing

A timber member fixed on top of a wall that the rafters or trusses sit on.

On site
Anchored to the ring beam or wall with straps or bolts.

Wall putty

Finishes

A fine filling material used to correct small surface imperfections before painting or other decorative finishing.

On site
Applied to minor holes, shallow cracks and uneven areas on prepared walls, then sanded smooth after hardening.
Don't confuse with
Unlike a full plaster coat, wall putty is generally used for smaller surface corrections.

Wall tie

Masonry

A corrosion-resistant connector used to link masonry leaves or connect masonry to supporting structural elements.

On site
Installed at specified spacing in cavity walls to transfer lateral forces between the leaves while maintaining the required separation.
Don't confuse with
Unlike a reinforcement bar, a wall tie primarily connects masonry elements rather than providing general reinforcement within them.

Warm roof

Roofing

A roof construction arrangement where thermal insulation is positioned above the main structural roof deck.

On site
Common in insulated flat roof systems, helping maintain the roof deck at a relatively stable temperature.
Don't confuse with
Unlike a cold roof, a warm roof places insulation above the structural deck.

Washbasin

Plumbing

A sanitary appliance consisting of a bowl with a water outlet, commonly used for washing hands and face.

On site
Installed in bathrooms and washrooms, connected to a water supply, waste pipe and suitable trap.
Don't confuse with
Unlike a kitchen sink, a washbasin is primarily designed for personal washing.

Washout resistance

Concrete

The ability of fresh concrete to retain its cement paste and fine particles when exposed to water during placement.

On site
Important for underwater concrete and bored pile construction, where suitable mix design helps prevent paste loss and segregation.
Don't confuse with
Unlike segregation resistance in ordinary placement, washout resistance specifically concerns material loss into surrounding water.

Water bowser

Plant

A mobile water tank, usually mounted on a truck or trailer, used to transport and distribute water around construction sites.

On site
Used for dust suppression, soil moisture conditioning, road construction and supplying water for approved site activities.
Don't confuse with
Unlike a concrete transit mixer, a water bowser carries and distributes water rather than mixing concrete.

Water closet (WC)

Plumbing

A sanitary toilet appliance that receives human waste and uses flushing water to discharge it into a drainage system.

On site
Installed in residential and commercial toilets, connected to the soil drainage system with an appropriate water seal.
Don't confuse with
Unlike a urinal, a WC is designed to receive both solid and liquid human waste.

Water hammer

Plumbing

A loud bang and pressure surge in pipes when water is stopped suddenly.

On site
Reduced by closing valves slowly and fixing pipes firmly.

Water meter

Plumbing

A measuring device that records the volume of water passing through a supply pipe.

On site
Installed at building water connections to measure consumption for billing, monitoring and identifying unusual water usage.
Don't confuse with
Unlike a pressure gauge, a water meter measures water volume rather than pressure.

Water service pipe

Plumbing

A pipe that carries water from a public distribution main or another approved supply point to a building or property.

On site
Installed underground between the supply connection and the building's water distribution system, following the approved plumbing layout.
Don't confuse with
Unlike an internal distribution pipe, a service pipe delivers water to the property's supply system.

Water table

Geotechnical

The level below which the ground is saturated with water.

On site
High water tables need dewatering during excavation.

Water-cement ratio

Concrete

The weight of water divided by the weight of cement in a mix.

On site
Lower ratio means stronger concrete. Adding extra water on site to make it easier to work weakens it.

Waterproofing

Finishes

A membrane or coating that stops water entering a roof, wall or basement.

On site
Laid on flat roofs, wet rooms and below-ground walls, with careful detailing at joints.

Wayfinding

Architecture

The use of spatial layouts, signs, landmarks and visual information to help people understand and navigate a building.

On site
Applied in hospitals, campuses, shopping centres and offices through clear directions, room numbering and identifiable circulation routes.
Don't confuse with
Unlike signage alone, wayfinding includes the overall spatial and information system used for navigation.

