01 · Foundation
Excavation Volume
Every building starts with a hole in the ground. This calculator tells you how much soil comes out of a trench or pit, how much space it takes once it is dug, and how many lorry trips it takes to cart it away.
Use it for
- Pricing the digging of foundation trenches
- Booking tipper lorries for cart-away
- Checking a contractor's excavation quantities
Trench for a 4 × 3 m room, 0.6 m wide, 1 m deep
10.5
m³ to cart away
See how it is worked out
02 · Structure
Concrete Quantities
Turns the size of a slab, beam, column or footing into what you actually buy: bags of cement, sand and ballast. Pick the mix from your drawing and it does the rest.
Use it for
- Ordering materials before a concrete pour
- Estimating the cost of a slab
- Checking site usage against the order
5 × 4 m slab, 150 mm thick, mix 1:2:4
20
bags of cement
See how it is worked out
03 · Structure
Rebar Weight
Steel is bought by weight but drawn by length. This calculator converts bar size and length into kilograms, so you can order steel or check a delivery note in seconds.
Use it for
- Ordering reinforcement from a supplier
- Checking steel deliveries on site
- Quick checks on a BBS total
30 bars of Y12, each 4 m long
106.67
kg of steel
See how it is worked out
04 · Structure
Bar Bending Schedule
Build a full bar bending schedule from your structural drawing. Enter each bar mark and shape, and it works out cutting lengths to BS 8666, weights and how many 12 m bars to order.
Use it for
- Preparing a BBS for the steel fixer
- Learning how cutting lengths are worked out
- Pasting a ready schedule into Excel
112 Y8 links for four 230 × 450 beams
1,275
mm cutting length each
See how it is worked out
05 · Structural analysis
Beam Analysis
Before you design a beam you need the forces inside it. Enter the span, a UDL and a point load, and get the support reactions, the maximum shear force and the maximum bending moment for a simply supported beam or a cantilever.
Use it for
- Checking hand calculations for class and exams
- Getting the design moment for a lintel or beam
- Understanding how loads turn into moments
6 m beam, 10 kN/m UDL and a 20 kN point load
67.22
kNm maximum moment
See how it is worked out
06 · Structure
Slab Reinforcement
Enter the slab panel size and the bars on the drawing, such as Y12 @ 150 main and Y10 @ 200 distribution. It counts the bars in each direction, gives every bar length and the total steel weight to order.
Use it for
- Ordering slab steel for a floor
- Checking a steel fixer's bar count
- Understanding one-way and two-way slab steel
4 × 5 m panel, Y12 @ 150 and Y10 @ 200
180.49
kg of steel
See how it is worked out
07 · Structure
Beam Reinforcement
Top bars, bottom bars and links for a set of identical beams. Link cutting lengths follow BS 8666 shape code 51, so the numbers match what the steel fixer cuts.
Use it for
- Ordering steel for ground and floor beams
- Preparing link cutting lengths
- Checking beam steel quantities
Four 5 m beams, 230 × 450, 3Y16 + 2Y12, Y8 @ 200
187.26
kg of steel
See how it is worked out
08 · Structure
Column Reinforcement
Main bars with their laps for the next floor, plus links, for a set of identical columns. Get the bar lengths, link cutting length and the total weight.
Use it for
- Ordering column steel floor by floor
- Working out starter bar and lap lengths
- Checking column link quantities
Six 3 m columns, 230 × 230, 4Y16, Y8 @ 200
165.55
kg of steel
See how it is worked out
09 · Structure
Lap and Anchorage Length
How far must two bars overlap, and how far must a bar run into a support? Pick the bar size and concrete grade and get lap and anchorage lengths from BS 8110.
Use it for
- Checking laps on site before a pour
- Answering a fundi's 'how much do we overlap?'
- Adding laps to a bar schedule
Y12 bar in C25 concrete
480
mm tension lap
See how it is worked out
10 · Structure
Formwork Area
Works out the formwork contact area for slabs, beams, columns and walls, then the number of 8 × 4 ft plywood sheets to buy, allowing for reuse and wastage.
Use it for
- Pricing formwork for a pour
- Ordering plywood sheets
- Planning formwork reuse across floors
5 × 4 m slab, 150 mm thick
22.7
m² of formwork
See how it is worked out
11 · Structure
Staircase
Enter the floor-to-floor height and get the number of risers, the exact riser height, the treads, the total going and the pitch, with a comfort check on every stair.
Use it for
- Setting out a stair on site
- Checking an architect's stair design
- Class projects on stair design
3,000 mm floor to floor, 175 mm max riser
18
risers of 166.7 mm
See how it is worked out
12 · Walling
Blocks for a Wall
The question we get asked most: how many blocks do I need? Enter the wall size, doors and windows, and your block size. It allows for mortar joints and breakages.
Use it for
- Ordering blocks or machine-cut stones
- Budgeting walling for a house
- Checking a fundi's block count
4 × 3 m room, 3 m high, one door and one window
472
blocks
See how it is worked out
13 · Walling
Plaster Quantities
Once the walls are up, they need plaster. This works out the cement and sand for any wall area, thickness and mix ratio.
Use it for
- Ordering cement and sand for plastering
- Comparing internal and external plaster costs
- Planning materials per room
77 m² of wall, 15 mm, mix 1:4
9
bags of cement
See how it is worked out
14 · Roofing
Roofing Sheets (Mabati)
Counts the roofing sheets for a lean-to or gable roof using the real covered width of each sheet after overlap. It also gives roof area and ridge capping length.
Use it for
- Ordering mabati cut to length
- Budgeting a roof
- Checking a supplier's quote
10 m gable roof, 4.5 m sheets
30
sheets
See how it is worked out
15 · Finishes
Floor Tiles
Enter the room size and tile size, and get the number of tiles, boxes and bags of tile adhesive, with wastage for cuts and breakages already included.
Use it for
- Buying tiles for a room or a whole house
- Avoiding a short order and colour mismatch
- Quick quotes for clients
3.6 × 3 m bedroom, 600 × 600 tiles
9
boxes of tiles
See how it is worked out
16 · Finishes
Wall Paint
Works out how much paint your walls need after taking away doors and windows, for any number of coats, then tells you how many tins or buckets to buy.
Use it for
- Buying paint for a room or building
- Comparing brands by coverage
- Budgeting finishes
4 × 3 m room, 2.7 m high, 2 coats
8
litres of paint
See how it is worked out
17 · Services
Water Tank Capacity
Find the capacity of a rectangular or round water tank in litres, and how many days of water it stores for a household.
Use it for
- Sizing a water tank for a house
- Checking an underground tank design
- Explaining storage to a client
3 × 2 m tank, 1.5 m water depth
9,000
litres
See how it is worked out
18 · Lab testing
Concrete Cube Test
Turn the crushing loads from the lab into concrete strength in N/mm², get the average of three cubes and see how it compares with the grade on the drawing.
Use it for
- Reading a lab cube report
- Material testing practicals
- Early warning on weak concrete
Three 150 mm cubes at 520, 540 and 505 kN
23.2
N/mm² average
See how it is worked out
19 · Every day
Unit Converter
Drawings in mm, plots in feet and acres, loads in kN, concrete strength in MPa. Convert any of them instantly and see the value in every unit at once.
Use it for
- Converting plot sizes from feet to m² and acres
- Reading imperial dimensions on old drawings
- Turning tonnes into kN for load checks
A 50 × 100 ft plot
464.5
m²