Wearing course

Roads

The uppermost layer of a road pavement, designed to provide a durable, skid-resistant running surface and protect the underlying layers.

On site
Placed as the final asphalt or concrete surface that vehicles travel on. Its thickness and material properties follow the approved pavement design.
Don't confuse with
Unlike the binder course, the wearing course is directly exposed to traffic and weather.

Weather-struck joint

Masonry

A mortar joint finished with a sloping exposed surface intended to help shed rainwater away from the masonry.

On site
Used in selected exposed brickwork where the specified joint profile helps manage rainwater on the wall face.
Don't confuse with
Unlike a recessed joint, a weather-struck joint has a sloping mortar face.

Weathering steel

Materials

A low-alloy structural steel designed to form a relatively protective rust-like surface layer under suitable atmospheric exposure.

On site
Used in selected bridges, facades and exposed steel structures where environmental conditions support stable protective patina formation.
Don't confuse with
Unlike ordinary carbon steel, weathering steel is formulated to reduce atmospheric corrosion under appropriate exposure conditions.

Web crippling

Structural

Local crushing or deformation of a thin structural web under a concentrated load or support reaction.

On site
Checked in steel beams and cold-formed sections near supports or point loads, where bearing stiffeners may be required.
Don't confuse with
Unlike overall member buckling, web crippling is a local failure near concentrated forces.

Web stiffener

Steel and timber

A steel plate or element attached to a beam or girder web to improve resistance against local deformation or instability.

On site
Installed near concentrated loads, supports or other locations where an unstiffened web may lack sufficient resistance.
Don't confuse with
Unlike a splice plate, a web stiffener strengthens an existing section rather than joining separate member lengths.

Weep hole

Structural

A small opening in a retaining wall that lets water drain out from behind it.

On site
Placed near the bottom of the wall with a filter of gravel behind.

Weld

Structural

A joint made by melting and fusing metal parts together.

On site
Common types are fillet and butt welds. Weld size is shown on steel drawings.

Weld throat

Steel and timber

The effective thickness of weld material used when calculating the resistance of a welded connection.

On site
Specified or calculated during structural steel connection design, particularly when sizing fillet welds.
Don't confuse with
Unlike weld leg length, throat thickness represents the effective resisting thickness of the weld.

Wet cutting

Health and safety

A cutting method that applies water at the cutting point to suppress airborne dust and assist cooling.

On site
Used when cutting suitable concrete, blocks and tiles to reduce exposure to hazardous dust, alongside other necessary controls.
Don't confuse with
Unlike dry cutting, wet cutting uses water to help control dust generation.

Wheel loader

Plant

A wheeled construction machine fitted with a large front bucket for lifting, carrying and loading loose materials.

On site
Common at Kenyan quarries, batching yards and road projects for loading sand, ballast, aggregates and excavated soil into trucks.
Don't confuse with
Unlike a bulldozer, a wheel loader is mainly designed to lift and load material.

Wheel tracking test

Lab testing

A laboratory test that repeatedly passes a loaded wheel over an asphalt specimen to evaluate susceptibility to permanent deformation.

On site
Used when assessing asphalt mixtures for heavily trafficked roads, where rut depth or deformation rate helps indicate rutting resistance.
Don't confuse with
Unlike Marshall stability testing, wheel tracking evaluates repeated wheel-loading effects rather than a single loading event.

Wheelbarrow

Plant

A one-wheeled cart for moving materials on site.

On site
Not accurate for batching. Use a gauge box instead.

White cement

Materials

A Portland cement manufactured with carefully selected raw materials to produce a white or very light-coloured binder.

On site
Used in decorative concrete, terrazzo, architectural finishes and coloured cement products where appearance is important.
Don't confuse with
Unlike grey Portland cement, white cement contains fewer colouring compounds.

Wind load

Structural

The force or pressure exerted by wind on a building or structure, including pressure and suction effects.

On site
Engineers consider wind loads when designing roof connections, cladding, tall buildings, steel frames and other exposed structures.
Don't confuse with
Unlike dead load, wind load varies with wind conditions and building exposure.

Window schedule

Drawings

A table identifying windows and providing their dimensions, types, materials, glazing and other relevant specifications.

On site
Used when manufacturing and installing aluminium, steel or timber windows according to architectural drawings.
Don't confuse with
Unlike a door schedule, a window schedule provides specifications for window assemblies.

Wing wall

Bridges

A retaining wall extending from or positioned near a bridge abutment to support the approach embankment.

On site
Constructed at bridge ends to retain approach fill and prevent soil from spilling into adjacent drainage channels or waterways.
Don't confuse with
Unlike an abutment, a wing wall primarily retains soil beside the bridge approach.

Wire ferrule

Electrical

A small metal sleeve fitted over the stripped end of a stranded conductor to improve terminal connection reliability.

On site
Crimped onto flexible control wires before insertion into compatible screw or clamp terminals.
Don't confuse with
Unlike a cable lug, a ferrule generally retains the conductor strands within a terminal connection.

Witness point

Site practice

A specified activity or test that an authorised party must be notified about and given the opportunity to observe.

On site
Used for selected material tests or construction operations where the consultant may attend after receiving the required notice.
Don't confuse with
Unlike a hold point, work may proceed without attendance at a witness point when the applicable notification rules permit.

Workability

Concrete

How easily fresh concrete can be mixed, placed and compacted.

On site
Measured on site with the slump test.

Workfront

Site practice

A specific area or section of a construction project made available for a team to carry out assigned activities.

On site
A site manager may release completed structural areas to masonry or electrical teams when access and safety conditions permit.
Don't confuse with
Unlike the entire construction site, a workfront refers to a particular available working area.

Working load limit (WLL)

Health and safety

The maximum load that a lifting component or accessory is rated to support under specified operating conditions.

On site
Checked on lifting slings, shackles and hooks before selecting equipment for crane operations.
Don't confuse with
Unlike breaking strength, WLL specifies the permitted operating load rather than the load causing failure.

Working platform

Earthworks

A prepared ground surface designed to safely support construction personnel, equipment and temporary operations.

On site
Constructed for piling rigs, cranes and heavy earthmoving machinery, with suitable bearing and stability checks before equipment operates.
Don't confuse with
Unlike an ordinary access track, a working platform is designed for specified construction loads and operational conditions.

Y

Y-bar (high yield bar)

Structural

Deformed high-strength reinforcing bar. Y12 means a 12 mm high-yield bar.

On site
Main bars are usually Y bars. R bars (plain round) are sometimes used for links.
Don't confuse with
R-bar, a plain mild steel bar.

Y-strainer

Plumbing

A pipe fitting with a Y-shaped body containing a removable screen that traps solid particles from flowing water.

On site
Installed before pumps, valves and sensitive equipment to reduce damage or blockage caused by dirt and debris.
Don't confuse with
Unlike a fine water purification filter, a Y-strainer mainly removes larger suspended particles.

Yield line theory

Structural

A plastic analysis method that estimates the collapse load of a reinforced concrete slab by considering possible patterns of plastic hinges.

On site
Engineers use yield line analysis to investigate slab collapse mechanisms and estimate ultimate load capacity for suitable slab configurations.
Don't confuse with
Unlike elastic slab analysis, yield line theory examines possible plastic collapse mechanisms.

Yield strength

Structural

The stress at which steel starts to stretch permanently.

On site
Used as the steel strength in design (fy).

Z

Zenith angle

Surveying

The angle measured from the upward vertical direction to the instrument's line of sight.

On site
Displayed by many total stations and used with measured distances to calculate horizontal and vertical components.
Don't confuse with
Unlike a vertical angle measured from the horizon, a zenith angle is measured from the upward vertical.

No term matches that search yet. Tell us on WhatsApp and we will add it.

Missing a word?Send it to us on WhatsApp and we will add it to the dictionary.
Suggest a term →